Quick update on the project

Slides:



Advertisements
Similar presentations
Publication Module using back end interface. Institution Data Entry Add Documents. Edit/Delete Documents that are added but not yet sent to Institution.
Advertisements

MDS4 Roadmap Items Laura Pearlman USC Information Sciences Institute.
Systems Analysis and Design Presented by Thakur Rai.
WHAT IS STEAM PRO? Thermoflow, Inc.
NDG-L39Introduction to ASIC Design1 Design of a Simple Customizable Microprocessor * Chapter 7 and 15, “Digital System Design and Prototyping”  Pipelined.
Typical phases of a project: 1.Schematic Design 2.Design Development 3.Construction Documents 4.Construction Administration.
Lesson-21Process Modeling Define systems modeling and differentiate between logical and physical system models. Define process modeling and explain its.
Welcome to CMPE003 Personal Computer Concepts: Hardware and Software Winter 2003 UC Santa Cruz Instructor: Guy Cox.
Foundation Degree IT Project Milestone 2: Design and Project Planning.
THE SYSTEMS LIFE CYCLE ANALYSE DESIGN IMPLEMENT MAINTENANCE IDENTIFY/INVESTIGATE.
Copyright © 2008 Pearson Education, Inc. Publishing as Pearson Addison-Wesley Computer Science: An Overview Tenth Edition by J. Glenn Brookshear Chapter.
Systems Analysis and Design: The Big Picture
In The Name Of God. Jhaleh Narimisaei By Guide: Dr. Shadgar Implementation of Web Ontology and Semantic Application for Electronic Journal Citation System.
GTRInewFormat.ppt-1 Electronic Systems Laboratory TMC Operator Requirements and Position Descriptions, Phase 2, Kickoff Meeting Presented by Dennis J.
DESC mtg U Penn June, 2012 Computing Infrastructure Computing Parallel Session R.Dubois
OCR ICT for A2 © Hodder Education 2009 Chapter 1 The systems cycle.
Process Management Working Group Process Management “Meatball” Dallas November 28, 2001.
Chapter 7 Business Process Redesign Reference: Tan, A. (2007). Business Process Reengineering in Asia: A Practical Approach, Pearson Education, Singapore.
Confidential and Proprietary © 2002 All rights reserved. October 19, 2015 Texas Market Notification Update.
Online Friends’ Community Presented by: Stuart Monaghan HND in Computing th May 2002.
INFNGrid Constanza Project: Status Report A.Domenici, F.Donno, L.Iannone, G.Pucciani, H.Stockinger CNAF, 6 December 2004 WP3-WP5 FIRB meeting.
Today Q2Q3Q4 Q Q2Q3Q4 Q Phase 1 Kickoff 4/10/2014 Project Start 5/1/2014 Project Approved 7/31/2014 Implementation Finished 6/16/2015.
George Tsouloupas University of Cyprus Task 2.3 GridBench ● 1 st Year Targets ● Background ● Prototype ● Problems and Issues ● What's Next.
Chapter 4 Detailed Process Design Reference: Tan, A. (2007). Business Process Reengineering in Asia: A Practical Approach, Pearson Education, Singapore.
Provides an overview of the main components in the simulator. Shows the relation between functions, data and user-inputs. The design is broken up into.
Portal Update Plan Ashok Adiga (512)
Structural Design Software TYLER HUTCHISON. Requirements  Develop an interface to generate a text file.  The text file is then passed to one of five.
An API for the Process Manager Component Meeting at Argonne June 5-6, 2003.
Software Requirements for the Testing of Prototype Correlator Sonja Vrcic Socorro, December 11, 2007.
Master Correlator Control Computer (MCCC) Requirements & Status Sonja Vrcic Socorro, December 12, 2007.
NAREGI PSE with ACS S.Kawata 1, H.Usami 2, M.Yamada 3, Y.Miyahara 3, Y.Hayase 4 1 Utsunomiya University 2 National Institute of Informatics 3 FUJITSU Limited.
Excel Action List So far the action list was a simple word file, updated whenever needed The list got long (54 active actions) Difficult to organize Difficult.
VisIt Project Overview
Status of Task Forces Ian Bird GDB 8 May 2003.
Software Project Configuration Management
Software Overview Sonja Vrcic
Array multiplier TU/e Processor Design 5Z032.
Practice Key Driver Diagram
New functionalities of ECC Work Programme Database ECO
(on behalf of the POOL team)
Tracker Upgrade Simulations Software Harry Cheung (Fermilab)
Database Management Systems
Minimal Prototype Integrated Prototype Integration Validation
STATUS OF THE DAQ+MOVEMENT CARIPARO PROGRAM
Design AH Computing.
ILDG Implementation Status
OSKAR station simulator
PMI Shelter Manual Review
Part 10 Q46 to Q50 of National 5 Prelim
Project tracking system for the structure solution software pipeline
Overview and Introduction to the SCC website
تحليل وتصميم نظم المعلومات
Minimal Prototype Integration Integrated Prototype Validation
Document Visualization at UMBC
Observatory Control System
Hilbert-Huang Transform Data Processing System (HHT-DPS) V1.2
Aperture Array Simulations
5 POINT PLAN THE SYSTEMS LIFE CYCLE ANALYSE DESIGN
Grid Application Programming Environment
Members: Keshava Shiva Sanjeeve Kareena
Workshop commissioning Installation Coordination at ESS
UK Link Manual Update (UNC Modification 0613)
Month 43: June 2016 – Month 50: January 2017 Remaining Deliverables
Progress in CMA on GSICS Collaboration Servers Synchronisation
Reportnet 3.0 Database Feasibility Study – Approach
Michigan DOT’s - URTS Internal web based application
Lecture 23 CS 507.
Preliminary Detailed Design Review: P18001
Now Buy Best External Door Hardware from Doorhardware
Presentation transcript:

Quick update on the project Status of WP1 – overall design OSKAR Wiki Work towards the first simulator prototype (end June)

WP1 Overall design - review Overall Design diagram Complete Coordinate system Modes of operation. Needs some revision Data flow and interface specification

OSKAR Wiki http://astrowiki.physics.ox.ac.uk/cgi-bin/twiki/view/Oskar Not yet registered? Visit the wiki and fill in the form.

Work towards parallel design Simulator implemented in MPI on cluster Prototype consists of a simple two stage beamformer design Focus work on developing the backend Use of MPI Configuration files in XML Design documents are on the wiki Detailed diagram Operations spreadsheet Operations ordering chart

Parallel Design Diagram

Order of Operations