Working Journal Chad Fernelius. Dayt Construction Internship 2006 Projects: Huish Detergents (converted a warehouse into a production facility) Farmington.

Slides:



Advertisements
Similar presentations
The process whereby human beings convert raw materials into finished products or useful goods designed to make ____ product ______ one on-site.
Advertisements

Put Quaker reference into logo format gold and blue.
West Elementary School May 16, % Construction Documents.
PARKVIEW APARTMENTS 20 Unit Rehabilitation & Site Work ISLA VISTA, CA. Joint Cities-County Affordable Housing Task Group October 23, 2008.
Willie Lee Dillard 561 Ridgecrest Drive, Danville, VA * Phone: * The following is.
An Overview of the Production Process. -Stable Workforce -Controlled Environment -Less Waste -Repetitive Tasks -Lean Manufacturing Principles -Just-in-time.
Why we need a new Building We are now a 1,000 member club. The current structure was designed to accommodate 200 (on its best day) The current.
Measuring Carpentry and Miscellaneous Items
Park School Modernization Summer New paint, new glass, new landscape, new flagpole, and new paving Before After Entry.
The Home Inspection Book: A Guide for Professionals By Marcia Darvin Spada Copyright, Thomson/South-Western, 2003, Revised, 2006.
THE PROJECT BRIEF… BUILD A CONTEMPORARY HOME ON A SMALL INNER CITY BLOCK WITH NO ROOM FOR ONSITE STORAGE OR SCAFFOLD.
NOTE: REFERENCE PROJECT MANUAL DATED 1/20/14 FOR THE BALANCE OF PROJECT REQUIREMENTS & SPECIFICATIONS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). PHOTO. NO.DATE:
IN GOD’S HANDS SERVICE CAMP 2013 Attended by Ruth, Barb, Carrie, Gilda, Patty, Martha Karl, Keith, Paul R., Ayars Parker, Kevin, James, Hunter and Chaplain,
Skyscraper Construction
Grimsby Secondary School
DATE: 1/20/14 REVISIONS Construction Services 170 Long Lane Middletown, CT WESLEYAN U N I V E R S I T Y A-1 MAJOR MAINTENANCE FY15 WEST ELEVATION.
Civil Engineering & Architecture 2.3 Residential Design.
WESLEYAN P BID PACKAGE #19
F ROM M AIN S TREET… … T O Y OUR S TREET !. E XPERIENCE Four years of apprenticeship 30 years as a carpenter Shop steward and foreman on union jobs Notable.
Cleaning out the stable for the girls. Bathroom window – we have to leave the stained glass and sash and install the new window on the outside of them.
Inspecting Exterior Systems. Over-All Observation While outside, stand back and take a look at the over-all home and site. Is ridgeline straight and level?
DGET 1360 Nielson Homes Shady Meadows Design Competition Finished Sq. Ft. Rambler.
Elevations.
Carpentry Basically a person who builds or repairs wooden structures, as houses, scaffolds, or shelving.
THE SCOPE OF THIS PROJECT IS LIMITED TO THE FRONT AND REAR PORCHES AND IS DEFINED AS FOLLOWS: FRONT PORCH REMOVE EXISTING PORCH RAILINGS, STAIR RAILINGS,
Construction Residential Houses Definition of a House: A structure serving as a dwelling for one or more persons, especially for a family.
Floor Plan Dimensions and Notes
Construction Carpenter Vocabulary Created by The University of North Texas in partnership with the Texas Education Agency.
Demonstrating a Home Under Construction Purpose: To use your knowledge of the construction process and production USPs to influence the sales process and.
CONSTRUCTING HOMES & OTHER BLDGS. Preparing the Construction Site –Clearing the Site: the site must be cleared of anything that would get in the way of.
Chapter 23 Plumbing Systems. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Identify several.
General Contractors  Over 10 years of Service  Commercial  Military Institutions  Government Agencies  Female Owned and Operated Firm  Teamed with.
Click here for Game Rules & Instructions: Copyright © 2009, Steve Beutler, All rights.
Finishing the Building
INTD 54 other components. moldings cover, enhance and decorate a plain surface standing trim: fixed length—doors & windows.
Allison Morrow’s Senior Project 5/18/15 – 6/9/15.
Kitchen ItemCostWhereStyle Sink Faucet$135 (paid)C-listBrushed stainless Sink ` Main Countertop Island Countertop Island Cabinet Cabinet hardware.
Cost Cutting Workshop 10/29/2006. Overview Standardizing Across Neighborhoods This could save us the most money, up to appx $7-10k per unit. Architects.
EDT Elevations1 Weekend Cabin Retreat Project Elevations Sacramento City College EDT 300/ENGR 306.
Presented by: Gossling Construction & Seamless Gutters Keith Gossling - Owner Lauren Ragone - Administrative Assistant.
Competency: Draw exterior elevations
Emmaus House of Saginaw 733 S. 14 th Street, Saginaw, MI The name “Emmaus” is from the Bible, Luke 24: In the Bible, it designates the.
 Overview of Interior Finishes  Types  Examples.
High Efficiency Home with full Warehouse/Guesthouse and Cabana House By: Sutton Yanosky.
The space behind the window sill has to be filled up with concrete and the cavity walls have to be filled up with insulation. One way is to pump the insulation.
Building Your Future with Mountain Peak Homes Corinne T. Moritz Bella Vista Subdivision, Mountain Peak Homes1.
Lesson 5.  The carpentry trade covers many items. That is, it is not confined to a few specific items such a reinforcing steel, painting etc.  Common.
Construction Foundations of Technology Construction © 2013 International Technology and Engineering Educators Association STEM  Center for Teaching and.
Administration Offices Proposed by: Wyatt Marvin and Mitch Sander.
How Our Earth Sheltered Homes are Constructed Earthlog ® Equity Group, Inc. The American Dream … The Future is Now
Rosemead.
Condominium Work Order Request Rowell Estates
Unitized vs Pre-Engineered vs NxtWall
Wild Dunes Luxury Price Reduced!
What’s with Time Square West? No. of Floors 43 Retail 1st and 2nd floor Parking 5 floors(2 basement, 3rd to 5th floor) No. of units 738 No. of parking.
APPLICATIONS OF TECHNOLOGY
Introducing the Dakota 28483D
Foundations of Technology Construction
Major Steps In Building a SFR
Lumber in a house You will need 3 sheets of lined paper
Features, Renovations and Improvements
966 Hardwood Lane Summerville, SC ~ MLS# ~ $650,000
Competency: Draw exterior elevations
VINYL SIDING / CARPENTRY SECTION EXISTING CONDITION PHOTOS
Section and Details Vocabulary and Basic Information
Nielson Homes Design Competition Finished Sq. Ft. Rambler
House Construction Budget Plan
New White Lake Township Library
Foundations of Technology Construction
Chapter 22 Building Sections. Chapter 22 Building Sections.
Presentation transcript:

Working Journal Chad Fernelius

Dayt Construction Internship 2006 Projects: Huish Detergents (converted a warehouse into a production facility) Farmington Greens subdivision Salt Lake avenues basement remodel High priced homes Korloff Jewelers at the Gateway Parker International new office

DAYT- Huish job Prepared and painted floor with epoxy coating Prepared and painted floor with epoxy coating

DAYT- Huish job Created, installed, and used small scale concrete forming for exterior and interior utility pads Created, installed, and used small scale concrete forming for exterior and interior utility pads

DAYT- Huish job Installed door closers Installed door closers

DAYT- South Weber home Installed Installed Trex decking

DAYT- miscellaneous Framed drops, fireplace hearths, and other change orders. Framed drops, fireplace hearths, and other change orders. Supervised a basement remodel Supervised a basement remodel Poured sidewalks and driveways Poured sidewalks and driveways Paint- touchups and the Parker job Paint- touchups and the Parker job Executed change orders, repairs, punch lists, and inspection lists. Executed change orders, repairs, punch lists, and inspection lists. Supervised laborers Supervised laborers Installed hardware Installed hardware

Scott Call Construction custom finish work Projects along the northern Wasatch Front Projects along the northern Wasatch Front Performed all aspects of finish work including doors, closets, stairways, and trim-work. Performed all aspects of finish work including doors, closets, stairways, and trim-work.

Finish work Paint-grade Paint-grade door and casing

Finish work Stain-grade Stain-grade double door double door

Finish work Doors Doors with glass

Finish work Custom door mantle Custom door mantle

Finish work Base board Base board

Finish work Crown Crown

Finish work Crown Crown

Finish work Waffle ceiling wrapped and finished with alder Waffle ceiling wrapped and finished with alder

Finish- column wraps

Finish work Wall finishes and column wraps (shadow boxes) Wall finishes and column wraps (shadow boxes)

Finish- recessed panels

Finish- bead board

Finish- bead board- window sills

Finish- flex mold- base

Finish- mantle

Finish- closets

Finish- cold storage In Inprogress

Finish- railing

Finish- fiberglass columns

Finish work- Summary All of the finish work shown was completed by me except for the railings- of which I only helped to complete. As of August 2008, I have filled a vacancy in the company to be a lead carpenter and to install railings & ballustrades. All of the finish work shown was completed by me except for the railings- of which I only helped to complete. As of August 2008, I have filled a vacancy in the company to be a lead carpenter and to install railings & ballustrades. I have also learned laminate and hardwood flooring through Scott Call Construction I have also learned laminate and hardwood flooring through Scott Call Construction My original internship (fall 2006) was with DAYT My original internship (fall 2006) was with DAYT I have learned many finish skills from Scott Call Construction from present. I have learned many finish skills from Scott Call Construction from present. Other trades mastered preceding my internship include framing, siding- soffit & fascia & raingutters, and insulating. Other trades mastered preceding my internship include framing, siding- soffit & fascia & raingutters, and insulating.

Prior Experience Showcase My construction job experience began in 2004 as a framer. Prior to this experience, I became interested in construction at a young age by visiting homes under construction in my neighborhood. I began creating in high school by being heavily involved in the wood shop. I also volunteered for Habitat for Humanity for several months. My construction job experience began in 2004 as a framer. Prior to this experience, I became interested in construction at a young age by visiting homes under construction in my neighborhood. I began creating in high school by being heavily involved in the wood shop. I also volunteered for Habitat for Humanity for several months.

Framing I began framing for a sub contractor named Jason Randall. I grasped concepts easily and became capable of running a project from start to finish after less than six months of working experience. I began framing for a sub contractor named Jason Randall. I grasped concepts easily and became capable of running a project from start to finish after less than six months of working experience. During this job I found it necessary to take time off for school. As a result I worked for another framing subcontractor named Brandon Christopher. I returned to my original employer and worked independently with my brother Russell. During this job I found it necessary to take time off for school. As a result I worked for another framing subcontractor named Brandon Christopher. I returned to my original employer and worked independently with my brother Russell.

Framed homes The following are homes completely framed by my brother and I without our employers direct supervision. The following are homes completely framed by my brother and I without our employers direct supervision.

West Layton framed July 2005

Clinton framed August 2005

West Layton framed September 2005