1. Install the heat insulation on the floor. 2. Install the power film on the heat insulation. 4. Connect the thermostat and temperature sensor with power.

Slides:



Advertisements
Similar presentations
Lets make a... Advent Calendar. Youll need: Hammer, Measure, Spirit level, File, An electric drill with drills size 10 Raw plugs, Screws and a Wrench.
Advertisements

Hoop House Construction. Parts of the hoop house Frame Hoops Braces Plastic cover.
Choose level of difficulty
SAMPLE SECTIONS OF 2DK TSHEL2 DRAFT VERSION: FOR REVIEW AND DISCUSSION OF INSULATION AND INTERIOR PANELS.
Interior Wall and Ceiling Finish
Presentation for carbon heating film installation. Dear Customers, the carbon heating film is a new and advance heating technology used for wooden and.
Cabinet and Countertop Installation
WOOD LIGHT FRAME CONSTRUCTION
Installation of. Congratulations for choose this GSM car alarm system for your car. Taking a few minutes to watch this Installation Guide and read the.
Fastening and Prying Tools
CON 4003 Construction Estimating Prof R. V. Locurcio.
Competency: Draw Wall Sections
Manchester 09/sept/2008A.Falou & P.Cornebise {LAL-Orsay}1 CALICE Meeting/ Manchester Sept 2008 SLAB Integration & Thermal Measurements.
( 1 ) PROCEDURE FOR FLAT HEAT PRESS OPERATION PROCEDURE FOR MULTI FUNCTION HEAT PRESS MACHINE.
Electrical Wiring Circuit Board Project. STEP 1 - Identify all Parts of the Project Saw Drill Driver w/ bits Drill w/bits (not pictured) #2 Phillips Screwdriver.
Michael Norgan Radiant Sales Manager Michigan – Indiana - Ohio.
Dishwasher Rework. Identify Unit Disconnect Power Turn off Breaker… … or unplug power cord.
Side, 100 mm diameter. 10mm Plywood Ridge. 22mm x22mm x 110mm softwood, shaped like diagram. Galvanized wire mesh 6mm squares. 125 mm x 230mm. Stapled.
Wood Screws Woodscrews are available in a wide range of shapes, sizes and materials. While mild steel wood screws are suitable for interior work brass.
Installing Cable Floor Heating Systems This presentation will give you a practical idea of how to install a floor heating system.
Chapter 7 Metals.
Competency: Draw wall sections and details. Objective: Apply concepts of wood sill and floor construction.
Spray Painting. Primer Paint A primer is a preparatory coating put on materials before painting. Priming ensures better adhesion of paint to the surface,
House Construction. Learning Standard 5. Construction Technologies Construction technology involves building structures in order to contain, shelter,
House Construction. Learning Standard 5. Construction Technologies Construction technology involves building structures in order to contain, shelter,
Residential Construction Unit 6 Interior finishes Mr. Todzia.
Wall and Ceiling Construction Vocabulary
© Learning and Teaching Scotland 2006 Soldering Soldering makes a permanent joint between two pieces of metal. It can be used on most metals but not aluminium.
Problem Solving: Area and Surface Area of Composite Figures
COMMERCIAL SERIES TRI-POINT ANCHORING SYSTEM
㈜ D.S.T. 자료용 1. Power film Installation 1. Install the heat insulation on the floor. 2. Install the power film on the heat insulation. 4. Connect the thermostat.
IET 120 CONSTRUCTION PROJECT Name: Clarence Hunt.
Construction Residential Houses Definition of a House: A structure serving as a dwelling for one or more persons, especially for a family.
Designing for a Sustainable WORLD Cost and Efficiency Trade-offs in Solar Water Heater Design.
What is Thermal Bridging? A reduction of the effectiveness of insulation to reduce conductive heat flow through the building envelope otherwise know as.
How to Build Your Playhouse. September 08, 2006 By Kay Adams, Tamecha Buck, Janet Herron & Lisa Weston “Click on pictures”
Wall and Ceiling Construction
Finishing the Building
Garden Sheds. Agenda Overview – Next level – good example to teach construction skills – Includes layout skills – transferable to other projects – Orientation.
Can Sculpture Basic Techniques with Recycled Materials.
ENGINEERING NOTES KID WIND By: Luis.C Miguel.M. Materials List  Screws……………….. ( base attachment )… …..#26  Nails………………….. ( Base attachment ) #10.
Section 2: Safety, Tools and Equipment, and Shop Practices
E12 Students will be expected to recognize, name, and represent figures that tessellate.
How to Build a Divider Wall By Charysse Roberson.
Neutrino 1 Assembly Process. Neutrino 2 Assembly Process Step 1: Basement I beams positionned and fixed on the ground. Flatness checked.
Level 1 Diploma in Plumbing Studies © 2013 City and Guilds of London Institute. All rights reserved. 1 of 23 PowerPoint presentation Preparation techniques.
Date/Time Requested: _______________ 1. Please build 2 Information Tent Bulletin Boards 2. Please follow suggested A-Frame Design (See attached suggested.
APPLICATIONS OF TECHNOLOGY
Section 2 Safety, Tools and Equipment, Shop Practices Unit 6: Fasteners.
Floor System Sizes and Materials
Substrate Identification Floors. Principal Substrates T & G floorboards Flooring grade boards Concrete Screeded concrete Tile Backer Boards Under Floor/Under.
Board Replacement Laminate-Angle/Angle & Lock & Fold
Electrical Wiring Circuit Board Project
Timber Framed Buildings
Competency: Draw Wall Sections
Objectives Describe the fasteners, anchors, and adhesives used in construction and explain their uses. f. Identify various types of mechanical anchors.
Find Area Mrs. Planavsky 4th Grade.
AU Media/ER/Toyota/Tech/Gen 7/06 Toyota Tundra
Competency: Draw wall sections and details.
Let Your RV or Trailer be Operated at Peak Performance
How to Build a House.
Required tools for installation of a V-1020C Speaker with V-9914M-5 Metal Bridge.
Wood and Metal fasteners
3.04 understand materials and finishes of residential design
Required tools for installation of a V-1020C speaker with V-9914 bridge.
Competency: Draw Wall Sections
Can Sculpture Basic Techniques
Reservoir Loop.
3.04 understand materials and finishes of residential design
Omega Selection Center
Presentation transcript:

1. Install the heat insulation on the floor. 2. Install the power film on the heat insulation. 4. Connect the thermostat and temperature sensor with power film. 3. Connect the wire to power film. * Install procedure

LaminatefloorCarpetWoodtile * Sectioned drawing Ground Power Film PE-form Insulation sheet (side view) (plane figure) plywood

1.Carpet / PVC Floors Install the heat insulation on the floor. Install the film on the heat insulation. Cover the carpet on the film CLOSING - 1 Install the heat insulation on the floor. Install the film on the heat insulation. Install the DST form on the film. Cover the PVC floors on the DST form. NOTICE Please check the local heating. Carpet DST form PVC Floors

2.Laminate flooring / Wood tile 10.CLOSING - 2 Install the heat insulation on the floor. Install the film on the heat insulation. Install the form on the film. Install the laminate floor. Form plywood Install the heat insulation on the floor. Install the film on the heat insulation. Fixed the plywood by concrete nail after install the plywood on the film. Install the wood tile after spray the bond on the plywood. concrete nail and anchor Spray bond Wood tileLaminate floor

10.CLOSING Solid wood flooring Plywood Install the heat insulation on the floor. Install the film on the heat insulation. Fixed the plywood by concrete nail after install the plywood on the film. Stick the solid wood floor after paint the epoxy on the plywood. Make hole by hammer drill. Insert the concrete anchor to hole. Fixed by screw. * Cross section Solid wood Flooring