Developing a Project Plan CHAPTER SIX Student Version Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Advertisements

SDN + Storage.
Scheduling.
Scheduling Resources and Costs CHAPTER EIGHT Student Version Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Chapter 8: Scheduling Resources and Costs
MANAGING PROJECT RESOURCES. Resource Allocation Problem  A shortcoming of most scheduling procedures is that they do not address the issues of resource.
McGraw-Hill/Irwin© 2008 The McGraw-Hill Companies, All Rights Reserved Scheduling Resources and Costs Chapter 8.
Risk Severity Matrix 7-7. Risk EventResponse Contingency Plan Trigger Who is Responsibl e.
Developing a Project Plan
RESOURCES Roger D. H. Warburton © Kanabar / Warburton,
12-1 Resource Management Chapter 12 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall.
Resource Management Chapter 12.
© 2015 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part.
Project Management 6e..
Resource Management Copyright © 2013 Pearson Education, Inc. Publishing as Prentice Hall.
Project Management Cost and Resources
12-1 ELC 347 project management Week Agenda Integrative Project –4 th part Corrected.. Fedd back sent –5 Th part due –Outline of deliverables.
Project Management: A Managerial Approach
Software project management (intro) Resource allocation.
6 Resource Utilization Teaching Strategies
OPSM 639, C. Akkan Resource Planning Resources affect the schedule, cost and performance of a project. Resources are –Individual people, departments/teams,
Resources Management Dr. Ahmed Elyamany.
Copyright 2009 John Wiley & Sons, Inc. Chapter 9 Resource Allocation.
Copyright 2012 John Wiley & Sons, Inc. Chapter 9 Resource Allocation.
THE MANAGERIAL PROCESS Clifford F. Gray Eric W. Larson Scheduling Resources Chapter 8.
PLANNING ENGINEERING AND PROJECT MANAGEMENT By Lec. Junaid Arshad 1 Lecture#10 DEPARTMENT OF ENGINEERING MANAGEMENT.
Copyright © 2013 Pearson Education, Inc. Publishing as Prentice Hall o P.I.I.M.T o American University of Leadership Ahmed Hanane, MBA, Eng, CMA, Partner.
System Analysis & Design Chapter V: Information System Planning 1.Introduction Nowadays, Information Systems plays the main role in success or failure.
Lecture 5 – Gantt Chart GANTT Charts Constructing GANTT Charts
Project Management OPER 576 Resource Allocation Greg Magnan, Ph.D. May 6, 2004.
Scheduling Resources and Costs CHAPTER EIGHT PowerPoint Presentation by Charlie Cook Copyright © 2014 McGraw-Hill Education. All Rights Reserved.
Dr. Jana Jagodick Polytechnic of Namibia, 2012 Project Management Chapter 7 Project Manager’s Toolkit for Time Management.
1 ISE Ch. 8 pt. 2 Resource-constrained scheduling: Computer demonstration EMR Project  The development of a handheld electronic medical reference.
Lecture 7. Review of Lecture 6 Project Scheduling: The process of defining project activities, determining their sequence, estimating their duration Scheduling.
Managing Project Resources. Project Resources Human Resources Project stakeholders: – Customers – Project team members – Support staff Systems analyst.
Scheduling Resources and Costs CHAPTER EIGHT Student Version Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
The Resource Problem Resources and Priorities
Scheduling Resources and Cost
© 2012 Cengage Learning. All Rights Reserved. This edition is intended for use outside of the U.S. only, with content that may be different from the U.S.
Pegasus Project Management: Resource Factors November 8, 2001 MBA 253 The Pegasus Group: Mario RossoMario Rosso Phil RandolphPhil Randolph.
Copyright 2012 John Wiley & Sons, Inc. Chapter 9 Resource Allocation.
Prepared by Scott M. Shafer, Updated by William E. Matthews and Thomas G. Roberts, William Patterson University Copyright 2007 John Wiley & Sons, Inc.5-1.
Develop Schedule is the Process of analyzing activity sequences, durations, resource requirements, and schedule constraints to create the project schedule.
12-1 Resource Management Chapter 12 © 2007 Pearson Education.
6 Resource Utilization 4/28/2017 Teaching Strategies
University Of Palestine Faculty Of Applied Engineering & Urban Planning Civil Engineering Department PROJECT MANAGEMENT Scheduling Resources and Costs.
Scheduling Resources and Costs
Chapter 16 – Project Management
CE 366 PROJECT MANAGEMENT AND ECONOMICS Robert G. Batson, Ph.D., P.E. Professor of Construction Engineering The University of Alabama
Introduction to Project Management Chapter 7 Managing Project Resources Information Systems Project Management: A Process and Team Approach, 1e Fuller/Valacich/George.
Scheduling Resources and Costs
Chapter 8 Resource Considerations
Project Management -- Scheduling Resources and Costs
Scheduling Resources and Costs
UNIT II Scheduling Procedures & Techniques CRITICAL PATH ANALYSIS
Chapter 8 Scheduling Resources.
ENGINEERING MANAGEMENT (GE 404)
Resource management Chapter 12 Copyright ©2016 Pearson Education, Inc.
Resource Management Chapter 12
Chap 11 Learning Objectives
Chapter 9 Resource Allocation © 2012 John Wiley & Sons Inc.
ENGINEERING MANAGEMENT (GE 404)
Scheduling Resources and Costs
University of Debrecen Mongolian University of Life Sciences
Resource Management Chapter 12
Where We Are Now. Where We Are Now The Resource Problem Resources and Priorities Project network times are a schedule until resources have been assigned.
Where We Are Now. Where We Are Now Rationale for Reducing Project Duration Time Is Money: Cost-Time Tradeoffs Reducing the time of a critical activity.
Scheduling Resources and Costs
Presentation transcript:

Manajemen Industri Teknologi informasi LESSON 9

Resources Scheduling Manajemen Industri Teknologi Informasi - Ganjil 2012 01/02/2019

The Resource Problem Resources and Priorities Project network times are not a schedule until resources have been assigned. The implicit assumption is that resources will be available in the required amounts when needed. Adding new projects requires making realistic judgments of resource availability and project durations. Resource-Constrained Scheduling Resource leveling (or smoothing) involves attempting to even out demands on resources by using slack (delaying noncritical activities) to manage resource utilization. Manajemen Industri Teknologi Informasi - Ganjil 2012 01/02/2019

Types of Project Constraints Technical or Logic Constraints Constraints related to the networked sequence in which project activities must occur. Physical Constraints Activities that cannot occur in parallel or are affected by contractual or environmental conditions. Resource Constraints The absence, shortage, or unique interrelationship and interaction characteristics of resources that require a particular sequencing of project activities. Manajemen Industri Teknologi Informasi - Ganjil 2012 01/02/2019

Constraint Examples Manajemen Industri Teknologi Informasi - Ganjil 2012 01/02/2019

Kinds of Resource Constraints People Materials Equipment Working Capital Manajemen Industri Teknologi Informasi - Ganjil 2012 01/02/2019

Classification of A Scheduling Problem Classification of Problem Using a priority matrix will help determine if the project is time or resource constrained. Time Constrained Project A project that must be completed by an imposed date. Time is fixed, resources are flexible: additional resources are required to ensure project meets schedule. Resource Constrained Project A project in which the level of resources available cannot be exceeded. Resources are fixed, time is flexible: inadequate resources will delay the project. Manajemen Industri Teknologi Informasi - Ganjil 2012 01/02/2019

Resource Allocation Methods Limiting Assumptions Splitting activities is not allowed—once an activity is start, it is carried to completion. Level of resource used for an activity cannot be changed. Activities with the most slack pose the least risk. Reduction of flexibility does not increase risk. The nature of an activity (easy, complex) doesn’t increase risk. Manajemen Industri Teknologi Informasi - Ganjil 2012 01/02/2019

Resource Allocation Methods Time-Constrained Projects Projects that must be completed by an imposed date. Require the use of leveling techniques that focus on balancing or smoothing resource demands by using positive slack (delaying noncritical activities) to manage resource utilization over the duration of the project. Peak resource demands are reduced. Resources over the life of the project are reduced. Fluctuation in resource demand is minimized. Manajemen Industri Teknologi Informasi - Ganjil 2012 01/02/2019

Botanical Garden Manajemen Industri Teknologi Informasi - Ganjil 2012 01/02/2019

Botanical Garden Manajemen Industri Teknologi Informasi - Ganjil 2012 01/02/2019

Resource Allocation Methods Resource Demand Leveling Techniques for Time- Constrained Projects Advantages Peak resource demands are reduced. Resources over the life of the project are reduced. Fluctuation in resource demand is minimized. Disadvantages Loss of flexibility that occurs from reducing slack. Increases in the criticality of all activities. Manajemen Industri Teknologi Informasi - Ganjil 2012 01/02/2019

Resource Allocation Methods Resource-Constrained Projects Projects that involve resources that are limited in quantity or by their availability. Scheduling of activities requires the use of heuristics (rules- of-thumb) that focus on: Minimum slack Smallest (least) duration Lowest activity identification number The parallel method is used to apply heuristics An iterative process that starts at the first time period of the project and schedules period-by-period any activities scheduled to start using the three priority rules. Manajemen Industri Teknologi Informasi - Ganjil 2012 01/02/2019

Resource-Constrained Schedule through Period 2–3 Manajemen Industri Teknologi Informasi - Ganjil 2012 01/02/2019

Resource-Constrained Schedule through Period 2–3 ES resource load chart Manajemen Industri Teknologi Informasi - Ganjil 2012 01/02/2019

Resource-Constrained Schedule through Period 2–3 Manajemen Industri Teknologi Informasi - Ganjil 2012 01/02/2019

Resource-Constrained Schedule through Period 5–6 Manajemen Industri Teknologi Informasi - Ganjil 2012 01/02/2019

Resource-Constrained Schedule through Period 5–6 Final resource-constrained schedule Manajemen Industri Teknologi Informasi - Ganjil 2012 01/02/2019

Resource-Constrained Schedule through Period 5–6 New, resource-constrained network Manajemen Industri Teknologi Informasi - Ganjil 2012 01/02/2019

The Impacts of Resource-Constrained Scheduling Reduces delay but reduces flexibility. Increases criticality of events. Increases scheduling complexity. May make traditional critical path no longer meaningful. Can break sequence of events. May cause parallel activities to become sequential and critical activities with slack to become noncritical. Manajemen Industri Teknologi Informasi - Ganjil 2012 01/02/2019

Splitting/Multitasking A scheduling technique use to get a better project schedule and/or increase resource utilization. Involves interrupting work on an activity to employ the resource on another activity, then returning the resource to finish the interrupted work. Is feasible when startup and shutdown costs are low. Is considered the major reason why projects fail to meet schedule. Manajemen Industri Teknologi Informasi - Ganjil 2012 01/02/2019

Splitting/Multitasking Manajemen Industri Teknologi Informasi - Ganjil 2012 01/02/2019

Assigning Project Work Factors to Consider in Assigning Work: Don’t always pick the same people for the toughest assignments. Choose people with an eye to fostering their development through participation on the project. Pick people with compatible work habits and personalities but who complement each other. Team-up veterans with new hires to share experience and socialize newcomers into the organization. Select people who may need to learn work together on later stages of the project or other projects. Manajemen Industri Teknologi Informasi - Ganjil 2012 01/02/2019

Multiproject Resource Schedules Multiproject Scheduling Problems Overall project slippage Delay on one project create delays for other projects Inefficient resource application The peaks and valleys of resource demands create scheduling problems and delays for projects. Resource bottlenecks Shortages of critical resources required for multiple projects cause delays and schedule extensions. Manajemen Industri Teknologi Informasi - Ganjil 2012 01/02/2019

Multiproject Resource Schedules Managing Multiproject Scheduling Create project offices or departments to oversee the scheduling of resources across projects. Use a project priority queuing system: first come, first served for resources. Centralize project management: treat all projects as a part of a “megaproject.” Outsource projects to reduce the number of projects handled internally. Manajemen Industri Teknologi Informasi - Ganjil 2012 01/02/2019