API 17P SUBSEA STRUCTURES & MANIFOLDS

Slides:



Advertisements
Similar presentations
SC 17A Task Force Summer Meeting Presentation June 2013.
Advertisements

SUBSEA PRODUCTION SYSTEMS (SC17) Liaison Report
API RP 17 N Update Subsea System Reliability and Integrity Management Presented by: Mark Siegmund - API 17N Chairman Jan 18, 2011.
Kent Grebing, API SC 16 Chair
Operational Excellence Quality and Customer Experience Operational Excellence Quality and Customer Experience SC6 Liaison report for SC18 Rick Faircloth.
Doc.: IEEE /527r1 Submission November 2001 John Barr, MotorolaSlide 1 Project: IEEE Working Group for Wireless Personal Area Networks (WPANs)
API 17P TASK GROUP January 15, BACKGROUND NWI Initiated in 2006 NWI Initiated in 2006 API 17 P / ISO new recommended practice API 17 P.
SC18:TG8 API Specification Q1 Guidance Document.
API 17N Subsea Production System Reliability, Integrity, and Technical Risk Management Don Wells Hess Corporation.
Task Group API 19SS Sand Screens
Task Group G Report January 17, 2003
New gTLD Auction Proceeds CCWG Status Update
Campus Master Plan.
Updates from SC18 Summer Meeting
Task Group API 19SS Sand Screens
API Subcommittee 17 - Specification 17D January 2016 Status
FBC Code Development 6th Edition (2017).
API RP 17A - Discussion Points
doc.: IEEE <doc#>
API 17Q – Subsea Equipment Qualification
API 17V – Subsea Safety API 17V January 2014 By Christopher Curran
Status Update on API 16Q / 16R / 16F
January 2018 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG4s Closing Report for January 2018] Date.
doc.: IEEE <doc#>
doc.: IEEE <doc#>
doc.: IEEE <doc#>
doc.: IEEE <doc#>
doc.: IEEE <doc#>
API SC-16 task group for Specification 16D
doc.: IEEE <doc#>
doc.: IEEE <doc#>
doc.: IEEE <doc#>
API 17P TASK GROUP January, 2015.
API 17H TASK GROUP January 15, 2013.
doc.: IEEE <doc#>
Task Group G Report March 10, 2003
doc.: IEEE <doc#>
WG Technical Editor’s Report
API Summer Standardization Conference
API 17H TASK GROUP January , 2014.
API 17P SUBSEA STRUCTURES & MANIFOLDS
doc.: IEEE <doc#>
API 17H ROV/ROT Interfaces
API 16D June 2017 Specification for Control Systems for Drilling Well Control Equipment and Controls Systems for Diverter Equipment Chair – Brian Wright.
January, 2004 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [January 1394-Wireless Working Group Liaison.
doc.: IEEE <doc#>
January 2019 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG w January Closing Report] Date.
doc.: IEEE <doc#>
doc.: IEEE <doc#>
doc.: IEEE <doc#>
doc.: IEEE <doc#>
API 17H ROV/ROT Interfaces
January, 2004 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [January 1394-Wireless Working Group Liaison.
API 17H ROV/ROT Interfaces
Discussion Points API RP 17A Task Group Members
doc.: IEEE <doc#>
January 2019 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG w January 2019 Closing Report]
Nov 2012 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: Opening report for TG4j (MBAN) Task Group, Nov.
API 17H TASK GROUP January, 2015.
IEEE Revision Timeline
Tge draft ballot information
Task Group G Report January 17, 2003
API RP 17Q Status January, 2014 First Edition issued June 18, 2010
Task Group Status January 2013
doc.: IEEE <doc#>
Status report for revision of API 17F
API 17H TASK GROUP June 26, 2013.
API 17P TASK GROUP 13 June, 2012.
API 16C Choke and Kill Equipment
API 17P TASK GROUP June 26, 2013.
Presentation transcript:

API 17P SUBSEA STRUCTURES & MANIFOLDS January, 2016

BACKGROUND ISO 13628-15 1st edition published Dec 2011 Released via ISO pathway Adopted back as API 17 P API 17 P 1st edition published Jan 2013 SSSR submitted and accepted for 2nd edition New TOC ‘recommened’ by API legal Draft TOC ‘accepted’ by API legal

API 17P TASK GROUP Name Company E-mail Charles White BG Group charles.white@bg-group.com Brian Rose BP brian.rose2@bp.com John Smiley Shell john.smiley@shell.com John Felarca BHP Billiton John.P.Felarca@bhpbilliton.com Andy Lee FMC Andy.Lee@fmcti.com Dave Holberry OneSubsea Dave.Holberry@OneSubsea.com Karl Schnakenburg Karl.Schnakenburg@BHPBilliton.com Anne-Beth Sandøy GE Subsea anne-beth.sandoy@ge.com Ron Pfluger ron.pfluger@OneSubsea.com Phil Maser Jaguar Instruments pgmaser@jag-i.com

2nd EDITION SCOPE Areas of focus are: Utilize new TOC to develop second edition Update and rationalize the materials section Review outstanding comments left from the previous edition Add references to recently released recommended practice

CURRENT STATUS SRRR submitted and accepted TOC issued to API Legal for review ‘accepted’ TOC to proceed with working draft Working draft of document created based on accpeted TOC Kickoff meeting held with task group Update of the document ongoing

API 17P schedule Milestone Targets Proposed Completion Date API 17P Second Edition Kickoff 12 June 2015 – completed Complete draft for comment ballot 31 December 2016 Issue API 17P second edition for comment ballot 1 March 2017 Issue API 17P second edition for ballot 30 June 2017 Issue API 17P second edition 31 December 2017