LHC Morning Meeting - G. Arduini

Slides:



Advertisements
Similar presentations
8:16 SB 25ns dumped by RF; integrated lumi 0.6 nb-1. 9:14 BIC problem in TI8 and CMS recovering their tracker 10:09 Abort gap cleaning commissioning. 16:29.
Advertisements

Bunch Flattening with RF Phase Modulation T. Argyropoulos, C. Bhat, A. Burov, J. F. Esteban Müller, S. Jakobsen, G. Papotti, T. Pieloni, T. Mastoridis,
Monday 29 October 08:48 V/dM scan CMS end of fill #3236. Check of “fast scan”. 10:06 V/dM scan finished, start of RF studies, reducing RF voltage. 11:10.
LHC Progress Friday 30 th October 2015 Coordination Week 44: Massimo Giovannozzi, Wolfgang Hofle, Jorg Wenninger.
LHC Progress Thursday 29 th October 2015 Coordination Week 44: Massimo Giovannozzi, Wolfgang Hofle, Jorg Wenninger.
09:25 Operator dump fill #2178, integrated lumi 107/108/18 nb-1. Trip of RQ4.R6 (fire heaters discharged) just after the beam dump but the QPS gave no.
Proposal to change bunch length during physics fills to assess beam induced heating after LS1 M. Barnes, P. Baudrenghien, A. Burov, S. Claudet, S. Jakobsen,
Monday – Morning L. Drosdal: Injection line TI8: IQC threshold for BPM H from 2mm to 2.5mm to avoid unnecessary latches due to variations.
Wednesday :06 Dump fill 3533: interlock BPMS in IP6
Summary of week 40 Machine Coordinators: G. Arduini, M. Lamont
Machine Coordinators: G. Arduini, J. Wenninger
Longitudinal beam parameters and stability
Wednesday September 14th
Friday 18/03 07:15 Test ramp with pilot after the test of dynamic FIDEL correction. Ramp was OK, but fill was stopped due to the trip of several RQTFs.
Saturday 21st April 00:33 Interlock during ramp on BLM HV
Friday 30th September 06:00 Operator dump fill #2171, int. lumi about 75 pb-1 Previous operator dump from physics was on 14 September ! 07:00 Start of.
Friday 07:00 Power glitch on the EDF network. Point 8 affected.
MD25 ns - 14/12/2012 G. Arduini, H. Bartosik, G. Iadarola, G. Rumolo
LHC Morning Meeting - G. Arduini
Week 46 Week 46: Machine coordinators: Roger Bailey – Gianluigi Arduini Main aims of the week: Stable beams with ions Scheduled stop for ion source refill.
Tue :25 Beams dumped due to RF vacuum interlock
Wednesday /Thursday 09-11:00 Verification of the LSS6 interlocked BPMs: took longer to fill due to some problems with RF cavities in the PS. In the mean.
LHC Morning Meeting - G. Arduini
LHC Morning Meeting - G. Arduini
Summary of Week 11: 14 – 21 March
Summary of week 44 Aims of week 44 J. Wenninger & J. Uythoven
LHC Morning Meeting - G. Arduini
Thursday 17th May 01:11 Fill #2633 dump in squeeze arc circulator load channel Ad1B 03:16 Fill #2644 Stable beams, lumi 5.2e33 cm-2s-1 04:38 Dumped by.
MD#4 Progress MD Coordinators: Giulia Papotti, Frank Zimmermann
Summary of Week 16 G. Arduini, J. Wenninger
Lost at 12:05 to power converter (RTQX2.R1) problem
LHC Morning Meeting - G. Arduini
LHC Morning Meeting - G. Arduini
Wednesday 30th November 10:00 Access PZ33 for RP, Cryo, EPC, ELQA
Friday 14th December - morning
Summary of Week 26 Main aims: G. Arduini, B. Holzer, M. Lamont
Saturday – Morning 7:36 beams dumped
LHC Morning Meeting - G. Arduini
BI cont. *** Summary Matching Monitor test *** We only had ~15minutes of inject and dump, but managed to see a profile with ~9e9 p (!)
Saturday 7th May Sat – Sun night
Sunday/Monday & :30 Stable beams. Fill #1851.
Summary of week 19 Machine Coordinators: G. Arduini, M. Lamont Main aim: Luminosity production.
LHC Morning Meeting - G. Arduini
Rocky last 24 hours Losses Q6.R5 Orbit SIS TCDQ OK! Power converters
LHC Morning Meeting - G. Arduini
Scrubbing progress - 08/12/2012
IP8 aperture measurements (07:30-10:30)
LHC Morning Meeting - G. Arduini
Thursday 26th July 13:21 Fill 2880 beam dumped
Thursday – Morning Energy matching at injection with H CODs
Monday 6th 07:39 Dump fill #1854, RQ6.L2 tripped, followed by access
Friday 14th September 03:15 Beta* at 1 km. Optics measurements, see yesterday. 07:00 Dump. 08:00 Refill with 3 nominal bunches for high beta. 11:15 Beams.
Saturday :42 stable beams fill 3541
LHC Morning Meeting - G. Arduini
LHC - Week 38 Technical stop: Katy Foraz
Tuesday 20 September 2011.
Mon 2/4 08:00-13:00: Access for: Experiments Power converters BBQ
Saturday 06/11 Triplet R8 tripped during ramp for collision setup.
Friday h55 Stable beams. Fill #1841. Lumi ~1.2e33.
Another Immortal Fill….
Monday 10th December - morning
Monday 27th August & night
Thu :00 Dumped beams, refill for Pb-Pb physics. No more protons in 2011… Some changes: Increase of flat top total voltage to 14 MV. Feed-forward.
Saturday 6th October 05:38 STABLE BEAMS # :06 OP dump
31/3/2010 Difficult day… but at the end stable beams.
Saturday 26 November 2011.
Tuesday
Tuesday
Saturday 29th October Friday during IP2 1 m squeeze test
Presentation transcript:

LHC Morning Meeting - G. Arduini Friday 5/10 – Saturday 6/10 18/01/2019 LHC Morning Meeting - G. Arduini

LHC Morning Meeting - G. Arduini Friday 5/10 – Saturday 6/10 08:16 Sector 81 trip RQ8.L1 (QPS noise)  - Pre-cycle 10:00 Injecting. Setting up of the damper gain modulation and BBQ gated measurement on beam 1. Successful ramp with gated gain modulation (lower gain on first 6 bunches). Gated BBQ (on first 6 bunches) running in parallel to “standard” BBQ. 12:10 Colliding in IP1/5. Peak luminosity >7.5x1033 cm-2s-1. 12:18 STABLE BEAMS #3133. Initial luminosity 7.3x1033 cm-2s-1. 23:00 – 02:20 Test with bunch length variation 02:47 OP dump: ~187 pb-1 in 14.5 h. ~250 pb-1 in 24 h. 03:38 injecting Struggling: trip of ROD.A45.B1 before starting the ramp (restarted), tune feedback not locking. 05:38 STABLE BEAMS #3134. Initial luminosities: 6.77x1033 cm-2s-1. 18/01/2019 LHC Morning Meeting - G. Arduini

LHC Morning Meeting - G. Arduini ALICE Scan for determining peak lumi (~5x1030 cm-2s-1). Sufficient? 18/01/2019 LHC Morning Meeting - G. Arduini

Bunch length variation (B. Salvant, Ph. Baudrenghien et al.) Aim: end of fill test with gentle variation of the bunch length (~+/-5%) to measure beam induced heating effects and bunch spectra on machine components with moderate bunch intensities. Preparation for possible additional machine studies (to be approved) B1: 12  15 MV B2: 10  14.5 MV 18/01/2019 LHC Morning Meeting - G. Arduini

Bunch length variation (B. Salvant, Ph. Baudrenghien et al.) Bunch profiles and beam spectra measured while varying the RF voltage at flat top. At each voltage level observed: Beam spectrum, from a 3 GHz PU, short cable to UX45 platform, then fiber optics link (3 GHz BW) to SR4 and spectrum analyzer. Must be corrected for cable attenuation. Profile of a "reference" bunch measured with same PU, short cable and 2.5 GHz BW scope in UX45. We have noted FWHM. Trailing edge of pulse is modified by cable. To be corrected. Rising edge is not affected much. The spectrum of B1 was more gaussian (no side-lobe) then B2 from end-ramp (This fill has been continuously monitored). 14.5 MV B2 15 MV B19 18/01/2019 LHC Morning Meeting - G. Arduini

Bunch length variation (B. Salvant, Ph. Baudrenghien et al.) Observations on temperatures following RF voltage increase on both beams: Collimators: TCP.B6L7.B1: not much seen. TCTVB:with imagination, a small increase can be seen on temperatures of TCTVB.4R8 (B2) and TCTVB.4L8 (B1) at around 23:30 ALFA: clear change of slope on ALFA detector temperatures for B1 first and then B2, consistent with the reduction of bunch length (plot in UTC time from ATLAS logging). The 4 curves for the B2 detectors are all well above the 4 curves for the B1 detectors). Beam screens: LSS very quiet, activity observed on arc beam screens when bunch length was changed (sector 34 and 56) BSRT: some temperature probes (but not all) show changes of slope consistent with bunch shortening on B1 and lengthening and shortening on B2 MKI: nothing special seen on real time temperatures TDI: nothing special seen on pressure in 4L2 and 4R8 Off-line analysis to be performed 18/01/2019 LHC Morning Meeting - G. Arduini

LHC Morning Meeting - G. Arduini Pending Operational Development Gated tune measurement with reduced damper gain on first 6 bunches  ongoing Damper test at injection of the increased bandwidth with 50 ns beam (after MD3) Batch by batch blow-up (after MD3) 18/01/2019 LHC Morning Meeting - G. Arduini