Behaviour and Design of Steel Structures Lecture 3 Conceptual design.

Slides:



Advertisements
Similar presentations
CONTENTS Accuracy of Construction Cost Estimating 00 Abstract
Advertisements

2008 Subsurface 3D Modeling: An Application to Waterfront Project Planning and Site Evaluation Andrew S. Thomas Moffatt & Nichol 600 University St, Ste.
1.1Definition of Construction:. Is the process by which material, equipment, machinery are assembled into a permanent facility. Is the process by which.
PRESENTATION ON TURNKEY CONSTRUCTION.
Lec 25: Ch2.(T&LD): Site planning
Wireless Deployment : Site Survey Access Network SID ETP – Groupement Télécoms - 25 Mai 2005.
Construction Management. Players Owner – owns project upon completion of construction –Private – owner owns land and pays for construction of facility.
CONTRACT A binding agreement between two or more parties for performing, or refraining from performing, some specified act(s) in exchange for lawful consideration.
CERTIFICATE 4 IN BUILDING BCGBC4004A. 18 week course First 10 weeks in classroom Following 8 in computer room 1.30pm pm (with 15 min break) Assessments.
What is Structural Engineering?. What is engineering? “The art or science of making practical application of the knowledge of pure sciences, such as physics.
CDIO Approach for Real-Time Experiential Learning of Large Structures By Dr Tao Nengfu, Yoong Yuen Soo, Tan Poh Seng School of Architecture and the Built.
John Boon ZUT November Procurement Systems The organisation of the interaction between the purchaser of a new building and the suppliers of goods.
The design loop Integrated Technologies The Design Loop Grade 9 Integrated Technology.
Construction Engineering 221 Drawings and Specifications.
Types of Drawings University of Palestine Eng. Nagham Ali Hasan
Cydney McGlothlin, Architect, University of Florida, Gainesville FL
Construction Procedure. Identifying potential site Initial site appraisal Initial feasibility study Discussion with statutory bodies Detailed feasibility.
Development Appraisal Chia Fah Choy MSc, BAppSc (Hons) Assistant Professor, BE, FES, UTAR.
FLOOR PLANS APPLICATIONS OF TECHNOLOGY. WHAT IS A FLOOR PLAN?  A floor plan is drawing of a building with the roof removed as seen from above.  The.
CIVL202 Construction Engineering I Tutorial 2 T1Mon11:00 – 11:50 T2Wed09:00 – 09:50.
Genesis Solar Module Brochure ™
What Is Design? What Is a Design Process? Design Process Examples The Design Process © 2012 Project Lead The Way, Inc.
ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria ARC 807: Professional Practice.
Constructionsite Roles in Construction Ron Gatepain.
YOUNG PROFESSIONALS SEMINAR CIVIL ENGINEERING CHALLENGES Venue: CSIR International Convention Centre Gauteng Date: 22 November 2013 Presenter: Vikash.
2009/ 2010 Linus Wang MBA, MSc (Int’l Constr Mgmt), B Eng (Civil) Diploma in Construction Management Diploma in Quantity.
Architect Eionde Driver.  Meet with clients to determine objectives and requirements for structures  Estimate the amount of required materials, equipment,
An Architect works to make designs for new buildings and the spaces around them. Working closely with users, clients and officials to make sure that projected.
Lecture #2: The Design and Construction Team Professor: Robert Powell, AIA TA: Matt O’Brien, AIA August 20, 2008 AREN 231: Methods and Materials.
BASICS IN IRRIGATION ENGINEERING 2.1. Planning Irrigation systems 2.2. soil-plant-water relation – over view 2.3. Crop water requirement 2.4. Base, delta.
Report on the Challenges in the Planning and Procurement of Services for the Ceres and van Rhynsdorp Correctional Facilities Portfolio Committee on Correctional.
Preparing the Bid Package (A Developers Perspective)
PROJECT PHASES ACT Objective To provide an understanding of the design & construction process and the roles of the different participants in this.
PHASED ACTIVITIES AND BASELINE DOC’s FOR UTIILITIES ACQUISITION BULK SERVICE LIF-CYCLE APPROACH IDENTIFICATION & ANALYSIS APPLICABLE TECHNOLOGY / RESEARCH.
STRUCTURAL ENGINEERING. What Does a Structural Engineer Do?
DESY_ILCW07 Global Design Effort-CF&S 1 Beam Delivery System & Interaction Region Fred Asiri CF&S Point of Contact.
Chapter 10 Architectural Design. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Distinguish.
Presentation to Grangegorman Project Team Environmental Health Sciences Institute Update (14 th Nov 2012)
Chapter 13 Estimates for Remodeling Work
Planning Team Facility Owner Local CTA/Facility Users Parks and Recreation Facility Manager/Tennis Professionals Facility Maintenance Design Professionals.
Management Approaches. Construction Management Customer appoints Design team and Management team.
PLANNING CONSTRUCTION. Initiating Construction private sector – residential, industrial, commercial public sector – public works.
Preproduction: Engineering Design
Introduction to Civil Engineering and Surveying April 6, 2016.
UNIVERSITY OF PALESTINE FACULTY OF APPLIED ENGINEERING & URBAN PLANNING CIVIL ENGINEERING DEPARTMENT ENGINEERING PROJECT MANAGEMENT CHAPTER 3 INTRODUCTION.
Edexcel BTEC Level 2 Diploma in Construction Members of the Construction Team Unit 1 Structure of the Construction Industry.
English for Construction Engineering Management ,建筑工 程专业英语 赖小东 授课教师:赖小东 Cell# 江西财经大学旅游与城市管理学院工程管理系.
English for Construction Engineering Management ,建筑工 程专业英语 赖小东 授课教师:赖小东 Cell# 江西财经大学旅游与城市管理学院工程管理系.
DR. Nabil Dmaidi F ACTORS THAT D ETERMINE V ARIATION IN E STIMATES.
Food Plant Design and Pilot Demonstration
Architectural Drafting Equipment
((Organizing relationship between the Owner and Contractor involved in construction project at Palestine)) By: Maw`ed Abu Shamleh Malaak Hamaydi Supervisor:
RIBA Plan of Work 2013.
Applications of Technology
COST PLANNING AND ESTIMATION
The project's conception: A feasibility study is done
Pre-contract Planning and Practice
Monday 14th May – Friday 18th May 2018
1 Semester Project Design A Multi Story Office Building
Contractual Arrangement
Back Ground Information
Definitions EPC EPCM Design/Build Contract Lump Sum
1.03 Career Options.
Construction Contracts
RIBA Plan of Work 2013.
Muskat Secondary School Project
Stoke Medical Centre RIBA Plan.
RIBA Plan Tom Robinson sir david Swindells Vii
TOTAL COST CONTROL ON CONSTRUCTION PROJECTS
Advancd Measurement and Contract Administration
Presentation transcript:

Behaviour and Design of Steel Structures Lecture 3 Conceptual design

Engineer Ingenio (Latin) I create, devise, design Ingenious Ingenuity, creativity, engineering

History Military Engineers First engineers Designed and constructed Siege Devices Engines – Latin derivative Civil Engineers – Thomas Telford Steam Engines Denigration of word Engineer

Creativity Total experience –From conception, through design to completion of construction. Includes analysis, computers, drawing, etc., as tools to complete the design.

The Team Client Project manager Architect Structural Engineer Services engineer Geotechnical engineer Environmental engineer Transport engineer Quantity Surveyor Contractor

Vital Understand and be confident of what you are doing Need to be sure that your answer is correct and be able to justify your opinion Start with Paper and Pencil –WL 2 /8 –Back of an envelope Proceed with initial thoughts on Design development

Clients Brief Use Economy Site / Location Space Access Parking Facilities

Considerations Clients brief Architect Structural Engineer Services engineer Topography Ground conditions Access Material availability Economics Environment

Fees Scale Fees – old way –%age of final Contract Sum Contract total is £5m Fee at 4% is £200k Average Cost = £30/hour Hours = 6666 or 175 man weeks –Conception –Report –Design –Detail –Tender Documents –Construction Administration

Fees (Cont) Fixed Lump Sum –About 2% Target Fee –%age of Profit Term Appointment –Agree with Client for say 5 years –Fees by negotiation built around previously agreed rates.

Requirements Topographical survey Ground investigation Services survey Environment survey Sources survey Contractors survey

Designers Report Sketch proposals Considerations –Frame –Materials –Suitability Integration with Team Response from Team

Exercise Prepare sketch proposals for a steel framed building for the space defined. The room has to be capable of being partitioned into 3 rooms. Allow 2.0 m space in the roof for Services. Show dimensions and draw beam depths and column widths. Use the following as a basis Simple Beams : span to depth 1 – 10 to 1 – 15 Continuous Beams : 1 – 20 to

Behaviour and Design of Steel Structures Lecture 4 Simple Beam Design