LARP Rotatable Collimators for LHC Phase II Collimation

Slides:



Advertisements
Similar presentations
MICE RF Cavities and RFCC Module Update Derun Li Lawrence Berkeley National Laboratory MICE RF Workshop Daresbury Laboratory, UK April 17, 2012 April 17,
Advertisements

Coll Eng E Doyle 1/18 LARP Phase II Secondary Collimator RC1 Prototype Engineering Status 6/21/06 Jaw-hub-shaft concept - continued Permanent.
Status of the LARP Phase II Secondary Collimator Prototype 30 September 2013 LHC Collimation WG Meeting Tom Markiewicz/SLAC BNL - FNAL- LBNL - SLAC US.
RF Measurement Plan Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory January 20, 2011 MICE Video Conference Meeting.
Update Hardware for conductive cooling of the quench resistors has been fabricated at LBNL. Preparation for installation to start this week. Installation.
Status of the LARP Phase II Secondary Collimator Prototype 14 October 2013 LHC Collimation WG Meeting Tom Markiewicz/SLAC BNL - FNAL- LBNL - SLAC US LHC.
ILC Main Linac Superconducting Cryogen Free Splittable Quadrupole Progress Report V. Kashikhin for Superconducting Magnet Team.
SLAC rotating collimator for HiRadMat beam tests 14 March 2014 S. Redaelli, A. Bertarelli, CERN T. Markiewicz, SLAC US LHC Accelerator Research Program.
LARP Rotatable Collimator Prototype Assembly completed and all mechanical tests successful: Cooling tubes now twist, under vacuum, as jaws turn, with R~1.
LARP Rotatable Collimator Prototype Assembly completed and all mechanical tests successful: Cooling tubes twist, under vacuum, as jaws turn, with R~1 m.
LARP Rotatable Collimator Prototype Assembly completed and all mechanical tests successful: Cooling tubes twist, under vacuum, as jaws turn, with R~1 m.
LARP Rotatable Collimators for LHC Phase II Collimation 26 October 2006 LARP Collaboration Meeting – Port Jefferson, NY Tom Markiewicz/SLAC Representing.
K. Alam, CLIC workshop, October 16-18, CLIC workshop, October 2007 Working group “ Two beam hardware and integration” Test module in the two.
LARP Rotatable Collimator Prototype Assembly completed and all mechanical tests successful: Cooling tubes now twist, under vacuum, as jaws turn, with R~1.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory MAP Winter Collaboration Meeting at JLab, Virginia February 28, 2011.
Beam LARP Rotatable Collimator Mechanical Engineering Discussion 03 October 2008 Phase II CERN ME Video Mtg. Tom Markiewicz/SLAC BNL - FNAL- LBNL - SLAC.
Summary of Accelerator Systems Collimation Parallel Session 19 October 2007 LARP CM#9 - SLAC Tom Markiewicz/SLAC BNL - FNAL- LBNL - SLAC US LHC Accelerator.
LHC Phase II Collimator teleconference - 4 March 2008LHC Rotatable Phase II Collimators 1 beam LARP Phase II collimator Progress and Plans 4 March 2008.
LARP LHC PHASE II COLL RC1 TESTS - S. Lundgren 06 June 2006 No 1 /17 LARP Phase II Secondary Collimator RC1 Collimator Test Program Plan Forward Revised.
LARP LHC PHASE II COLL RC1 TESTS - S. Lundgren 16 May 2006 No 1 /22 LARP Phase II Secondary Collimator RC1 Collimator Test Program Revised 5/15/06.
SLAC RC Status Report 30 August 2010 LHC Collimation Working Group Meeting Tom Markiewicz/SLAC BNL - FNAL- LBNL - SLAC US LHC Accelerator Research Program.
SLAC R&D Mtg November 2007LHC Rotatable Phase II CollimatorsSlide # / 17 beam LARP Rotatable Collimators for LHC Phase II Collimation 12 November.
LARP LHC PHASE II COLL RC1 - S. Lundgren 1 April 2009 No 1 /6n LARP Phase II Secondary Collimator RC-1 Mechanical Design Review 01/04/09.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory MICE CM29 at RAL, UK February 17, 2011.
LARP Rotatable Collimators for LHC Phase II Collimation 18 April 2007 LARP Collaboration Meeting – Fermilab Tom Markiewicz/SLAC Representing Gene Anzalone,
Beam Rotatable Collimators as a Possible US Contribution to the LHC Luminosity Upgrade Project 20 June 2008 LARP DOE Review Tom Markiewicz/SLAC BNL - FNAL-
Task List for Phase II Rotatable Collimator Project at SLAC 30 January 2007 CERN/LARP Video Meeting Tom Markiewicz/SLAC BNL - FNAL- LBNL - SLAC US LHC.
MICE Prototype Coupling Coil Fabrication Update Allan DeMello Lawrence Berkeley National Laboratory MICE CM38 - Napa California February 25, 2014 February.
Collimation Overview 28 October 2008 LARP CM11, Fermilab Tom Markiewicz/SLAC BNL - FNAL- LBNL - SLAC US LHC Accelerator Research Program 1)Short Status.
LARP LHC PHASE II SECONDARY COLLIMATOR CD1 REVIEW. - E. Doyle 15 Dec /25 LARP Phase II Secondary Collimator RC1 Review SLAC 12/15/05 Prototype Engineering.
MQXF Short model and prototype plans P. Ferracin, G. Ambrosio HL-LHC/LARP International Review of the MQXF Design December 10-12, 2014 CERN.
LARP Rotatable Collimators for LHC Phase II Collimation 09 July 2007 SLAC R&D Status Meeting Gene Anzalone, Eric Doyle, Lew Keller, Steve Lundgren, & Tom.
LARP Rotatable Collimators 19 June 2006 ILC R&D Status Meeting Tom Markiewicz/SLAC BNL - FNAL- LBNL - SLAC US LHC Accelerator Research Program.
LARP LHC PHASE II COLL RC1 TESTS - S. Lundgren 30 Jan 2007 No 1 /13 LARP Phase II Secondary Collimator RC1 Collimator Development and Test Program Status.
LARP LHC PHASE II COLL RC1 TESTS - S. Lundgren 10 Dec 2007 No 1 /12 LARP Phase II Secondary Collimator RC1 Collimator Development and Test Program Status.
Eric Prebys, Fermilab Program Director, LARP July 10, 2012.
LARP LHC PHASE II COLL RC1 - S. Lundgren 21 Sep 2009 No 1/17 LARP Phase II Secondary Collimator RC-1 Collimator Development Status and Outlook Revised.
Status of MICE RF for Step V’ (at LBNL) Derun Li Lawrence Berkeley National Laboratory December 6, 2014.
Summary Session Advanced Collimation CARE-HHH-APD BEAM'07 R. Assmann.
RF Module Update MICE Collaboration Meeting 44 Andrew Lambert Lawrence Berkeley National Laboratory March 30 th, 2016.
201 MHz Cavity Plans Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory February 11, 2011 MAP Friday Video Conference Meeting.
PXIE RFQ Engineering Design Steve Virostek Engineering Division Lawrence Berkeley National Laboratory April 10, 2012 Project X Collaboration
RFCC Engineering Status and Plans Allan DeMello Lawrence Berkeley National Laboratory MAP Winter Meeting March 6, 2012 March 6, 2012.
LARP Crab Cavities Cryomodule Integration Meeting Final Notes A.Ratti LBNL.
1 SLAC RC Status Report 19 July 2010 LHC Collimation Working Group Meeting Jeff Smith/SLAC BNL - FNAL- LBNL - SLAC US LHC Accelerator Research Program.
Prototype Cryomodule FDR Ken Premo 21 – 22 January 2015 High Power Coupler Design.
LARP Phase II Secondary Collimator Status Report SLAC ILC R&D Summary Meeting 24 April 2006 T. Markiewicz/SLAC.
ISTCInternational Science and technology Center, MoscowOfficial Coordinator BINPBudker Institute of Nuclear Physics of Siberian Branch of Russian Academy.
LARP Contributions to LHC Phase II Collimation
QXF Coil Fabrication & Tooling Reaction / Impregnation
LARP Phase II Secondary Collimator RC1, ETC - Status 4/10/06
Status of material tests
LARP Phase II Secondary Collimator RC1
Complementary ISTC Projects #3888, 3889p
Review on collimator movement with stepping motors
LARP Phase II Secondary Collimator RC1
LARP Phase II Secondary Collimator RC1
LARP Phase II Secondary Collimator RC1 Review SLAC 12/15/05 RC1 Construction and Test Plan LARP LHC PHASE II COLL REVIEW – RC1.
LARP Phase II Secondary Collimator RC-1
SLAC RC Status Report US LHC Accelerator Research Program
Review on collimator movement with stepping motors
Recommendations of 12/16/05 review committee & SLAC response
23 April 2012 Tom Markiewicz/SLAC
LARP Phase II Secondary Collimator RC1
LARP Phase II Secondary Rotatable Collimator
LARP Phase II Secondary Collimator RC-1
LARP Phase II Secondary Collimator RC-0 and RC-1
LARP Phase II Secondary Collimator RC-1
Micro Status Report of SLAC Phase II Plan Tom Markiewicz SLAC
LARP Phase II Secondary Collimator RC-0 and RC-1
Presentation transcript:

LARP Rotatable Collimators for LHC Phase II Collimation US LHC Accelerator Research Program BNL - FNAL- LBNL - SLAC LARP Rotatable Collimators for LHC Phase II Collimation 18 December 2006 SLAC R&D Status Meeting Gene Anzalone, Eric Doyle, Lew Keller, Steve Lundgren, & Tom Markiewicz

LHC Phase II Collimator Engineering-I Braze Test #1 Section Braze Test #1 SLAC R&D Mtg. - 18 December 2006 LHC Rotatable Phase II Collimators

LHC Phase II Collimator Engineering-II 200mm Al Mandrel for Coil Winding & CNC Mill Tests Coil Winding Fixture 200mm Cu mandrel w/ coil after brazing Cu ¼-round jaw section before braze to coil/mandrel SLAC R&D Mtg. - 18 December 2006 LHC Rotatable Phase II Collimators

LHC Phase II Collimator Engineering-II 1m winding tooling Full Length Moly Shaft Mill vise as precision bender SLAC R&D Mtg. - 18 December 2006 LHC Rotatable Phase II Collimators

Short Braze Tests prior to full length jaw Braze Test #2 Immediate schedule 200mm mandrel machined for the braze wire groove and the OD reduced (~0.4mm diameter) to eliminate tubing distortions. QC department measured the 4 Quarter Jaw IDs and the Test Mandrel and determined modifications to the Jaws are necessary. Jaw inner surface modified by shop Klystron Braze Shop will then braze the 4 jaws on 200mm long Assy Promise completion date 12/19/06: in furnace now Assembly will then be sectioned for braze joint inspection. Braze test #3 planned: A second 200mm long Copper mandrel will be fabricated for more Jaw braze technique development and winding practice before the full size 9050mm Heater Test Mandrel is attempted Molybdenum to copper braze tests are in the planning stages SLAC R&D Mtg. - 18 December 2006 LHC Rotatable Phase II Collimators

Single Jaw Thermal Test Hardware Progress Clean Tent infrastructure upgrades nearing completion. Electricians have installed ~half required conduit SOC contacted. Told to get blessings of Earthquake, ES&H, High Energy Experimental and Electrical Safety Committees Molybdenum Shaft completed and in house on 11/28/2006 Jaw 1/4 sections qty 22 released to vendor (includes 2 spares and 4 for additional Short Mandrel Tests) Late January anticipated Improved/Revised Mandrel design released to vendor for fabrication Mid January date promised SLAC R&D Mtg. - 18 December 2006 LHC Rotatable Phase II Collimators

Other Tests & Design Work for 1st Jaw Coil Tests Bend 10mm sq. OD/ 7mm sq. ID copper samples into design configurations to check for distortions (internal and external) Samples are being fabricated from 11mm sq. CDA101 conductor Interested in knowing how much the tube deforms inward (relative to Mandrel OD) as a result of winding If deformation is unacceptable may need to bulge it back out by over-pressurizing the tube after brazing Twist tests Twist a few samples to failure for a measure of the margin of safety and to determine actual torque required Detail design work on Collimator End Supports and Bellows Assy Prototype “Rotator” design for proof-of-concept testing U-Joint for initial deflection tests Fabrication of appropriate CERN hardware Drawing Trees and Lists for this are in work SLAC R&D Mtg. - 18 December 2006 LHC Rotatable Phase II Collimators

Upstream end vertical section 1mm jaw-shaft expansion gap Jaw Geneva Mechanism Worm Gear Shaft Water Cooling Channel U-Joint Axle Support Bearings SLAC R&D Mtg. - 18 December 2006 LHC Rotatable Phase II Collimators

Image Current Plate with RF Contacts SLAC R&D Mtg. - 18 December 2006 LHC Rotatable Phase II Collimators

LHC Rotatable Phase II Collimators RF Contacts at Jaw Ends SLAC R&D Mtg. - 18 December 2006 LHC Rotatable Phase II Collimators

Longitudinal Contact Options Top and Bottom are CERN existing design Alternate Options also use CERN contacts Favorite Option uses Omega Co. contacts SLAC R&D Mtg. - 18 December 2006 LHC Rotatable Phase II Collimators

LHC Rotatable Phase II Collimators Inside detail Possible Option ? SLAC R&D Mtg. - 18 December 2006 LHC Rotatable Phase II Collimators

LHC Rotatable Phase II Collimators Beam tests in 2007-2008 (??) Beginning to think about a Dummy Collimator for use in beam tests in 2007/2008 before final prototype is delivered for damage tests: no rotation no cooling one jaw 2 jaw steppers For impedence tests: 2 Jaws 4 steppers Image Current Plate with RF springs no water cooling ??? What tests are really possible in 2007? Should we be preparing this hardware? SLAC R&D Mtg. - 18 December 2006 LHC Rotatable Phase II Collimators

LARP Collimator Delivery Schedule Done Braze test #1 (short piece) & coil winding procedures/hardware Finish Braze test #2 (200mm Cu) Braze test #3 (200mm Cu – apply lessons learned) Fab/braze 950mm shaft, mandrel, coil & jaw pieces Prep heaters, chillers, measurement sensors & fixtures, DAQ & lab 2007-06-01 1st full length jaw ready for thermal tests Fab 2nd 950mm jaw as above with final materials (Glidcop) and equip with bearings, rotation mechanism, end supports, rf features, cooling features, motors, etc. Modify 1st jaw or fab a 3rd jaw identical to 2nd jaw, as above Mount 2 jaws in vacuum vessel with external alignment features 2008-01-01 2 full length jaws with full motion control in vacuum tank available for mechanical & vacuum tests in all orientations (“RC1”) Modify RC1 as required to meet requirements 2009-01-01 Final prototype (“RC2”) fully operational with final materials, LHC control system-compatible, prototype shipped to CERN to beam test SLAC R&D Mtg. - 18 December 2006 LHC Rotatable Phase II Collimators