Paradigmen Shift in AIS/AIM Annex 15 –AIS, 16th Edition (Amd 40) PANS-AIM, 1st Edition (Doc 10066) ICAO SAM PANS-AIM Seminar – Annex 15 to Convention of.

Slides:



Advertisements
Similar presentations
Chapter 6 Sub-Group ICAO Headquarters, November 2013
Advertisements

28 May 2013 AIM Global context ADQ Workshop
AIS AIM SG 9 Presented by: by: Charity Muthoni Japan: 21 st -25 th April 2014 Draft PANS-AIM Chapter 4 Development Status.
AIS AIM SG Ad-hoc Chapters 5-6 Group TOKYO MEETING REPORT.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-30/PIA-2 Service Improvement through Digital Aeronautical Information.
ICAO Provisions for Safety Management
APAC PBN Seminar F.LECAT (ICAO)
Objective ITY-ADQ ESSIP Plan 2014 Ana Paula FRANGOLHO DSS/EIPR
Introduction to AIXM. Topics Criticality of AIS information AIM – a “data centric” approach Worldwide interoperability AIXM mission Related developments.
International Civil Aviation Organization AIM - implementation Saulo Da Silva Workshop on preparations for ANConf/12 − ASBU methodology (Bangkok, 14-18/Nadi,
AIXM 5.1 Seminar 12 – 13 December 2011
ICAO Aerodrome Safety Workshop Almaty, Kazakhstan – 18 to 22 November 2002  AERODROME MANUAL.
International Civil Aviation Organization and ISO/TC 211 ISO/TC 211 Seminar Berlin, 29 October 2003 ISO/TC 211 Seminar Berlin, 29 October 2003.
ICAO APIRG/17, Ouagadougou, Burkina Faso, 2-8 August 2010
What’s New with AIXM 5. Explaining AIXM 5 Mission and Objectives Coverage of the AIXM 5 data model –Scope of aeronautical information –Emerging “partner”
Aeronautical Information Exchange Model (AIXM). Introduction “Never let an aircraft take you somewhere your brain didn't get to five minutes earlier”
AIXM 5 Concepts This presentation is based on the first part of the “AICM and AIXM 5 - Exchange Model goals, requirements and design” document. The purpose.
ICAO Requirements on Certification of Aerodromes Module - 2
International Civil Aviation Organization Global Air Navigation Plan (GANP) – Framework for global planning H. Sudarshan SIP/2012/ASBU/Nairobi -WP/7 Workshop.
The European Organisation for the Safety of Air Navigation ADQ, INSPIRE and Metadata AIXM 5.1 Seminar.
Roadmap Phase 2 EAD & AICM By: Eduard Porosnicu, AIM Expert 7-8 October 2009 ACAC – AIM Workshop.
AIXM - purpose, scope, implementation and future evolution.
LECTURE 4: ICAO CHART requirements
The global voice of ATM The Global Voice of ATM CANSO AIM WG Activities Agenda Item - 5: Global strategy/roadmap ICAO AIS-AIM SG3, Montreal, November.
AIXM 5 Concepts This presentation is based on the first part of the “AICM and AIXM 5 - Exchange Model goals, requirements and design” document. The purpose.
AIS-AIMSG/12 Briefing to ANC AIS-AIMSG/12 Briefing to ANC 23 October 2015.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-30/PIA-2 Service Improvement through Digital Aeronautical Information.
ICAO-AFPP Quality Assurance for Instrument Flight Procedure Implementation. (Nairobi, Kenya, 3-6 Nov, 2015) By Chinyama, P. 1.
APAC PBN Seminar F.LECAT (ICAO)
AIS-AIMSG/12 Briefing to ANC 23 October 2015
CANSO AIM WG Activities
AIS-AIMG/1-SN No.6.
Collaborative Decision Making (CDM) Saulo Da Silva
ATS Route and Waypoint Implementation:
ICAO APIRG/17, Ouagadougou, Burkina Faso, 2-8 August 2010
Workshop on preparations for ANConf/12 − ASBU methodology
AIXM 5.1 – Interoperability issues
Workshop on preparations for ANConf/12 − ASBU methodology
Workshop on preparations for ANConf/12 − ASBU methodology
(Nairobi, Kenya, 3-6 Nov, 2015) By Chinyama, P.
Draft PANS-AIM Chapter 4
Workshop on preparations for ANConf/12 − ASBU methodology
NON-CONFORMITIES AND EXEMPTIONS AERONAUTICAL STUDIES
Objective ITY-ADQ ESSIP Plan 2015 Ana Paula FRANGOLHO DPS/PEPR
AERODROME MANUAL.
AIS AIM SG Ad-hoc Chapters 5-6 Group
SIP/2012/ASBU/Nairobi-WP/7
Draft PANS-AIM Chapter 4 ICAO Headquarters: 4th-8th November
4 - 8 November 2013 AIM relevant - Assembly conclusions
AIS-AIMSG #9 - Roadmap.
Chapter 6 Sub-Group ICAO Headquarters, November 2013
Workshop on preparations for ANConf/12 − ASBU methodology
AIXM 5.1 – Interoperability issues
AIXM 5.1 – Interoperability issues
ICAO AISAIMSG #8 - Intro 4-8 November 2013
Global Air Navigation Plan (GANP) Aviation System Block Upgrade (ASBU)
AIXM 5 Overview xNOTAM Workshop #2 Brussels, November 2007
AIXM 5 Development Status
Presented by Eduard Porosnicu, EUROCONTROL
USOAP Continuous Monitoring Approach (CMA) Workshop
Amendment 40 to ANNEX 15 Air Navigation Procedures for AIM Seminar
AIM Global Strategy Air Navigation Procedures for AIM Seminar
AIS Manual (Doc 8126) Air Navigation Procedures for AIM Seminar
Seminar on PANS-AIM – Annex 15 to the Convention of Civil Aviation
PANS-AIM (Doc 10066) Air Navigation Procedures for AIM Seminar
AIXM 5.1 – Interoperability issues
23 May 2012 AIS-AIM SG #6.
AIXM 5.1 – Interoperability issues
1 Ranjan Senaratne. After studying this session, you will be able to: Explain the responsibilities of the AIS. Identify the users of Aeronautical Information.
Presentation transcript:

Paradigmen Shift in AIS/AIM Annex 15 –AIS, 16th Edition (Amd 40) PANS-AIM, 1st Edition (Doc 10066) ICAO SAM PANS-AIM Seminar – Annex 15 to Convention of International Civil Aviation Lima, Peru, 14 – 16 November 2018

Trends to A40 Aviation System Block Upgrads (ASBU) GANP, ASBU, AIM, IM 2013 2018 Block 0 2019 2024 Block 1 2025 2029 Block 2 2031 onwards Block 3 Aviation System Block Upgrads (ASBU) GANP, ASBU, AIM, IM // GANIS & SANIS Industry Meeting 10. – 15.12.2017, Montreal, Canada // AN-Conf/13 9. – 17.10.2018 // ICAO A40 in Q/3 2019 // Ed. 6 Revises the Blocks // Digital AIM (DAIM) is part of it GANP GASP ASBU GANP – Global Air Navigation Plan GASP - Global Aviation Safety Plan ASBU Document

Content / Discussion // 01 Rational for a PANS-AIM // 02 AIS-AIMSG Focus // 03 Origination & Process // 04 Data Catalogue & DQR // 05 Data Sets // 06 What is the difference? // 07 National Planning © 2016 A4F GmbH – GAF MRCA PA-200 Tornado, Eurofighter & A310 MRTT at ILA Berlin

A15 & PANS-AIM - Impact on implementation – what is the difference? ICAO Asia/Pacific AIS – AIM Transition Workshop Nadi, Fiji, 22 – 24 October 2018

// 01 Rational for a PANS-AIM

Rational Annex = performance based SARPs PANS = technical & procedural provisions Elevate certain procedures from guidance to PANS Support data centricity with processes & procedures Support interoperability PANS deviation to be published in AIP only Supports stepwise transition/migration Best practice example is PANS-ATM (Doc 4444) which exists since 1946 (Annex 2 & 11 contain no formats)

Timeline (How did we get there) Initial ideas on AIS-AIMSG/3, Montreal, Nov 2010 ANC on site May 2011 Ad hoc group PANS-AIM on AIS-AIMSG/4, Bordeaux, May 2011 Data and information scope in AIS-AIMSG/7, Montreal, Jan 2014 Since then involvement of IFPP/IWG Origination & Terminology on AIS-AIMSG/9, Tokyo, April 2014 DQR on AIS-AIMSG/10, Montreal, Nov 2014 Final on AIS-AIMSG/12 in Oct 2015

AIS  AIM State provisions (or „what“) Guidance / Explanations 150 pages Operational Provisions / „AIM Practitioners“ instructions (or „how to“) 41 pages 118 pages Guidance / Explanations 480 pages (190 AIP) ??? pages (190 AIP)

// 02 AIS-AIMSG Focus

Focus Split of data origination from data publication requirements Introduction of the aeronautical data catalogue Introduce digital data sets Aeronautical information product (standard or electronic) Data quality requirements at one place (PANS-AIM) Separating obstacles & terrain Bring in AMDB harmonised NOTAM improvement proposal CRC performance-based requirements

Focus: Data Centric Approach F(x:y) (y) (x) Products Rules Properties Parameters Models Features … Annex 4 (Amd 59) Thematic Data Sets (e.g. IFP) Focus: Data Centric Approach Paper Chart Products Source Def (y) Annex 2, 3, 4, 5, 7, 9, 10v1, 10v2, 10v3, 10v5, 11, 12, 13, 14v1, 14v2, 15, 16v1, 16v2, 17, 18, 19 PANS-OPS Electronic Chart Next Intended User (SWIM?) Products, Applications, Services Data Sub-sets Tables F(x:y) Data Sub-sets Books Text (electronic form) Applicable 8. Nov 2018 (x) Data Text Data Management Origination Data Metadata Annex 15 (Amd 40) PANS-AIM (new) Data catalogue Data ? Super Set V4.0

Main News in Annex 15 Ed. 16 PANS-AIM Ed 1 introduced Strengthening of Data Originators Data Exchange Points Formal Arrangments (SLAs) Data Catalogue with DQR DQR in one document not distributed over several Annexes & PANS Data Sets Applicability 08.11.2018 (AIRAC)

// 03 Origination & Process

Aeronautical Information Management Process

Processes Focus: Processes & Data Chains Data Exchange Point Formal Arrangement

Formal Arrangements Between Minimum Content Originators & State AIS Also parties acting on behalf of states (recomendation) Minimum Content Regulatory framework Data origination Quality assurance Metadata and quality reporting Data delivery Error handling

// 04 Data Catalogue & DQR

ICAO Data Catalogue Around 65 subjects, 350 properties, ca. 500 subproperties Basis for Data Sets!

ICAO Data Catalogue 10 Tabels Aerodrome data (A1-1) Airspace data (A1-2) ATS & other routes data (A1-3) Instrument Flight Procedure data (A1-4) Radio Navigation aids/systems data (A1-5) Obstacle data (A1-6) Geographic data (A1-7) Terrain data (A1-8) Data types (A1-9) Information about national and local regulation, services and procedures (A1-10)

Focus: Data Catalogue (Example AD/HP)

Obstacles & Terrain Separated now in Annex 15, Ed. 16 Common presentation like in Annex 15, Ed. 15 no longer used Obstacle requirements are moved into the data catalogue including DQR Terrain unchanged for Area 1, 2, 3, and 4 Former Annex 15, Appendix 8, Table A8-1 Now in PANS-AIM Appendix 1, Table 8

Obstacles & Terrain Annex 15 Ed. 15 (Amd 39) Annex 15 Ed. 16 (Amd 40) Chapter 10 SARPs Appendix 7 Publication Resolution Integrity Classification Appendix 8 Terrain & obstacle data collection surfaces Numerical requiremnts Annex 15 Ed. 16 (Amd 40) Chapter 4 – Scope Chapter 5 – Products & Services PANS-AIM Ed. 1 Appendix 6 Terrain & Obstacle attributs provision requirements Appendix 8 Terrain & Obstacle dat requiremenst

Data Quality Requirements (DQR) PANS-AIM DQR Appendix 1 Data quality. A degree or level of confidence that the data provided meet the requirements of the data user in terms of accuracy, resolution, integrity (or equivalent assurance level), traceability, timeliness, completeness and format. Annex 4, 11, 14, 15, & PANS-OPS

ICAO Datencatalogue (DQR)

DQR Components Data accuracy Data timeliness Data integrity A degree of conformance between the estimated or measured value and the true value. Data integrity (assurance level). A degree of assurance that an aeronautical data and its value has not been lost or altered since the origination or authorized amendment. Data resolution A number of units or digits to which a measured or calculated value is expressed and used. Data timeliness The degree of confidence that the data is applicable to the period of its intended use. Data tracebility The degree that a system or a data product can provide a record of the changes made to that product and thereby enable an audit trail to be followed from the end-user to the originator. Data Completness The degree of confidence that all of the data needed to support the intended use is provided. Origination Type calculated declared surveyed Meta Data Collected for process & exchange points Provided with each data set ISO 19115 Format Descretion of State Note: Commonly used data encoding formats Note: XML, GML, JSON

// 05 Data Sets

Data Sets in PANS-AIM Exchange between data providers and data users (ISO 19100) Based on a product specification (ISO 19131) Common encoding models (UML, XML, GML, JSON) Complemented by charts, maps & diagrams Metadata (ISO 19115) AIP data set Terrain data set Obstacle data set Aerodrome mapping data set (shall be supported by terrain & obstacle data for area 3) IFP data set Distribution Different ways SWIM

„Incentives (1)“ in Annex 15 Ed. 16 ! Chapter 3.2 says, inter-alia: 3.2.1 Data Accuracy The order of accuracy for aeronautical data shall be in accordance with ist intended use. This means, when the intended use of aeronautical data IS KNOWN, the accuracy can be higher or lower, depending on intended use. This brings flexibility in the system.

„Incentives (2)“ in PANS-AIM 1 Ed Chapter 5.2.1.1.3 says, inter-alia: When the AIP Data Set (as specified in 5.3.3.1) is provided, the following sections of the AIP may be left blank and a reference to the data set availability shall be provided: ! ENR 2.1 FIR, UIR, TMA ENR 3.1 Lower ATS Routes ENR 3.2 Upper ATS Routes ENR 3.3 Area Navigation (RNAV) Routes ENR 3.4 Helicopter Routes ENR 3.5 Other Routes ENR 3.6 En-route Holding ENR 4.1 Radio navigation aids — en-route ENR 4.4 Name-code designators for significant points ENR 4.5 Aeronautical Ground Lights — En- route ENR 5.1 Prohibited, Restricted and Danger Areas ENR 5.2 Military exercise and training areas and air defence identification zone (ADIZ) ENR 5.3.1 Other activities of a dangerous nature ENR 5.5 Aerial sporting and recreational activities **** AD 2.19 Radio navigation and landing aids **** AD 3.18 Radio navigation and landing aids “****” = relevant ICAO location indicator

„Incentives (3)“ in PANS-AIM 1 Ed Chapter 5.2.1.1.4 says, inter-alia: When the Obstacle Data Set (as specified in 5.3.3.2.2) is provided, the following sections of the AIP may be left blank and a reference to the data set availability shall be provided: ! ENR 5.4 Air navigation obstacles **** AD 2.10 Aerodrome obstacles **** AD 3.10 Heliport obstacles “****” = relevant ICAO location indicator

// 06 What is the difference. What moved where. What is new // 06 What is the difference? What moved where? What is new? What is the effort to understand that?

Changes in PANS-AIM State provisions (or „what“) About 120 text relocations 150 pages 41 pages About 20 text relocations 118 pages Guidance / Explanations 480 pages (190 AIP) ??? pages (190 AIP)

Assessment of Changes (1) About 100 text relocations from Annex 15 20 text relocations from AIS Manual 70 deleted text phrases 240 new text phrases Effort will be different Relocated text is known, no new provisions Some chapters have little change A lot of changes is because of changed references Need: to understand what is really NEW!

Assessment of Changes (2)

State Letter could be used Identification & understanding what is really NEW is most important AN 2/33–18/85, 31.08.2018

// 07 National Planning & Implementation

Initial steps to move Get your managment on board Think about your natural internal alleys Talk to them Get your regulator on board Initiate a work shop Plan the work, work the plan PANS-AIM & the paradigm shift AIS  AIM supports GANP Ed. 6 (2019) DAIM AP, airlines, data houses, MIL, … Plan Do Check Act

Next Steps (1 to 5 years) Understand information managment requirements in PANS-AIM (para 2.1) Collection Processing Quality Control Distribution Assess impact on Make an implementation plan with firm dates for Personal (training) Processes (modelling, if not yet available) Sofware (procurment) Hardware (procurment) Publish the plan in AIP GEN 1.7 when knowledge of differences is important for the saftey of air navigation Personal Software Processes Hardware Assess all

Continue – Keep going! Further work shops with: Verify your work your natural allies, your regulator Keep informed your managament Justify investment where needed Verify your work Plan Do Check Act

Happy & smooth touch down! ADDRESS        ASBU for Future GmbH Römerstrasse 17 88690 Uhldingen-Mühlhofen, Germany  INFO        Phone: +49-7556-4521-78-0 E-mail: info@a4f.aero Website: http://asbu4future.aero