Working Journal Chad Fernelius
Dayt Construction Internship 2006 Projects: Huish Detergents (converted a warehouse into a production facility) Farmington Greens subdivision Salt Lake avenues basement remodel High priced homes Korloff Jewelers at the Gateway Parker International new office
DAYT- Huish job Prepared and painted floor with epoxy coating Prepared and painted floor with epoxy coating
DAYT- Huish job Created, installed, and used small scale concrete forming for exterior and interior utility pads Created, installed, and used small scale concrete forming for exterior and interior utility pads
DAYT- Huish job Installed door closers Installed door closers
DAYT- South Weber home Installed Installed Trex decking
DAYT- miscellaneous Framed drops, fireplace hearths, and other change orders. Framed drops, fireplace hearths, and other change orders. Supervised a basement remodel Supervised a basement remodel Poured sidewalks and driveways Poured sidewalks and driveways Paint- touchups and the Parker job Paint- touchups and the Parker job Executed change orders, repairs, punch lists, and inspection lists. Executed change orders, repairs, punch lists, and inspection lists. Supervised laborers Supervised laborers Installed hardware Installed hardware
Scott Call Construction custom finish work Projects along the northern Wasatch Front Projects along the northern Wasatch Front Performed all aspects of finish work including doors, closets, stairways, and trim-work. Performed all aspects of finish work including doors, closets, stairways, and trim-work.
Finish work Paint-grade Paint-grade door and casing
Finish work Stain-grade Stain-grade double door double door
Finish work Doors Doors with glass
Finish work Custom door mantle Custom door mantle
Finish work Base board Base board
Finish work Crown Crown
Finish work Crown Crown
Finish work Waffle ceiling wrapped and finished with alder Waffle ceiling wrapped and finished with alder
Finish- column wraps
Finish work Wall finishes and column wraps (shadow boxes) Wall finishes and column wraps (shadow boxes)
Finish- recessed panels
Finish- bead board
Finish- bead board- window sills
Finish- flex mold- base
Finish- mantle
Finish- closets
Finish- cold storage In Inprogress
Finish- railing
Finish- fiberglass columns
Finish work- Summary All of the finish work shown was completed by me except for the railings- of which I only helped to complete. As of August 2008, I have filled a vacancy in the company to be a lead carpenter and to install railings & ballustrades. All of the finish work shown was completed by me except for the railings- of which I only helped to complete. As of August 2008, I have filled a vacancy in the company to be a lead carpenter and to install railings & ballustrades. I have also learned laminate and hardwood flooring through Scott Call Construction I have also learned laminate and hardwood flooring through Scott Call Construction My original internship (fall 2006) was with DAYT My original internship (fall 2006) was with DAYT I have learned many finish skills from Scott Call Construction from present. I have learned many finish skills from Scott Call Construction from present. Other trades mastered preceding my internship include framing, siding- soffit & fascia & raingutters, and insulating. Other trades mastered preceding my internship include framing, siding- soffit & fascia & raingutters, and insulating.
Prior Experience Showcase My construction job experience began in 2004 as a framer. Prior to this experience, I became interested in construction at a young age by visiting homes under construction in my neighborhood. I began creating in high school by being heavily involved in the wood shop. I also volunteered for Habitat for Humanity for several months. My construction job experience began in 2004 as a framer. Prior to this experience, I became interested in construction at a young age by visiting homes under construction in my neighborhood. I began creating in high school by being heavily involved in the wood shop. I also volunteered for Habitat for Humanity for several months.
Framing I began framing for a sub contractor named Jason Randall. I grasped concepts easily and became capable of running a project from start to finish after less than six months of working experience. I began framing for a sub contractor named Jason Randall. I grasped concepts easily and became capable of running a project from start to finish after less than six months of working experience. During this job I found it necessary to take time off for school. As a result I worked for another framing subcontractor named Brandon Christopher. I returned to my original employer and worked independently with my brother Russell. During this job I found it necessary to take time off for school. As a result I worked for another framing subcontractor named Brandon Christopher. I returned to my original employer and worked independently with my brother Russell.
Framed homes The following are homes completely framed by my brother and I without our employers direct supervision. The following are homes completely framed by my brother and I without our employers direct supervision.
West Layton framed July 2005
Clinton framed August 2005
West Layton framed September 2005