CesrTA Experimental Schedule and Priorities

Slides:



Advertisements
Similar presentations
CesrTA Status Report Linear Collider Workshop of the Americas 2009 Mark Palmer for the CesrTA Collaboration October 1, 2009.
Advertisements

Global design effort 2008 DOE/NSF review June 30, 2008 Global design effort Americas Slide 1 CesrTA Status and Planning for FY08-09 David Rubin Mark Palmer.
LEPP, the Cornell University Laboratory for Elementary-Particle Physics, has joined with CHESS to become the Cornell Laboratory for Accelerator-based Sciences.
Ultra-Low Emittance Storage Ring David L. Rubin December 22, 2011.
Electron Clouds at SLAC Johnny Ng ILC Damping Rings Collaboration Meeting March 4, 2009.
25-26 June, 2009 CesrTA Workshop CTA09 Electron Cloud Single-Bunch Instability Modeling using CMAD M. Pivi CesrTA CTA09 Workshop June 2009.
August 9, 2007M. Palmer1 CESR Machine Studies Planning Overview Principal Projects Other Milestones and Dates Machine Studies Schedule Proposed Plan.
March 7, 2007 LET Issues (Cai/Kubo/Zisman) Global Design Effort 1 Low-Emittance Tuning Issues and Plans Yunhai Cai, Kiyoshi Kubo and Michael S. Zisman.
C ESR TA R&D Program Mark Palmer for the C ESR TA Collaboration May 13, 2010 ILC PAC Meeting - Valencia.
EC R&D at SLAC, KEK, INFN, CERN –Details from KEK, INFN and CERN EC R&D CesrTA –Examples of RFA and SPU studies –Survey of results on mitigations –Buildup.
Beam dynamics on damping rings and beam-beam interaction Dec 포항 가속기 연구소 김 은 산.
Project Management Mark Palmer Cornell Laboratory for Accelerator-Based Sciences and Education.
C ESR TA Results October 19, 2010 Mark Palmer for the C ESR TA Collaboration.
CesrTA Experimental Plan M. Palmer for the CesrTA Collaboration November 17, 2008.
C ESR TA R&D Program & U.S. DR Activities Mark Palmer for the C ESR TA Collaboration June 9, 2010 ILC ART Review - FNAL.
CesrTA EC Build-Up and Mitigation Program - Introduction Mark Palmer June 25, 2009.
CesrTA Status Report & R&D Planning Mark Palmer Cornell University April 21, 2010.
July 16-17, 2007 Joint NSF/DOE Review of CesrTA Proposal 1 * Mitigation techniques planning still underway with ILC DR group Answer to Questions 1 and.
2008/7/281 ILCDR08 Report - Electron Cloud Session – Univ. Y. Suetsugu, KEK.
Electron Cloud Mitigation Studies at CesrTA Joseph Calvey 10/1/2009.
Compare options: simulations recent history Cloud density near (r=1mm) beam (m -3 ) before bunch passage, values are taken at a cloud equilibrium density.
Compare options: simulations recent history Cloud density near (r=1mm) beam (m -3 ) before bunch passage, values are taken at a cloud equilibrium density.
ILC DR Workshop - KEK December, A new resonance in wiggler simulations: Christine Celata Use POSINST code.
02/04/2009 AS-TAGL Mtg Global Design Effort 1 CesrTA Update Mark Palmer CLASSE.
GDE, 26 Oct 2007, FNAL Global Design Effort 1 Damping Rings Area System Summary Andy Wolski.
Motivation and Overview David Rubin Cornell Laboratory for Accelerator-Based Sciences and Education.
C ESR TA Status Report July 22, 2010 Mark Palmer for the C ESR TA Collaboration.
Cesr-TA Simulations: Overview and Status G. Dugan, Cornell University LCWS-08.
Electron cloud measurements and simulations at CesrTA G. Dugan, Cornell University 4/19/09 TILC09 4/18/09.
November 18, 2011David L. Rubin1 CESR Test Accelerator – Investigation of the physics of charged particle beams Circumference = 768m - Beam energy
CesrTA Status Report Mark Palmer Cornell University September 2, 2009.
01/08/2009 AS-TAGL Mtg Global Design Effort 1 CesrTA Update Mark Palmer CLASSE.
Electron Cloud Issues for the 3.2km Positron Damping Ring Mark Palmer (Cornell University) GDE January 18, 2011 ILC Baseline Assessment Workshop 2 SLAC.
Summary David Rubin Cornell Laboratory for Accelerator-Based Sciences and Education.
CESR Test Accelerator Optics Correction and Tuning Tools David Sagan Cornell University.
WebEx meeting November 17, 2009 ILC Damping Ring Working Group on Electron Cloud LC e- cloud Working Group November 17, 2009.
ILC Damping Ring Test Facilities Status Report Mark Palmer Cornell University May 9, 2009 ILC PAC Review, Vancouver.
Damping Ring Session Summary S. Guiducci TILC09 Tsukuba 21 April 2009.
Electron cloud study for ILC damping ring at KEKB and CESR K. Ohmi (KEK) ILC damping ring workshop KEK, Dec , 2007.
R&D GOALS AND MILESTONES TOWARDS A TECHNICAL DESIGN REPORT TDR (2008) First Intnl. Teleconference Ecloud, Impedance/Instabilities - M. Pivi, SLAC 31 October.
Global Design Effort ILC Damping Rings: R&D Plan and Organisation in the Technical Design Phase Andy Wolski University of Liverpool and the Cockcroft Institute,
CesrTA Status and Plans Joe Calvey 10/15/08. CesrTA Status and Plans- CLIC08 Introduction CesrTA is a program to reconfigure the CESR storage ring at.
Characterization of the Fast Ion Instability at CesrTA David Rubin Cornell University.
Electron Cloud in the International Linear Collider ILC Mauro Pivi work performed while at SLAC and the ILC Damping Ring Working Group High.
Observations and Predictions at CesrTA, and outlook for ILC G. Dugan, on behalf of M. Billing, K. Butler, J. Crittenden, M. Forster, D. Kreinick, R. Meller,
Observations of Electron Cloud Phenomena at PETRA III Presentation at the ECLOUD 2012 workshop Rainer Wanzenberg ECLOUD 2012 June 5-8, 2012 Hotel Hermitage.
Electron Cloud Experimental Plans at Cesr-TA ILCDR08 - July 10, 2009 G. Dugan Cornell Laboratory for Accelerator-Based Sciences and Education.
CesrTA E-cloud Activities (Jan. 2009) J.W. Flanagan, KEK.
45 th ICFA Beam Dynamic Workshop June 8–12, 2009, Cornell University, Ithaca New York Jim Crittenden Cornell Laboratory for Accelerator-Based Sciences.
49th ICFA Advanced Beam Dynamics Workshop. October 8–12, 2010 LEPP, the Cornell University Laboratory for Elementary-Particle Physics, has joined with.
LEPP, the Cornell University Laboratory for Elementary-Particle Physics, has joined with CHESS to become the Cornell Laboratory for Accelerator-based Sciences.
Mark Palmer for the CESRTA Collaboration
Electron Cloud Effects in SuperB
Electron Cloud and Ion Experimental Program
Electron Cloud R&D at Cornell ILCDR08--7/8/08
CesrTA Status Report Mark Palmer July 8, 2009.
Oversea collaborators
CesrTA Status and Planning
Detailed Characterization of Vacuum Chamber Surface Properties Using Measurements of the Time Dependence of Electron Cloud Development Jim Crittenden.
RECENT DEVELOPMENTS IN MODELING
Why Study Electron Clouds? Methods and Tools to Study Electron Clouds
J.A.Crittenden, Y.Li, X.Liu, M.A.Palmer, J.P.Sikora (Cornell)
Utilization of KEKB for ILC R&D
Recent Electron Cloud Studies at CESR and Future Plans
The Proposed Conversion of CESR to an ILC Damping Ring Test Facility
Electron cloud studies at CESR
CLIC damping rings working plan towards the CDR
Electron Clouds at SLAC
CTA 09 - Introduction David Rubin Cornell Laboratory for
R&D GOALS AND MILESTONES TOWARDS A TECHNICAL DESIGN REPORT TDR (2008)
Presentation transcript:

CesrTA Experimental Schedule and Priorities Mark Palmer June 26, 2009

August Run [D] = down day [L] = ≤ shift [M] = few shifts [H] = several shifts August Run Machine Start : July 23rd CesrTA Run: July 30-Sept 8 (~62 Exp Shifts, 16 down) EC Build-Up and Mitigation Mitigation Studies including characterization of the beam processing [M] Grooved chamber in dipole (SLAC) – Al with TiN coating Grooved chamber in wiggler (CU-KEK-LBNL-SLAC) – bare Cu surface initially a-C chamber (drift region in arc) New chambers to help characterize general EC Build-up in CESR [M] Al chamber (drift region in arc) Al chamber in Quadrupole Chicane measurements [H] SEY system commissioning [D] Instrumentation BPM system commissioning and switchover [H,D] Positron xBSM measurements [H] Tuning tools Multi-bunch measurements (14ns) 5 GeV chip test 4ns readout checks Electron xBSM line and detector commissioning [H] Vis. Light BSM commissioning [M] Schottky spectrum? Feedback system (4ns) configuration for experiments [L] Optics and LET Tuning and correction with new instrumentation (significant commissioning time) [H] Sextupole distribution and tune footprint issues (for EC measurement flexibility) [L] Test new correction techniques [M] Knob development [L] IBS studies and lifetime measurements [M] Characterization of remaining machine errors and problems that impact vertical emittance reach [L] EC Dynamics Coherent Tune Shift Measurements [M] Witness bunch and bunch-by-bunch (14ns) size measurements [M] Head-tail instabilities Incoherent emittance growth Utilize ring-wide bunch-by-bunch BPM system to characterize local cloud density [L] Bunch-by-bunch phases Instability modes and thresholds Significant commissioning and some limitations as instrumentation is still in transition [H] Feedback system BPM BSM Injection Tune-up June 25, 2009 CTA09

Future Upcoming Runs Long Lead Items Nov 17 – Dec 23, 2009 Dates essentially fixed March 2010 - July 2010 - Long Lead Items Wiggler chamber with electrode NEG mitigation experiment design Follow-on tests with coatings added Grooved wiggler chamber Q15 Al chamber Instrumentation Tools Planning Experiments Simulating Experiments in Advance June 25, 2009 CTA09