1 Case Study 1: Basic Oxygen Furnace (BOF) Gas based Electricity Generation S. Kumar, S. Sharma and R.M. Shrestha Asian Institute of Technology 4 April.

Slides:



Advertisements
Similar presentations
Guatemala: El Canada Hydroelectric Project
Advertisements

Environmental Management & Sustainability ALEX HETHERINGTON - Benefits Beyond Compliance Libstar Manufacturing Forum May Irene Country Club.
ARIN Public Policy Meeting
Technology Transfer in the CDM DUAN Maosheng Tsinghua University Linking Climate Mitigation Policy and Modeling in China Workshop February 18, 2006 Beijing.
DG Energy and Transport, European Commission Fabrizio Barbaso 16/04/2008 EU ENERGY SECURITY STRATEGIES ARF Energy Security Seminar EUROPEAN COMMISSION.
DG Energy and Transport, European Commission Fabrizio Barbaso 17/04/2008 EU RENEWABLE ENERGY PROPOSALS ARF Energy Security Seminar EUROPEAN COMMISSION.
Workshop on Inventories and Projections of Greenhouse Gas Emissions from Waste under WG 1 and 2 of the Climate Change Committee Overview of methods and.
Electric cars: part of the problem or a solution for future grids? Frans Nieuwenhout, Energy research Centre of the Netherlands ECN Sustainable.
Workshop recommendations: improving the quality of GHG inventories and projections for the LUCF sector part 2: Projections G. Seufert, Z. Somogyi S. Federici.
Panel discussion Low Carbon Generation Technology
T HE W ORLD B ANK C ARBON F INANCE U NIT UNFCCC W ORKSHOP : S TANDARDS FOR BASELINE SCENARIO IDENTIFICATION AND BASELINE EMISSION CALCULATIONS M ARCH 2011.
Implementation of the Suppressed Demand Guidelines in New and Existing SSC Methodologies Carolyn Luce, Small Scale Working Group Member FIRST SDM JOINT.
Addition Facts
Demand Resource Operable Capacity Analysis – Assumptions for FCA 5.
District heating year District heating and cooling 2013 Heat sales (incl. taxes)2 330 mill. Sold heat energy31,6 TWh Average price of.
11 Challenging the indicators Maria Rugina ICEMENERG-ROMANIA Supported by the European Commission under the ICT PS Programme Manchester, 12 th of October.
CII – EXIM BANK CONCLAVE ON INDIA – AFRICA PROJECT PARTNERSHIP ENERGY EFFICIENT TECHNOLOGIES IN MANUFACTURING UNITS Role of Energy Efficiency in small.
March 21, 2012 An Advanced Manufacturer in Steel California Steel Industries, Inc. Fontana, CA.
CLIMATE CHANGE & STEEL SECTOR IPCC WORKING GROUP IIIS DISSEMINATION WORKSHOP ON FOURTH ASSESSMENT REPORT October 11-12, 2007 Kolkata.
1 Methodology to model the future energy scenario for China Kejun JIANG Energy Research Institute, China UNFCCC Workshop on emissions.
Andrea Mariottini Riello Gas Boilers Division
A hypothetical estimation of emission reductions in a biomass power plant project Dr. Oscar Coto II National CDM Workshop Belize August 2011.
1 Meeting carbon budgets – 5th Progress Report to Parliament Committee on Climate Change, June If you want to tweet about this report.
© OECD/IEA 2010 Data Compilation Issues for Electricity and Heat Energy Statistics Workshop Beijing, China, Sept Pierre Boileau International Energy.
By Martín Gesualdi, Tecnolatina S.A, Suipacha 1111, Buenos Aires, Argentine, Phone/Fax ,
The European Lighting Industry Position on How to Maximise the Potential Benefits of European Policy on Energy Efficiency in Lighting January 2008.
Tel MW Wind Farm 100X850kW Wind Turbine 9 m/s Average Wind Speed 45% capacity factor 335 GWh/year Egypt / Spain Cooperation.
Clean Energy Project Analysis Course Greenhouse Gas Emission Analysis with RETScreen ® Software © Minister of Natural Resources Canada 2001 – Photo.
Biomass Cogeneration in ASEAN, GHG Mitigation Potential and the Barriers Dr. Ludovic Lacrosse, Arul Joe Mathias EC-ASEAN COGEN Programme UNIDO Expert Group.
Mitigating Environmental Emissions from the Power Sector: Analysis of Technical and Policy Options in Selected Asian Countries Ram M. Shrestha S. C. Bhattacharya.
© Vattenfall AB The Swedish Power Market Presented for Invest in Sweden Agency and Sun Microsystems Stockholm 20 March, 2009 Sandra Grauers Nilsson, Vattenfall.
Development and Prospects for JI UNFCCC Side Event November 30, 2005 Hiroshi YAMAGATA Ministry of Economy, Trade and Industry JAPAN.
1 Sustainable Development Assessment of CDM projects in Georgia Mariam Ubilava Istanbul, Turkey January, 2008.
Electricity distribution and embedded renewable energy generators Martin Scheepers ECN Policy Studies Florence School of Regulation, Workshop,
Addition 1’s to 20.
1 Workshop on inventories of greenhouse gas emissions from aviation and navigation May 2004, Copenhagen EU greenhouse gas emission trends and projections.
1 Introduction, reporting requirements, workshop objectives Workshop on energy balances and energy related greenhouse gas emission inventories (under WG.
EnvironmentEnvironnementCanada Nusa Dua, Bali, Indonesia September 5 – 7, Part 4: LFG Utilization.
Paul Acchione, P. Eng., B.A.Sc., M. Eng. Chair – OSPE Energy Task Force Management Consultant – MIDAC Corp. Presented to the Energy Mini-Conference Series.
Week 1.
Yuji MIZUNO Institute for Global Environmental Strategies Baseline for Waste Management Project Regional Workshop in Asia on Capacity Development for the.
ww.neprisoe.org CDM Methodologies Carbon Markets – CDM project development 8. August 2011 Jørgen Fenhann.
Baselines and Additionality Executive Board decisions so far Steve Thorne SouthSouthNorth COP 9 5 th December 2003.
Input-Output Analysis of Climate Change: Case Study of Efficiency Driven Policy Choice of Indian Response Strategy Joyashree Roy Jadavpur University, Kolkata,
Baseline methodologies for grid- connected electricity – Context and Introduction to the Combined Margin Baseline Calculation Martina Bosi, World Bank.
Capacity Development for Clean Development Mechanism Project Idea Note (PIN) Preparation by Kofi Asante.
China Thermal Power Efficiency Project WB support to the improvement of coal-fired power generation efficiency in China Jie Tang Energy Specialist East.
Case Study: Gemina rice husk project, Nicaragua (Scenario Analysis and Small-Scale Simplified Methodologies) Carbon Finance Unit The World Bank 22 October.
World Bank Experience with Power Sector Baselines Workshop on CDM Methodologies for Grid-Connected Power Projects Buenos Aires, 8 December 2004 Fernando.
Development Alternatives Baselines & Additionality Methodologies Workshop on Clean Development Mechanism: Opportunities in Rajasthan January 28-29, 2005.
Simplified Financial Analysis for Landfill Gas Capture Projects Presented By: Dr. M. K. Elewa TIMS - Egypt Approved Baseline and Monitoring Methodology.
Carboncredits.nl Baseline Methodologies Dispatch Analysis Gerhard Mulder Project Officer.
CD4CDMCD4CDM Estimating CO 2 Emissions Reduction by example.
CDM Project Developers Workshop.  Boundaries & Leakage  Calculating emissions reductions  Any other issues Session II.
TA Project: “Improving Emissions Control” Session 2 Scenarios for Emissions Management Dr Russell C Frost Project Team Leader.
1 N.K. Tovey ( 杜伟贤 ) M.A, PhD, CEng, MICE, CEnv Н.К.Тови М.А., д-р технических наук Energy Science Director CRed Project HSBC Director of Low Carbon Innovation.
Technology Transfer and Investment Risk in International Emissions Trading (TETRIS) Work Package 3: Permit Supply from the CDM (TETRIS Meeting, Amsterdam,
CDM Projects: Renewable Energy and Energy Efficiency Projects Project cycles and Technical Issues.
TIGGER Program Public Webinar April 8, 2009 The American Recovery & Reinvestment Act of 2009.
AIT Baselines and Additionality Sudhir Sharma Asian Institute of Technology Bangkok, Thailand 24 th March 2004.
Case Study 1: Comments on Transparency and Conservativeness Alan Silayan klima-Climate Change Center.
El Gallo Hydroelectricity Project PDD Analysis
1 Case study: Sofia District Heating Dr. Venkata R. Putti Team Leader, Carbon Finance Assist The World Bank Minsk / Belarus, March 2007.
Quantification of the CDM effect: PT.NOEI Integrated Solid Waste Management Project in Bali Mitsubishi Securities Clean Energy Finance Committee Workshop.
Case Study: Gemina Rice Husk Project Nicaragua (Scenario Analysis and Small-Scale Simplified Methodologies) Carbon Finance Unit The World Bank 22 October.
UNEP Collaborating Centre on Energy and Environment Use and Conceptualization of Power Sector Baselines: Methodology and Case Study from El Salvador Lasse.
Case study 1 Review comments on Baseline Methodology Waste heat use project Prepared by Nguyen Van Hanh Vietnam.
0 Allocation in phase 3 of EU ETS Case study: integrated steel mill.
Kenya’s INDC: Actions in the Energy Sector
Dominik Franjo Dominković. , I. Bačeković, D. Sveinbjörnsson, A. S
Presentation transcript:

1 Case Study 1: Basic Oxygen Furnace (BOF) Gas based Electricity Generation S. Kumar, S. Sharma and R.M. Shrestha Asian Institute of Technology 4 April 2005

2 To provide the background of Case study 1 – Project description – Baseline Methodology description The project details Baseline Methodology –Methodology: Applicability conditions –Identification of Baseline scenario –Additionality –Project Boundary –Baseline formulae –Leakage –Emission reductions –Data Sources and Vintage Presentation Objective Presentation Outline Presentation Objective and Outline

3 INTRODUCTION

4 World steel production – 965 million metric tonnes (mmt) ((63.3% by BOF) China (1 st ) – mmt; Japan – mmt; USA – 90.4 mmt India (8 th ) – 31.8 mmt (48.7% by BOF process) Total production for the Asian region was 41.4 mmt, a rise of 10.3% on February China produced 24.8 mmt of crude steel in February, up 21.2% on the same month in Source: SOME STEEL DATA 2003 Feb. 2005

5 The Jindal Vijayanagar Steel Plant ( JVSL) is the most modern, technologically efficient and eco-friendly integrated steel plant of its kind, and uses the revolutionary Corex technology. The Plant has a hot rolling capacity of 2.5 million tpa. During the production of steel using BOF process, CO is produced. This has a calorific value of about 2,000 kcal/Nm 3. This gas is currently flared. It is proposed to collect and use this gas as a fuel in a power plant to produce electricity. The electricity to be supplied to the state grid (about 95 GWh per year). The power plant currently uses coal. as a fuel for internal heating requirements of the plant It is estimated that the primary emission reductions would amount to 575,967 tonnes of CO2 during the 10 year crediting period. Source: Project Documenthttp:// SOME PROJECT DATA

6 BOF gas, 2000 Kcal/NM 3 Used as fuel for heat Power Plant (i)Supply to existing power plant (sister concern) no capacity increase (BASE: only coal); & (ii) Few New proposed power plant supplying to grid PROJECT: Gas Collection, cleaning, storage and distribution system Base Case: Flared PROJECT DESCRIPTION - SCHEMATIC STEEL

7 Source: BOF GAS BASIC OXYGEN FURNACE (BOF) OPERATION

8 VSNL Plant 540 km 460 km PROJECT LOCATION

9 BASELINE METHODOLOGY

10 Methodology: Applicability conditions Part of waste gas used for internal heating requirements within the steel manufacturing industry, and remaining waste gases would normally have been flared in the absence of the project activity; Project activity does not induce diversion of waste gases required for internal usage, to project activity; No change in process except changes due to collection, stabilization and transportation of waste gases to electricity generators; No local regulations/ programmes to constrain use of GHG intensive fuels (like coal), nor any regulation making use of waste gases mandatory; and Project activity results in supply of electricity to local grid, excluding grids with surplus power, unless cost of generation and supply is favourable for inter-grid transfers. Though not stated – methodology applicable to project that supplies gas to –Existing power plant with no expansion of capacity, or –Existing power plant with gas meeting requirement of capacity expansion, or –New power plant supplying to grid.

11 Identification of Baseline Scenario Approach – 48(a) existing actual or historical. The baseline scenario (ie. in the absence of the proposed project activity) has the following components: –Flaring of excess BOF gas –In absence of use of BOF gas for electricity generation use of more GHG intensive fuels for generation of additional electricity at the existing power plants leading to emission of GHG (Case I); and need to establish new power plants to meet any shortfall in supply, with possibility of further GHG emission (Case II).

12 Identification of Baseline Scenario –Case I: Partial replacement of existing GHG intensive fuel in an existing power plant (no generation increase). The baseline scenario is therefore continued use of the GHG intensive fuel. Baseline: GHG intensity of existing power plant. –Case II: Use of waste gas to generate additional power in existing power plant and/ or generate power in new power plant(s). The baseline scenario in this case is electricity would have otherwise been generated by the operation of grid- connected power plants and by addition of new generation sources. Baseline: Combined Margin grid intensity – based on ACM0002 methodology.

13 Additionality Use of Tool for assessment and demonstration of Additionality –Investment analysis investment comparison analysis using a financial indicator (such as IRR, NPV,cost benefit ratio, levelized cost of electricity generation or Rs./kWh values), and checking whether there is at least one identified alternative which is better for investment than the project activity. The chosen alternative to the project is flaring of the waste gases, and purchasing power from the grid. The cost of power in the alternative scenario in comparison to the project activity is Rs 1.94/kWh.

14 Project Boundary Source: Project Document This includes points of generation of waste gases in steel mfg operation, stabilisation, cleaning and transportation of these gases to the power plant through a gas handling network, delivery of power to grid, and all associated equipment for such project activity, under the control of the project proponents.

15 Baseline Case I: Formulae used Partial replacement of existing GHG intensive fuel in an existing power plant (no generation increase).

16 Baseline Case 2: Formulae Used Operating Margin Build Margin The sample group m consists of either: · five power plants that have been built most recently [including plants under construction], or · power plants capacity additions in the electricity system that comprise 20% of the system generation (in GWh) and that have been built most recently [including plants under construction]. Use of waste gas to generate additional power in existing power plant and/ or generate power in new power plant(s).

17 Leakage Due to use of displaced hydrocarbon fuel by other smaller power generators who currently use renewables. –However, in cases where there could be demand for power, such possibilities are ruled out since this would necessitate replacement and use of alternate power generating technology, which may not be feasible for a smaller generator. Diversion of waste gas use to producing electricity –rate of waste gas generation fixed a priori, and –the waste gas utilisation for internal heating and steam generation cannot be less than the sectoral average in the country or region CF: Correction Factor for gas quantity eligible for emission reduction = Minimum[(X-Z), Y, W] / W –Y : minimum quantity of waste gases flared in the steel manufacturing industry (average of sector during the last 3 years) – Z: average amount of waste gases used for internal requirements of all waste gas generators (in similar steel manufacturing sector) in the region or country during the last 3 years –X: the minimum quantity of waste gases generated in the steel manufacturing industry sector during the last 3 years, and –W: waste gas supplied to power plants –If the steel industry sector values for X,Y and Z are not available, then CF = 1

18 Emissions Reductions In existing power plant where only fuel replacement occurs –ER y (1) = Baseline I * CF – PE y In existing power plant where fuel replacement occurs along with additional power generation –ER y (2) = (Baseline I + Baseline II)* CF – PE y In a Greenfield power plant connected to the grid or approximate emission reduction –ER y (3) = Baseline II* CF – PE y If more than one of the above occurs, then ER y (4) = (Baselinei * CF) - PE y Note: PEy = 0

19 Data Sources and Vintage Fuel –Consumption, Calorific value, heat rate: Proprietary data –Emission factor : IPCC –Heat Rate : Proprietary data Electricity delivered: Regional Electricity Board Waste Gas: Proprietary data Local level data: 3 years old or of lesser vintage Regional level data: 5 years vintage

20 Next …. Basic information regarding the project has been presented Whether the Methodology has been completely defined Transparency and Conservativeness has been taken into account Is the Methodology correctly applied Thank You