HIsarna, a Revolution in Steelmaking February 25, 2013 / Tim Peeters.

Slides:



Advertisements
Similar presentations
Why does ERA Need to Flourish
Advertisements

A 2030 framework for climate and energy policies Marten Westrup
10-1 McGraw-Hill/Irwin Copyright © 2010 by The McGraw-Hill Companies, Inc. All rights reserved.
Strengthening innovation in chemical clusters
Support for the coordination of activities TECHNOLOGY PLATFORMS Context, Rationale and State of Play Presentation by Julie Sors European Commission Rotterdam,
Using public procurement to foster research and innovation More Research and Innovation COM(2005) 488 of 12 October 2005 Commission communication to the.
Research and the Lisbon Strategy - giving renewed impetus to ERA European Research Area New Perspectives Green Paper COM(2007)161 James Gavigan - Euopean.
Innovation for sustainability E.E.T. Programme The Netherlands C. van As and R. Wismeijer.
ITRS Roadmap Design + System Drivers Makuhari, December 2007 Worldwide Design ITWG Good morning. Here we present the work that the ITRS Design TWG has.
Erasmus Mundus Information Day 20 January Erasmus Mundus Information Day 20 January ERASMUS MUNDUS PREPARING YOUR APPLICATION.
External Trade Trade and Environment The EU approach Paolo Caridi First Secretary, Delegation of the European Commission to Japan.
Integrating the Three Pillars of Sustainable Development:
1 9 November 2011 Heavy Duty Vehicle GHG emissions Philip Owen – DG Climate Action.
1 AIAA Delta Forum AIAA Public Policy A CRISIS IN AERONAUTICS The NASA Landscape Aerospace Sciences Meeting January 8, 2001 Carol A. Cash, Chair Aeronautics.
Yrjö Neuvo EIT Governing Board The EIT Sustainable Growth and Competitiveness through Innovation.
Funded by DG Research 6 th Framework Programme Summary of Policy Conclusions and Implications for the EU SDS Simon Dresner, Policy Studies.
EU LEGISLATION ON WASTE European Commission WORKSHOP ON EU LEGISLATION WASTE © 2010 Microsoft Corporation. All rights reserved. Waste in EU economy.
EU-Regional Policy Structural actions 1 GROWING EVALUATION CAPACITY THE MID TERM EVALUATION IN OBJECTIVE 1 AND 2 REGIONS 8 OCTOBER 2004.
1 A Public Private cooperation for bio-based products Francesco Degli Innocenti Novamont
Pécs Midterm review of the achievements of the Hungarian Presidency of the Council of the European Union András Rozmer Department of Strategy.
The Future of the Strategy with regard to the Outermost Regions - Brussels, 15 May 2008Note: document not legally binding 1 José RUIZ ESPI RTD.K.3 New.
The Implementation Structure DG AGRI, October 2005
1 THE EUROPEAN STEEL TECHNOLOGY PLATFORM Dr. J.C Charbonnier. Chairman of the Support Group Brussels December 16 th, 2005.
1 The role of macro- regional strategies after 2013 The Commissions view (or rather the view of one official) David Sweet, DG Regional Policy, European.
R&D and Sustainable Production in the Pulp and Paper Industry – Some examples Professor Gunnar Svedberg, INNVENTIA Sustainable Development: A Challenge.
1 Cohesion Policy support for Sustainable Energy Intelligent Energy Europe boosting regional competitiveness through sustainable energy Open Days Workshop.
1 EU Policies on Sustainable Energy Regions for Economic Change Workshop on Low-Carbon Economy: Energy Efficiency in Regions and Cities Brussels 21 May.
Regional Policy EUROPEAN COMMISSION Regions delivering Lisbon through Cohesion Policy Press Briefing by Regional Policy Commissioner Prof. Danuta.
1 17/3/2009 European Commission Directorate General Information Society & Media Funding Instrument Briefing for Remote Reading.
Professor Dave Delpy Chief Executive of Engineering and Physical Sciences Research Council Research Councils UK Impact Champion Competition vs. Collaboration:
European Commission Directorate-General Employment, Social Affairs and Equal Opportunities New Skills for New Jobs Annual Northern Ireland Skills Conference.
Chris Millward 26 May A new settlement for higher education ___________________________________________________________________________________________________________________.
SET-Plan Education and Training Roadmap Development
1 OceanEnergy Limited Mayors Conference, 5 th March 2011 John Keating, Commercial Director.
Building a Better Future Stretch Building Code October 15, 2009.
1 The Coca-Cola Company Confidential The Coca-Cola Company Sustainable Refrigeration For Commercial Applications Antoine Azar October 19th, 2009.
IBM Corporate Environmental Affairs and Product Safety
CII – EXIM BANK CONCLAVE ON INDIA – AFRICA PROJECT PARTNERSHIP ENERGY EFFICIENT TECHNOLOGIES IN MANUFACTURING UNITS Role of Energy Efficiency in small.
Current and pending measures, and insights from the steel and cement sectors Peter Wooders, Senior Economist, Climate Change, Energy & Trade, IISD (International.
March, 2010 OVERVIEW April, Scrap / Recycling Steel Mills Downstream Gerdau Ameristeel | Efficient vertical integration.
March 21, 2012 An Advanced Manufacturer in Steel California Steel Industries, Inc. Fontana, CA.
1 Methodology to model the future energy scenario for China Kejun JIANG Energy Research Institute, China UNFCCC Workshop on emissions.
Strategic Meetings Management 101
Andrea Mariottini Riello Gas Boilers Division
1 Meeting carbon budgets – 5th Progress Report to Parliament Committee on Climate Change, June If you want to tweet about this report.
© WRI & WBCSD, 2010 Metropolitan Washington Council of Governments (COG) Recycling Committee Meeting March 18, 2010 Greenhouse Gas Protocol Product/Supply.
1. 2 August Recommendation 9.1 of the Strategic Information Technology Advisory Committee (SITAC) report initiated the effort to create an Administrative.
21 st Annual Conference. Delivering sustainable solutions in a more competitive world Mercury Lamps - Life Cycle Assessment for Product Stewardship Peter.
The European Lighting Industry Position on How to Maximise the Potential Benefits of European Policy on Energy Efficiency in Lighting January 2008.
Technologies for CCS on Natural Gas Power Systems Satish Reddy April 2104.
CO 2 efficiency in European steel, cement and paper industry Long term vision on technological developments.
Findings from a survey of HGIEs in eight countries and policy implications Mutual Learning Seminar Session II: Policies to support high-growth innovative.
HORIZON 2020 STEPHEN FOX FOR KEELE UNIVERSITY 26 TH FEBRUARY 2014.
Leveraging the impact of climate finance through MDBs Ko Sakamoto Transport Economist Asian Development Bank.
Information and Communication Technologies (ICT) in the Seventh Framework Programme Large-scale integrating projects (IPs)
Current UK and EU Policy on Water Management Thames Tunnel Commission 29/7/11.
1. 2 Getting Momentum on Sustainability Steve Lee United Group Limited.
Missouri Enterprise Helping Missouri Manufacturers Make More, Sell More, Earn More Missouri Manufacturer Survey: The Top Ten Things You Told Us.
Global Demand Driven Research- system solutions Östen Ekengren IVL-Swedish Environmental Research Institute Stockholm Cleantech EUCETSA.
Environmental Sustainability in the Extractive Industry: The Case for Climate Change Mitigation Dr Uwem E. Ite.
SPIRE Brokerage event October 22 nd 2013 Project Idea Presentation SPIRE 7 – 2015: Recovery technologies for metals and other minerals.
SPIRE Brokerage event October 22 nd 2013 Project Idea Presentation SPIRE 2 – 2014: Agricultural residues valorisation as alternative fuels for energy intensive.
A Regulatory Framework for Energy Intensive Industries within the EU Berlin 30 November 2012 Chris Lenon – Green Tax Group BE.
Carbon Dioxide Capture and Storage (CCS) in China.
Valorisation and dissemination of EAF technology
1 1 CURRENT ENERGY POLICY CHALLENGES. THE 2030 ENERGY AND CLIMATE FRAMEWORK DG Energy, European Commission.
120 April 2016SPIRE Projects´ Conference 2016 Turning waste from steel industry into valuable low cost feedstock for energy intensive industry SPIRE Projects´
Erasmus Mundus Conference “Climate Change” Hydrogen Ironmaking A. Ranzani da Costa F. Patisson D. Wagner Institut Jean Lamour, CNRS, Nancy-Université Nancy.
Energy and Climate Change Working Group Industrial Decarbonisation
A Clean Planet for all A European strategic long term vision for a prosperous, modern, competitive and climate neutral economy.
Presentation transcript:

HIsarna, a Revolution in Steelmaking February 25, 2013 / Tim Peeters

2 Paper & Steel : Common Ground? CO 2 intensive (1.1% vs 4% of man made CO 2 ) Energy intensive High recycling rate (70% vs 95%) Capital intensive Major facilities > 20 years life span Large sites, large installations Threshold for implementation of breakthrough technologies Trend of past 20 years Process efficiency, labour productivity increase From Fragmented to Consolidated industry Changing competitive landscape in major markets Sustainability and Climate Change challenge

3 The Challenge in Steelmaking Growth Sustainability World steel consumptionAmbition to cut CO 2 emissions will double in 2050 by 50 % in 2050

4 The International Approach Climate Change is Global Climate Change is Long Term Support at board level, governmental level, EU level Build industrial partnerships, bring people together Use a broad range of expertise Build a common language TheBrand: Ultra Low CO 2 Steelmaking

5 The ULCOS project Objective: 50% reduction in CO 2 emissions per ton of steel from iron ore based steel production by 2050 Globally the largest steel industry project on Climate Change mitigation Core partners: ArcelorMittal, Tata Steel, ThyssenKrupp, Ilva, Voestalpine, LKAB, DillingerHütte/Saarstahl, SSAB, Rautaruukki Co-partners: 48 Institutes, Universities, Engineering companies, etc Budget:75 M Duration ULCOS I:2004 – 2010 ULCOS II:2011 – 201…

6 ULCOS Consortium: 48 partners

7 Idea Experiment Pilot Demo Industry CO 2 and sustainability modelling Selection Industrial Demo ULCOS - I Project Selection Criteria CO 2 Economical Technical maturity Social acceptance Other environmental aspects Fit with existing configurations Pilot plant progress ULCOS - II Project Inventory of 200 process options

8 Common approach, definitions, boundaries Everything is assessed for one ton of Hot Rolled Coiled (HRC) Classical Integrated Steel Mill Gate to Gate approach for the Focus area: Ironmaking is responsible for 85-90% of CO 2 per HRC

9 Selection Process: Funnelling the Options CO 2 and sustainability modelling Selection ULCOS - I Project ULCOS - II Project Top Gas Recycling Blast Furnace Gas based reduction Electrolysis of iron ore HIsarna 4 processes selected Inventory of 200 process options Better use of Carbon in retro-fitted plants Better use of Carbon in a new process Replacing Carbon with Natural Gas or Hydrogen Green power, mimic Aluminium production

10 Top Three Hurdles to Manage Technical High intensity, high efficiency process development Focus on generic long-term solutions Financial High risk, high reward Partnering: sharing benefit + cost + effort + risk Industry contribution + local / national / European funding Organisational Consortium People: availability, expertise, critical mass Communication Public relations Intellectual property

11 Iron ore coal Steel Production Process Route Where does HIsarna fit? Ironmaking Steelmaking Casting Rolling & Coating Steel products

12 Iron ore coal coke sinter Liquid iron Blast furnace HIsarna technology Comparison with the Blast Furnace route

13 Iron ore coal coke sinter Liquid iron Blast furnace Direct use of coal and ore No coking and agglomeration HIsarna technology Comparison with the Blast Furnace route

years of preparation before the first experiments HIsarna pilot plant

15 Key Success Factors Commitment from all levels Financial support Logistical, Engineering and R&D know-how on site Cooperation Perseverance Fast cycle of learning and improving Construction September 2010

16 Cold Commissioning, January 2011

17 First Start-up, April 2011

18 First HIsarna Hot Metal, May 2011 Production runner HIsarna pilot plant

19 With the ULCOS and HIsarna project the European steel industry is proactively approaching the Climate Change issue In the HIsarna project knowledge and experience of steelmakers and equipment suppliers from all over Europe is brought together HIsarna is a high risk/high reward innovation with the potential to have a strong environmental and economical impact on the steel industry Environmental impact: Without CO 2 capture and storage 20% reduction With CO 2 capture and storage 80% reduction Strong reduction of other emissions Economical impact: Wider range of raw materials Lower CapEx, OpEx HIsarna Summary

20 Challenges for HIsarna Future Demonstrate robustness of technology Further pilot plant campaigns: people, time, funding Up-scaling to industrial size Transition from generic to specific (location, size, configuration) Investment 250 M (± 50 M) Demonstration scale should have a competitive business case Governments can support this Many potential innovations in ironmaking have not survived this step Sustainable industry future, supported by National and European policies Review the 2050 Roadmap (environmental, economical, social landscape) Develop business case for pushing out Blast Furnace technology

21 What have we learned along the way? Think big: Focus on breakthrough, not incremental Partnerships, collaboration, trust Set scope, targets, common definitions Clear funnelling & selection process: Generic, Long Term solutions Handle good ideas outside the scope Dont bet on one horse When stakes get higher, stay connected with the business strategy Innovation comes from people with expertise