AV Graft Conversion Project: Summary and Lessons Learned

Slides:



Advertisements
Similar presentations
(Individuals with Disabilities Education Improvement Act) and
Advertisements

PD Plan Agenda August 26, 2008 PBTE Indicators Track
MU Center for SW-PBS College of Education University of Missouri Behavior Intervention Plans: Monitoring Student Progress.
Network 11 Quality Update Chris Singer, MAN, RN, CNN December 4, 2008.
ESRD N ETWORK 6: QAPI D EVELOPMENT FOR D IALYSIS P ROVIDERS Leighann Sauls RN, CDN Director, Quality Improvement.
Clinical Indicator Goals Project
The presentation will begin at 2pm. Best Practices for Decreasing Catheters Yolanda Richmond BS, RN, CDN Southeastern Kidney Council, Inc. ESRD Network.
FFBI Change Concepts FFBI Change Concept #12 Presented by: Ellen DePrat, MSN, RN, NE, CPHQ Project Coordinator - HealthInsight (QIO for Nevada/Utah) October.
Strategies for Improving Adequacy Decreasing the Risk of Premature Death Educate Your Dialysis Team Review Proper Procedure for Drawing Lab Samples - Lab.
Quality Improvement Projects for MOC MOC Credit for the Work You Do Every Day * Additional notes added by CPQCC.
Hospital Patient Safety Initiatives: Discharge Planning
ELIGIBILITY PROCEDURES FOR SPECIAL EDUCATION SERVICES Chapter Seventeen.
QIO Program Overview December 6, About VHQC Private, non-profit healthcare consulting and quality improvement organization More than 60 experienced.
Quality Improvement Prepeared By Dr: Manal Moussa.
Tennessee Department of Education Compliance Training February 2012 Department of Exceptional Children.
Creating a service Idea. Creating a service Networking / consultation Identify the need Find funding Create a project plan Business Plan.
Aligning Academic Review and Performance Evaluation (AARPE)
Wayne County Hub Discharge Planning Valerie Langley, RN, Nurse Manager Wayne County Hub NC Department of Corrections May 2, 2007.
Fistula First Initiative Update Network of New England Combined MRB/BOD Meeting Sturbridge, MA November 18, 2008 Andrew Brem, MD Network.
MARC – Network 5 5 Diamond Patient Safety Program
Including Student Growth in Educator Evaluation Day 3 Monitoring and Adjusting January, 2014.
Alex Rosenblum, BSRN, CNN, CPHQ Quality Management Coordinator ESRD Network of Texas Sponsored.
ACTION PLAN FOR INCREASING AV FISTULA USE COMPLETION STEPS 1.Assess your current AV Fistula Outcomes 2.Identify the root causes / barriers to AV Fistula.
1 Show Me The Progress Bonnie Greenspan Judith Kari.
PBIS Meeting for BCPS Team Leaders and Coaches March 14, 2008 Oregon Ridge.
Why Vascular Access Coordinator (VAC)
Improvement Planning Mischele McManus Infant/Toddler and Family Services Office of Early Childhood Education and Family Services July 20, 2007
Catheter Wipeout Initiative: Updates Lisle Mukai, QI Coordinator
Orientation and Summer Institutes Implementer’s Forum October 2005 Susan Barrett PBIS Maryland.
Managing and Leading an Instructionally Driven School Culture Part 2 January 2011 Rebekah Marler Consultant, Replications Inc.
About District Accreditation Mrs. Sanchez & Mrs. Bethell Rickards Middle School
Fistula First: AV Fistula Maturation Project Svetlana (Lana) Kacherova, QI Director Lisle Mukai, QI Coordinator ESRD Network 18 July 22,
1 Clinical Indicator Goals Project: Developing QAPI Without Fear Svetlana (Lana) Kacherova, QI Director Lisle Mukai, QI Coordinator ESRD Network 18 November.
2009 Standardized Mortality Ratio Project: Summary Svetlana (Lana) Kacherova, QI Director Lisle Mukai, QI Coordinator ESRD Network 18 July 21, 2009.
IPRO ESRD Network Program Long Term Catheter Reduction 2016 Quality Improvement Activity February 9, 2016.
Increasing AVF Rates in Facilities with AVF Rates < 50% Project Lisle Mukai, QI Coordinator ESRD Network 18 September 30, 2009.
1 Fistula First: AV Fistula Maturation Project Svetlana (Lana) Kacherova, QI Director Lisle Mukai, QI Coordinator ESRD Network 18 October 23, 2008.
Fistula First: AV Graft Conversion Project
Accreditation (AdvancED) Process School Improvement Activities February 2016 Office of Service Quality Veda Hudge, Director Donna Boruch, Coordinator of.
Purpose of Teacher Evaluation and Observation Minnesota Teacher Evaluation Requirements Develop, improve and support qualified teachers and effective.
Reduction in Long-Term Catheter Rate Project Lisle Mukai, QI Coordinator ESRD Network 18 October 1, 2009.
CAMBA QI PROJECT Improving Clients’ Involvement In & Documentation of Medical Care ANGELES DELGADO November 14 th, 2006.
Baseline The baseline at July Previously there was a lack of consistency for: Pathways into specialist clinics; Policies, procedures and guidelines.
ANNA JERSEY NORTH CHAPTER 126 Presents: Presents: CMS CONDITIONS OF COVERAGE CMS CONDITIONS OF COVERAGE Climbing the Mountain Climbing the Mountain March.
Academic Promotions Information session for applicants Lisa Jessup, Ian Solomonides, Kate Wilson and colleagues March of 18.
Continuing Medical Education Guidance for Planners of Regularly Scheduled Series (RSS) To insert your company logo on this slide From the Insert Menu Select.
Governing Body QAPI 2013 Update for ASC
Thank You for Joining Us We Will Begin Shortly
Team Meetings in Early Intervention
Polices, procedures & protocols
Join the Falls Prevention Virtual Learning Collaborative
Supervisor observation and sign off process
Documentation and Reporting
Understanding the Section 504 Process
Understanding the Section 504 Process
Vascular Access Care Educating staff and patients on importance of receiving preventive vascular access care.
DECREASING HOSPITALIZATIONS IN DIALYSIS PATIENTS
Overview of the FEPAC Accreditation Process
Kansas Educator Evaluation
Vascular Access Best Practice Sharing Stories
Educator Effectiveness Regional Workshop: Round 2
Phase 4 Milestones.
Hi, My name is Paige Nielsen
90 Day Catheter Reduction
Identifying Multiple Measures and Defining Significance
Dolores Hagan, RN BSN K-HEN Education and Data Manager August 2012
Module 3 Part 2 Developing and Implementing a QI Plan: Planning and Execution Adapted from: The Health Resources and Services Administration (HRSA) Quality.
Aligning Academic Review and Performance Evaluation (AARPE)
Presentation transcript:

AV Graft Conversion Project: Summary and Lessons Learned Svetlana (Lana) Kacherova, QI Director Lisle Mukai, QI Coordinator ESRD Network 18 July 23, 2009

Additional Goal: Reduce Catheter Use! “Fistula First” GOAL Goal is to maximize autogenous AVF construction & success rate….. To achieve in the shorter term (2006) the initial K/DOQI minimum benchmark of AVF use in 40% of prevalent patients…. And in the long-term (2009), a 66% AVF rate in prevalent patients Additional Goal: Reduce Catheter Use!

Fistula First Goals (AVF Rates) CMS goal – 66% AVF Yearly Network 18 goal – 57.8 % by June 30, 2010 Yearly Network Stretch Goal – 58.0% by June 30, 2010 May 2009 AVF rates: NW 18 – 56.3% US – 52.6%

Tools & Best Practices: Fistula First Change Concepts Routine CQI Review of vascular access Timely referral to nephrologist Early referral to surgeon for “AVF Only” Surgeon Selection Full range of appropriate surgical approaches Secondary AVFs in AFG patients AVF evaluation/placement in catheter pts Cannulation training Monitoring and maintenance Continuing Education Outcomes feedback Although the major objective of the FFBI is to increase the prevalence of AVFs, the 11 Change concepts cover all areas of vascular access and include all of the ingredients needed for a comprehensive VAMP.

Inclusion Criteria for Participating Facilities AVF rate < 50% (April SIMS data) Highest percentage and number of AV Grafts Patients census > 50 patients Administrative support: All intervention facilities have a stable leadership

Exclusion Criteria Patient census < 50 patients Facilities already included in another QIWP project with the Network

Project Timelines Oct. 2008 – Environmental scan and WebEx Nov. 2008 – RCA and PDSA (steps 1-3) Dec. 2008 – 1st follow-up Jan-Feb. 2009 – 2nd follow- up March-Apr. 2009 – 3rd follow up May 2009 – final follow-up June 2009 – Project summary and closure

Network Role During the Project: Project Leader Supplied the templates for RCA & PDSA Supplied facilities with tools and knowledge Periodically monitored and provided feedback Conducted phone interviews to obtain facility-specific data Chased you for data & documentation    Assisted your facility to stay in compliance with the QAPI program requirements

V626 QAPI Condition Statement The dialysis facility must develop, implement, maintain and evaluate an effective, data driven, quality assessment and performance improvement program with participation by the professional members of the interdisciplinary team... …The dialysis facility must maintain and demonstrate evidence of its quality improvement and performance improvement program for review by CMS

Project Summary

Change Concept # 6: Secondary AVF Placement in Patients with AV Grafts Nephrologists evaluate every AV graft patient for possible secondary AV fistula, including mapping as indicated, and document plan in patient’s record. Dialysis facility staff and/or rounding nephrologists examine outflow vein of all forearm graft patients (“sleeves-up”) during dialysis treatments (minimum frequency = monthly) to identify patients

Change Concept # 6: Secondary AVF Placement in Patients with AV Grafts (continued) Nephrologist refers to surgeon for evaluation/placement of secondary AV fistula before failure of AV graft. Fistula First considers an AVG that has clotted at least once a FAILING GRAFT.

Summary of Facility QAPI Strategies Patients and Families: Educate patients and their families about the advantages of an AV fistula (staff and nephrologists) Patient-to-patient teaching Post posters and have handouts available in the lobby regarding types of vascular accesses and vascular access care

Summary of Facility QAPI Strategies (continued) Facility and Staff: Designate a Vascular Access Coordinator/ Manager to oversee the facility’s vascular access program Inform nephrologists and surgeons about the AV Graft Conversion Project Inform nephrologists and surgeons about the facility’s expectations in regards to vascular access

Summary of Facility QAPI Strategies (continued) Facility provide the Fistula First surgical video to surgeons to review Medical Director to interact with other nephrologists and vascular surgeons as needed Have nephrologists start expanding their vascular access surgeon pool in the area Nephrologists will identify successful surgeons outside the local area

Summary of Facility QAPI Strategies (continued) Educate staff and nephrologists on how to perform a “Sleeves Up” assessment – use video Initiate/implement the “Sleeves Up” assessment to identify patients (staff and nephrologists) Staff and nephrologists educate the patients Have nephrologists refer patients to surgeons

Summary of Facility QAPI Strategies (continued) Schedule vein mapping of AVG patients that have clotted at least once if not previously done Obtain a copy of the vein mapping results and keep in the patient’s chart Assist patient and families in scheduling vascular access related appointments Conduct stenosis monitoring and surveillance

Summary of Facility QAPI Strategies (continued) Document problems and observations and report to the Nephrologist Refer patients for fistulogram after fist sign of graft failure Maintain a monthly vascular access tracking log – type of access, events, and status of the access

Summary of Facility QAPI Strategies (continued) Review vascular access reports during QAPI meetings (URR, Kt/V, stenosis surveillance reports, dialysis prescription, etc.) Discuss the project and the facility’s progress during QAPI meetings and brainstorm other ideas for increasing the facility’s AVF rate Document all events that occur with the patient’s AVG and submit to the insurance company stating reasons for patient needing to have an AVF evaluation and placement

Activities that support successful conversion: Consider an AV graft with at least one clotting episode to be a failing graft The nephrologist should have the patient evaluated for a possible secondary AV fistula, including vein mapping as indicated

Series of activities that support successful conversion: (continued) 3. A secondary AVF plan should be discussed with the patient, family, staff, nephrologist and surgeon in anticipation of an AVF creation at the earliest evidence of graft failure and the plan should be documented in the patient’s chart 4. The facility should have a plan of care in place to avoid the need for a catheter when the graft fails and there is urgency for an immediate usable access

Series of activities that support successful conversion: (continued) 5. A “Sleeves-Up” exam should be performed monthly to identify patients who can be candidates for a graft to fistula conversion 6. At the sign of a second impeding AVG failure, the patient should be sent for an AV fistula conversion

Next Steps Ensure that all AVG patients are evaluated for secondary AVF placement Have a process in place for a secondary AV fistula placement for lower arm AVG patients Educate the patients, families, nephrologists and surgeons about the concept of a secondary AV fistula placement Refer to the Fistula First website for resources regarding this Change Concept. www.fistulafirst.org

Next Steps Have a process in place to ensure that the newly created AV fistula develops to maturity Perform physical assessment of the access with every treatment Send the patient for a 4 week follow-up with the surgeon/vascular access center to evaluate the maturation process If the access is not maturing, the surgeon can then revise or implement interventions to salvage the access.

Svetlana (Lana) Kacherova, QI Director skacherova@nw18.esrd.net Lisle Mukai, QI Coordinator lmukai@nw18.esrd.net 6255 Sunset Boulevard  Suite 2211  Los Angeles  CA  90028 (323) 962-2020  (323) 962-2891/Fax  www.esrdnetwork18.org