MQY as Q5 in the HL LHC era Glyn Kirby MQY 001 bat 927.

Slides:



Advertisements
Similar presentations
. TYPICAL SUPERCONDUCTING MAGNET TEST SEQUENCE. PREPARATORY TESTS AT ROOM TEMPERATURE Lyre Test: Simulate Effect of Thermal Contraction in Cold condition.
Advertisements

Protection study options for HQ01e-3 Tiina Salmi QXF meeting, 27 Nov 2012.
Zian Zhu Superconducting Solenoid Magnet BESIII Workshop Zian Zhu Beijing, Oct.13,2001.
The 23 rd MICE Collaboration Meeting -1- ICST/HIT Jan.13 to 17, Harbin/China Large Prototype Coil Test and Plan Fengyu Xu Institute of Cryogenics.
New HV test specification for the LHC N. Catalan for the EI section.
TE-MPE –TM, 16/05/2013, Mateusz Bednarek, TE/MPE-EE ELQA testing during and beyond LS1.
CLIQ Coupling Loss Induced Quench Magnet protection system for HQ test Overview 1) CLIQ system overview 2) Adding lead to pizza box 3) remote triggering.
HQ TEST CERN by Marta Bajko CERN TE-MSC TF For Hi Lumi and LARP the 16 th of November 2011 CERN.
HQ02b : Test plan overview Test plan overview: Main elements and Open questions H. Bajas TE-MSC-TF H. BAJASUpdate meeting on HQ02b assembly and test plan02/05/2014.
Impact of Cu/NonCu on Quench Protection 1 Impact of Cu/NonCu on MQXF Quench Protection G. Ambrosio, V. Marinozzi, E. Todesco Conductor Video Mtg. April.
HL-LHC/LARP, QXF Test Facility Workshop– R. Carcagno QXF Test Requirements Ruben Carcagno BNL Workshop December 17, 2013.
David Nisbet – LIUWG 17 th July 2008 LIUWG – Options for Powering Phase I David Nisbet Summary of points from LIUWG 7 Existing topology Future topology.
Geneva, 12/06/ Results of Magnetic Measurements on MQXC 02 L. Fiscarelli on behalf of TE/MSC/MM section
MQY-30: Measurement of magnetic cross-talk with imbalanced powering L. Fiscarelli on behalf of TE/MSC/MM
HQ01e CERN test preparation update CERN Team: H. Bajas, M. Bajko, A. Chiuchiolo, G. Deferne, O. Dunkle, J. Feuvrier, P. Ferracin, L. Fiscarelli, F. Flamand,
Superconducting IR Magnets CHEN, Fusan May 11, 2007.
HFM High Field Model, EuCARD WP7 review, 20/1/2011, Philippe Fazilleau, 1/16 EuCARD-WP7-HFM Dipole Conceptual Review Nb 3 Sn dipole protection Philippe.
ISTITUTO NAZIONALE DI FISICA NUCLEARE SEZIONE DI MILANO LABORATORIO ACCELERATORI E SUPERCONDUTTIVITA’ APPLICATA Magnet Test LASA, INFN-Milano.
Joint HiLumi LHC-LARP Meeting – May 11-13, 2015 MQXFA Functional Requirements Ruben Carcagno May 13,
E. Todesco PROTECTION IN MAGNET DESIGN E. Todesco CERN, Geneva Switzerland With help from B. Auchmann, L. Bottura, H. Felice, J. Fleiter, T. Salmi, M.
Test Program and Results Guram Chlachidze for FNAL-CERN Collaboration September 26-27, 2012 Outline Test program Quench Performance Quench Protection Magnetic.
L. Serio COPING WITH TRANSIENTS L. SERIO CERN, Geneva (Switzerland)
Readiness of test stations for design validation Marta Bajko on behalf of the TE-MSC TF team CERN, 11 th December 2014 QXF design review, CERN.
Cold test of SIS-300 dipole model Sergey Kozub Institute for High Energy Physics (IHEP), Protvino, Moscow region, Russia.
Q4 MAGNETS FOR HL-LHC J.M. Rifflet, M. Segreti, E. Todesco WP3 - Q4 magnets for HL-LHC 5th Joint HiLumi LHC-LARP Annual meeting Research supported.
LHC circuit modeling Goal: Create a library of electrical models and results for each circuit Useful and usable for the next 20 years…… Web site cern.ch/LHC-CM.
TE-MPE –EI, TE - MPE - TM 8/12/2011, Antonopoulou Evelina RQS circuit Simulation results Antonopoulou Evelina December 2011 Thanks to E. Ravaioli.
Super Fragment Separator (Super-FRS) Machine and Magnets H. Leibrock, GSI Darmstadt Review on Cryogenics, February 27th, 2012, GSI Darmstadt.
First Q4 cold mass engineering follow up meeting 16/03/2016 Q4 Status update H. Felice, M. Segreti, D. Simon and JM. Rifflet.
MQXFS1 Test Results G. Chlachidze, J. DiMarco, S. Izquierdo-Bermudez, E. Ravaioli, S. Stoynev, T. Strauss et al. Joint LARP CM26/Hi-Lumi Meeting SLAC May.
2 nd LARP / HiLumi Collaboration Mtg, May 9, 2012LHQ Goals and Status – G. Ambrosio 11 Quench Protection of Long Nb 3 Sn Quads Giorgio Ambrosio Fermilab.
LQS01a Test Results LARP Collaboration Meeting 14 Fermilab - April 26-28, 2010 Guram Chlachidze.
TEST FACILITY STATUS FOR TESTING CERN Marta Bajko WP10. EUCARD 2 Task 4 - HTS Magnet Tests, June 2015.
FNAL Workshop, July 19, 2007 ILC Main Linac Superconducting Quadrupole V.Kashikhin 1 ILC Main Linac Superconducting Quadrupole (ILC HGQ1) V. Kashikhin.
Superconducting Cryogen Free Splittable Quadrupole for Linear Accelerators Progress Report V. Kashikhin for the FNAL Superconducting Magnet Team (presented.
The most likely cause of death for a superconducting magnet Input data for thermal modeling of Nb 3 Sn Superconducting Magnets by Andrew Davies Find the.
CLIQ set up QXF Glyn Kirby CERN Dec Over view What exists What do you need What magnet testing is coming soon QXF circuits Hardware proposal.
Ranko Ostojic AT/MEL 1.Beam heat loads 2.Magnet design issues related to heat loads.
Jim Kerby Fermilab With many thanks to Vladimir Kashikhin, the FNAL, KEK, and Toshiba teams. SCRF BTR Split Quadrupole ILC ML & SCRF Baseline Technical.
S. Feher MICE Magnet Readiness Review RAL, June 28th, 2016
MQXC Nb-Ti 120mm 120T/m 2m models
D1 and D2 powering and protection
11T Magnet Test Plan Guram Chlachidze
Model magnet test results at FNAL
MQY-30 Test Result Report
HO Corrector Magnets: decapole test and future plans
Validated magnetic data at cold
LHC Hardware Commissionning
The LHC - Status Is COLD Is almost fully commissioned
Circuit-protection aspects of different preliminary magnet-design options
Q0 magnet, cooling, support ideas
Powering the LHC Magnets
Glyn Kirby Magnet AssemblyTechniques.
HO Corrector Magnets: decapole test and future plans
Concepts for magnet circuit powering and protection M
Update on circuit protection simulations of the HL-LHC Inner Triplet circuit Matthias Mentink, Circuit specifics + STEAM simulations: Samer Yammine, LEDET.
Quench Protection Measurements & Analysis
3 issues identified in review
DOE/SC Status Review of 12 GeV SHMS HB Magnet: Update since Oct 2015
Large aperture Q4 M. Segreti, J.M. Rifflet
MQYY: superconducting Quadrupole magnet for Hl-lhc
HL LHC WP3 (magnets) TASK 2 ADVANCEMENT
Large aperture Q4 M. Segreti, J.M. Rifflet
Hilumi WP3 meeting, 1 October 2014
Q4 development M. Segreti, J.M. Rifflet, E. Todesco
Other arguments to train two sectors to 7 TeV
Hi-pot results summary
MBHSP109 and MBHSP May 2019, Gerard Willering.
ECR on pole order of the HL-LHC IT circuit and resulting implications
Review Bloc 4 and SM18 facilities and upgrade
Presentation transcript:

MQY as Q5 in the HL LHC era Glyn Kirby MQY 001 bat 927

Overview MQY parameter list Proposed change to LHC circuit High Energy in test station comparison Test station modification PSU’s set up, current leads 3 or 4, protection. Test plan Typical out of balance powering

MQY parameters Operating Temp 4.5 K 1.9 K Nom Gradient 160 T/m 200 T/m Nom Current 3610 A 4500 A Inductance 74 mH/aperture Twin aperture clear 70mm diameter Overall length 3.64 m Mass 4.3 tones

Proposed change to LHC circuit and operation

Comparing Quench Energy’s MQXC 12.8KA, 688 kJ HQ. 16.2 KA, 735 kJ MQY 4.5 K , 3.61 kA, 482 kJ/ap. 964 kJ 160 T/m MQY 1.9 K , ultime performance 110% of nominal gradient, 5.0 kA and 220 T/m, 950 kJ /Ap. 1900 kJ

Operating Area 5000 A, 5000A 2000 kJ 1.9K 958 kJ 4.5K 4500 A, 2250 A 936 kJ 50% diff HQ 750 kJ 934 kJ 90 % diff field measurement ? 3600 A 5030 A

HQ test

Standard Circuit in LHC Std PSU in LHC is limited to I2=50% I1

SM18 Test set up ? Ideal set up 4 current leads Two dumps Two switches QPS set up ? PSU1 4500 A PSU2 2250 A Or use quench heaters to protect magnet

Test cycles 50% A1/A2 MAX A1-A2 90% A1/A2 Example of the type of cycle we will need. Slow ramp rates 3.8 A/s ~ 20 mins ramp. Staircase with field measurement every 500 A in both apertures 1 hr flat top at max field / current configuration Check joints, may need to open up part of the joint box to get V-taps in? Three machine cycles!

MQY Test project MQY ? Mount current lead-box on magnet, for independent powering? Electrical testing Quench heaters (insulation , discharge) Magnet Ground insulation Field Measurements ? Cold testing.

Cold testing Set up rotating field probes in both apertures? Std. electrical checks. Cool down 4.3 tonnes larger than MQ. 3 days? Set up QPS Test field measurement. 1 day, may be more? Training 1.9 K, 4 quenches a day ? 2 days 50% and 90% A1/A2 at 4.5 kA 2.25 kA & ?/? Field measurement with 50% diff. 2 days QLIQ test , reconfigure onto one PSU. ? Simulation needed! Warm up, thermal cycle ?. Total 12 to 15days

Conclusions / Comments Two power supplies, control set up needed High energy , carful pre testing to predict pressure and limit it! Field measurement two rotating probes, or only measure one aperture, or thermal cycle to be abler to measure both apertures at all currents. Two to three week testing >>>>>>>>>>>>>>>> Joint tests after siting in air for 7 to 10 year’s? open joint box and have a look! Should we also test MQM?