RISK REDUCTION PROCESS

Slides:



Advertisements
Similar presentations
Where does Failure Mode and Effects Analysis (FMEA) come from?  Developed by the Aerospace industry in the1960s  Spread to the Automotive industry 
Advertisements

Failure Effect Mode Analysis
Failure Mode Effects Analysis Effects Analysis Risk Identification FMEA Risk Identification FMEA.
Failure Mode & Effect Analysis Tom Hannan & Kevin Kowalis Eastern Illinois University School of Technology Total Quality Systems INT 5133 (FMEA)
PURPOSE OF DFMEA (DESIGN FAILURE MODE EFFECTS ANALYSIS)
Popcorn Sample PFMEA: Process Flow
Failure Modes Effects Analysis (FMEA)
 Individually  Given your sample of M&Ms, build a Pareto diagram by color  Before you destroy the evidence, be sure you have an accurate count.
Lucas Phillips Anurag Nanajipuram FAILURE MODE AND EFFECT ANALYSIS.
ISO 9000 Certification ISO 9001 and ISO
Training.
F.M.E.A (Failure Mode and Effect Analysis)
Supplier Program Review Meeting #1
Presented to: [Date] By (Insert Name) Failure Mode and Effect Analysis (FMEA)
Analyze Opportunity Part 1
Failure Mode and Effects Analysis (FMEA)
Fast Response Governance Drill Deep and Wide Abel Acuña January 27 th 2010.
© ABSL Power Solutions 2007 © STM Quality Limited STM Quality Limited Failure Mode and Effect Analysis TOTAL QUALITY MANAGEMENT F.M.E.A.
Advance to the next slide when ready to start $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 Sample.
Process System Capability An introduction to 9103 ‘VARIATION MANAGEMENT OF KEY CHARACTERISTICS’ Bernard LAURAS AIRBUS.
1 Criteria for a Successful FMEA Design & Process.
Software Quality Assurance SOFTWARE DEFECT. Defect Repair Defect Repair is a process of repairing the defective part or replacing it, as needed. For example,
Using Total Quality Management Tools to Improve the Quality of Crash Data John Woosley Louisiana State University.
Failure Mode & Effect Analysis FMEA Lecture 11. What is FMEA? Failure mode and effect analysis is an Advanced Quality Planning tool that: examines potential.
19-Feb-16 “"Dana Confidential Information - Those having access to this work may not copy it, use it or disclose the information contained within this.
Layered Process Audits Tommy Beheler Quality Manager The Timken Company’s Gaffney Bearing Plant.
Failure Modes and Effects Analysis (FMEA)
Supplier Performance Development Process
Quality Improvement Tools for Intervention Determination Presenters: Kris Hartmann, MS Healthcare Analyst, Performance Improvement Projects Don Grostic,
WORKSHOP ON ACCREDITATION OF BODIES CERTIFYING MEDICAL DEVICES INT MARKET TOPIC 9 CH 8 ISO MEASUREMENT, ANALYSIS AND IMPROVEMENT INTERNAL AUDITS.
QSB Quality System Basics & Q7 tools in practice
Failure Modes, Effects and Criticality Analysis
FMEA Training.
Six Sigma Greenbelt Training
Integrating QS9000 Requirements
Failure Mode & Effect Analysis (FMEA)
Why LPA’s? LPA’s can provide low cost system for finding problems and making improvements in Safety, Quality, Delivery, Cost and Morale when used effectively.
Six-Sigma : DMAIC Cycle & Application
HEATING, COOLING & WATER HEATING PRODUCTS
LAYERED AUDITS.
Background Mandated by DaimlerChrysler for all tier 1 suppliers
FMEA.
Failure Modes and Effects Analysis (FMEA)
Failure mode and effect analysis
4.5 Checking and Corrective Action Monitoring and Measurement
Global Supplier Quality Early Production Containment Training
GE 6757 TOTAL QUALITY MANAGEMENT
Setting up an Internal Audit Program
Supplier Performance Development Process
  Aptiv Global Supplier Quality Early Production Containment Training.
Layered Process Audits
APQP PROCESS FLOW Prepare for APQP Plan and Define Program
The Certified Quality Process Handbook Chapter 22: Preventive Action
Background Mandated by DaimlerChrysler for all tier 1 suppliers
DMAIC STANDARD WORK TEMPLATE
Background Mandated by DaimlerChrysler for all tier 1 suppliers
Supplier Performance Development Process
An Automotive Tier 1 Warranty Process
Integrating TS Requirements
Failure Mode and Effect Analysis
DMAIC STANDARD WORK TEMPLATE
Why LPA’s? LPA’s can provide low cost system for finding problems and making improvements in Safety, Quality, Delivery, Cost and Morale when used effectively.
Global Supplier Quality Early Production Containment Training
Glossary Action Plan Advanced Product Quality Planning
APQP Jan ("Yon") Roovers President JAN ROOVERS ASSOCIATES, INC.
Why LPA’s? LPA’s can provide low cost system for finding problems and making improvements in Safety, Quality, Delivery, Cost and Morale when used effectively.
Glossary Action Plan Advanced Product Quality Planning
Glossary Action Plan Advanced Product Quality Planning
PFMEA Summary Process Steps
Failure Mode & Effect Analysis
Presentation transcript:

RISK REDUCTION PROCESS PROACTIVE RPN REDUCTION PROCESS: Reducing the risk of a POTENTIAL QUALITY FAILURE REACTIVE ERROR PROOFING PAST QUALITY FAILURES

PROCESS FAILURE MODE & EFFECTS ANALYSIS (PFMEA) DEFINITION An analytical technique for each process step that identifies: ways a process may fail to meet requirements. consequences to the internal / external customer (severity). frequency the failure will/could happen (occurrence). effectiveness of current controls (prevention & detection). ranking of causes and effects (risk priority number). A structured procedure for identifying and eliminating process related failure modes. BE BRIEF

PROCESS FAILURE MODE & EFFECTS ANALYSIS (Example) What can go wrong? How does it affect customer? How likely are we to notice if this happens? Use the balloons and stay brief How often does this cause happen? How high is the risk? (AIAG PFMEA Third Edition)

SEVERITY RANKINGS Briefly read the ranking for the example you are using. (AIAG PFMEA Third Edition)

OCCURRENCE RANKING Briefly read the ranking for the example you are using. (AIAG PFMEA Third Edition)

DETECTION RANKINGS Briefly read the ranking for the example you are using. Explain the blue shaded columns. Ask the audience if there are any questions on how to calculate RPN. (Stay on subject.) (AIAG PFMEA Third Edition)

RISK PRIORITY NUMBER (RPN) Severity x Occurrence x Detection = RPN Risk Priority Number (RPN) is the result of Severity, Occurrence and Detection rankings. Severity x Occurrence x Detection = RPN (Example) Read RPN definition then calculate an example. Use the supplier’s PFMEA if available. As you calculate the example move ahead to each of the charts. NOTE TO TRAINER: Remember this is NOT a PFMEA training session! Practice how you are going to present this calculation, it is easy to dwell too long on the charts. It is easy to lose your audience by not pacing this portion to your audience: don’t dwell too long, don’t skim too fast. Stay organized and on subject. Use a dry erase board to help illustrate, if appropriate.

PFMEA’s shall be completed for all manufacturing processes and support functions as required by the Quality Management System. Support functions include: (receiving inspection, material handling, labeling and shipping, etc…) PFMEA’s shall: conform to current AIAG guidelines and customer requirements. be updated on a regular basis (living documents). exist for all product lines / part numbers. include all processes and process steps. be utilized for Continual Improvement. have accurate Severity/Occurrence/Detection ratings. PFMEA Shalls are NOT all inclusive these are the examples to stress

Multi-disciplinary teams shall perform periodic PFMEA Reviews. The frequency and/or number of PFMEA reviews shall be determined by supplier leadership based on: customer expectations (PR/Rs, DDW, Launch activities, etc…) process capability (FTQ, SPC, etc…) changes to the process (Error proofing, Tier 2 changes, etc…) Criteria to prioritize which PFMEA to review include: product from an acquisition, tool move or change in supplier. PFMEA developed without adequate cross-functional involvement. PFMEA for part(s) with history of PR/R, Customer complaints, Warranty or FTQ issues. Occurrence ratings (FTQ, scrap, etc…) have changed significantly. PFMEA with oldest revision dates.

PFMEA Review shall include the following at a minimum: verification that all operations/processes are included and accurate (Paint, Heat Treat, Labeling, etc…). all process controls are included. Detection ratings are accurate . Occurrence ratings are analyzed using data (SPC, FTQ, Quality Gate, C.A.R.E.*, Scrap, Layered Audit* results, etc…). verification that the PFMEA meets customer requirements and expectations (AIAG, PPAP, Launch, DDW, etc…). Upon completion of the review, a list of the highest (RPN) Risk Reduction opportunities is established or revised based on the new data. An action plan or equivalent shall be utilized by the multi-disciplinary team to track progress in reducing the RPN ratings.

RPN TRACKING CHART (Proactive) (Example) Suppliers shall develop an action plan to reduce risk using RPN reduction strategies. If it is a small supplier with a simple process and no quality issues, the list might be a top 5. If the supplier has multiple lines with complex process and parts; the list must be longer.. If the supplier is in Top Focus, Controlled Shipping, or is in Launch, the list may be longer. The number of RPN must be consistent with the status of the supplier and their PFMEAs . The number of RPN on the list is dependent on complexity of parts and process, size of plant, customer feedback, etc…

(Example:) This is an example of a global APQP form. Please caution suppliers to check for latest revisions if they use this format. (This is for reference only; check for latest revision)

REACTIVE RISK REDUCTION: ERROR PROOFING PAST QUALITY FAILURES Multi-disciplinary team(s) shall be utilized to develop a list of the past internal and external quality failures. Team(s) identify true PFMEA Occurrence and Detection Rating for each RPN. Team(s) shall develop an action plan to Error Proof the failures. Recommended Actions are improvements that will prevent or reduce the Failure Mode. When Error Proofing is not feasible, a plan to improve detection shall be established. A team member shall be assigned responsibility for implementing the recommended action. Reasonable target completion dates shall be established. Most suppliers try to error proof past external issues as it is part of the PR/R process. Ask supplier if they know what their highest internal defect are and if they have a plan to error proof them. At minimum, occurrence and detection ratings need to be reviewed And usually revised. Severity may need revision if customer feedback indicates it was previously under estimated.

REACTIVE RISK REDUCTION: ERROR PROOFING PAST QUALITY FAILURES Error proofing shall be verified per the Error Proofing Verification* process. When corrective actions have been implemented, teams shall validate the new Occurrence and Detection rankings and resultant RPN. Teams shall update PFMEA’s with all corrective action measures.

RISK REDUCTION SITE LEADERSHIP: should review the need for PFMEA training at least once per year. shall support RPN reduction activities and provide necessary resources. shall review the RPN reduction tracking charts. shall ensure that formal multi-disciplinary teams are utilized in the preparation and ongoing review of PFMEA’s.

RISK REDUCTION SUMMARY PROACTIVE Leadership shall support RPN reduction activities and provide necessary resources. PFMEA’s shall undergo a complete review. A list of the highest (RPN) Risk Reduction opportunities shall be established. An action plan or equivalent shall be utilized by the multi-disciplinary team to track progress in reducing the RPN ratings. REACTIVE A list of the past internal and external quality failures shall be established. Team(s) shall develop an action plan to Error Proof the failures.