“Advanced technology for bridge superstructures”

Slides:



Advertisements
Similar presentations
HIHI IVMAA - March 2005 Lessons from the ice storm of 1998 in Québec (from Bérubé Roger and C. Houde August 3, 2003) François Gauthier, f. eng., M. Sc.
Advertisements

Potential Solutions Goals for Design – What are we concerned about? –Primary Goal: Get the deck on successfully Stability during deck pour Stability during.
ODOT Structure Project Manager Seminar Concrete Decks
PHYSICS 1401 JEFFERY DING ALAN JONES
CIEG 301: Structural Analysis
Fibre Volume Fraction and Laminate Thickness
Introduction Composites have found their place in aerospace and in the sporting goods industry, where they have displaced many metal applications. The.
1 Challenge the future Subtitless On Lightweight Design of Submarine Pressure Hulls.
Materials Used in Civil Engineering.
FRP COMPOSITES FOR INFRASTRUCTURE APPLICATIONS
Euro-Zel th International Symposium Advanced Composite Materials for the Railroad cars Presented by Irina Garustovich Moscow State University of.
Concrete Beam Economics Bob Lawrence Alan Schuetz James Giancaspro Mark McDonnell.
Introduction to composite construction of buildings
Team Members: Jon DixonMatt SacksDarrin BeamNathan Murray
Wood Structural Panels
>ENTER< [PLS PUT ON SAFETY HELMETS BEFORE ENTERING THIS SITE.]
3D Analysis with AASHTOWare Bridge Design and Rating
Civil Engineering Materials
Case 1. To Build a Production Power Boat. A Production Power Boat The boat itself is Length 8 M, Beam 2.5 M, DISP 3200 KG, HP 225 Yamaha Outboard. What.
Chp12- Footings.
Bridge Engineering (6) Superstructure – Concrete Bridges
Neptune Research Inc. Introduction For more than 25 years, Neptune Research Inc. has focused its strategic research initiatives on the development, manufacturing.
The World’s First Thermoplastic Bridges made of Recycled Plastics
Nottingham Centre for Infrastructure Bridge Engineering Research Dr John S Owen.
5. HEAVY TIMBER FRAME CONSTRUCTION
Lecture Goals Slab design reinforcement.
Chp-6:Lecture Goals Serviceability Deflection calculation
ONE-WAY SLAB. ONE-WAY SLAB Introduction A slab is structural element whose thickness is small compared to its own length and width. Slabs are usually.
Presentation about Reinforced concrete
Shear Capacity of Composite Steel Girder at Simple Support Virtis/Opis User Group Conference Nashville, TN, August 3-4, 2010 George Huang, PhD, PE California.
CM 197 Mechanics of Materials Chap 14: Stresses in Beams
CONCRETE PROTECTION MATERIALS & TECHNIQUES CE 402 DONE BY AHMED AL-HAWAS FAYEZ AL-SAIKHAN.
INTERIOR WALL FINISHES
Chapter 19 Floors.
FRP Reinforcement of Concrete
Pultruded Fiberglass Components. About Us  Established in 1976, Mihir Engineers Limited today is one of the largest manufacturers of FRP and RCC Cooling.
Fiber-Reinforced Polymer (FRP)
University of Sydney – Structures SECTIONS Peter Smith & Mike Rosenman l The size and shape of the cross- section of the piece of material used l For timber,
COLUMNS. COLUMNS Introduction According to ACI Code 2.1, a structural element with a ratio of height-to least lateral dimension exceeding three used.
Teacher: Mark Casto Lab Assignment: Progressive Collapse of RC Structures Principal Investigator: Mehrdad Sasani.
CIA Biennial Conference Melbourne October 2005 High Performance Concrete in Bridge Decks Opportunities for Innovation.
1 COMPOSITE MATERIALS What are composite materials? Two or more materials bound together Example from civil engineering: Concrete reinforced with steel.
How to fabricate optimum/complex materials from single materials
Structural Engineering
Reinforced Concrete Design
REPAIRS AND REHABILITATION OF STRUCTURES UNIT – II
UAS Universal Anchoring Solutions The Helipost™ An environmentally friendly engineered alternative to expensive concrete anchors and piers, the Helipost.
Bridge Design to AS 5100 Sydney May 25th 2005 Using High Strength Concrete with AS 5100 opportunities and restrictions.
Fiber Reinforced Concrete (FRC)
Design of Concrete Structure I Dr. Ali Tayeh First Semester 2009 Dr. Ali Tayeh First Semester 2009.
Task 2.2 – Identification of most suitable face-sheets and optimization of panel properties Duration: month 1 to month 12 Partners involved: MOTULAB (WP.
FIBRE REINFORCED POLYMER - NEW AGE CONSTRUCTION MATERIALS
. Client: City of Pittsburgh, Brighton Heights Community Objectives : Develop a pedestrian/bicycle bridge reconnecting Brighton Heights to Riverview park.
Overdriven Nails in Structural Sheathings Overview.
1 ROAD & BRIDGE RESEARCH INSTITUTE WARSAW Juliusz Cieśla ASSESSSMENT OF PRESTRESSING FORCE IN PRESTRESSED CONCRETE BRIDGE SPANS.
FIBRE REINFORCED POLYMER - NEW AGE CONSTRUCTION MATERIALS PRESENTED BY UNDER THE GUIDENCE OF ARIF M. HIREHAL Dr. SATISH A. ANNIGERI.
CIVI 6061-Strengthening of bridges using FRP
Presented To: Dr. Ashutosh Bagchi
FRP external strengthening Flexural upgrade
CONCRETE PROTECTION MATERIALS & TECHNIQUES
Girder-deck system (cm)
INTRODUCTION.
ASSESSEMENT AND REHABILITATION OF STRUCTURES
بسم الله الرحمن الرحيم.
ASSESSEMENT AND REHABILITATION OF STRUCTURES
Materials Innovation Hub Challenge Martin Richardson
FIBER REINFORCED CONCRETE
5. HEAVY TIMBER FRAME CONSTRUCTION
Fiber Reinforced Polymer Systems
Presentation transcript:

“Advanced technology for bridge superstructures” GFRP (Glass-Fiber-Reinforced-Polymer) Composite System for Bridge Superstructures “Advanced technology for bridge superstructures” Cantat Associates Inc. Toronto, Ontario, Canada 2010

1. How did it happen? As it is known, the actual lifespan for steel, reinforced concrete and steel-reinforced concrete SS’s everywhere in the world is no longer than 35 to 50 years, which is much shorter than Canadian, American, or European Bridge Design Code requirements. The causes for such a dramatic mismatch, in our analysis, are: 1. Acid rains, occurring with increasing frequency over the last several decades. 2. De-icing salts widely used to prevent traffic sliding. 3. Contaminating debris, increasingly being brought on deck wearing surface by truck wheels. 4. Damage to structural elements due to fatigue. The cause for such a short lifespan cannot be blamed on the growing weight of heavy trucks. In our opinion during the last 60 years, the average weight of heavy trucks has increased by no more than 20%. Within the Bridge Design Codes, this problem is solved by using conditional live loads (i.e. conditional heavy trucks, much heavier than real trucks) and a significant magnitude of live load factor in calculations, as well as much better than theoretical live load redistribution in real superstructures. The precise space calculations of a superstructure’s cross-sections and test results are confirming this statement theoretically as well as practically. To summarize: the unanticipated changes in environment and material properties over time are the primary causes for dramatic reduction in the service life of bridges. The secondary cause in the SS’s degradation is insufficient funding for proper maintenance.

2. What to do? The obvious conclusion for the Engineers was to seek alternatives to the materials conventionally used in bridge construction and rehabilitation. The solution would involve using materials that are not vulnerable to environmental damage and would increase service life, which means durability of bridge SS’s. On the other hand, the life cycle and maintenance costs would have to be competitive with traditional materials, because of the limited resources available for maintaining those bridges. Such alternative material was found. It is FRP (Fiber-Reinforced-Polymer)-composite product. In the mid 1930s as a part of experiment FRP was used for a boat hulls. From that point on and during the following 50 years, FRP-composite was used in marine, chemical processing, aerospace, for military items and transportation. Now, the worldwide attention is focusing on the opportunities offered by structural composites and structural industry. Composite FRP material is formed by using high strength artificial fibers (for example E-Glass, Carbon-Fibers, Basalt-Fibers and so on) and Resin (vinyl-ester, polyester and Epoxy) and offers many advantages: It is very strong and durable material, not sensitive to environment; It is much lighter than concrete or steel.

According to Canadian official information, reinforced concrete and steel- reinforced concrete structures during their lifetime of 35 to 45 years required an additional investment for their maintenance and rehabilitation of at least 40-50% of their initial construction costs. FRP-composite structures on the other hand do not require maintenance, or require minimal investment for painting of their open surfaces. There are three main methods for production of composite structures: Molding (mostly for small structural elements); Pultrusion (mostly for extensive elements, relatively with conditionally small cross-sections); Infusion (mostly for big structural elements). Cantat Associates Inc. selected GFRP composite material using infusion method for production, high strength E-Glass Fiber and Epoxy Resin.

3. How did we solve it? GFRP-composite system for bridge superstructures To meet time and situation challenges, Cantat Associates Inc. have developed a composite system for bridge SS’s in which steel, wood and GFRP are working together. Steel and wood are totally encapsulated by GFRP casing and are protected against corrosion and degradation. In our R&D we tested thousands GFRP samples based mostly on American Standards ASTM:

Average Statistical test result Taken in consideration for design - Tensile strength and 1,000 MPa 800 MPa corresponding Modulus of Elasticity 45,000 MPa 35,000 MPa - Compression strength and 900 MPa 700 MPa 42,000 MPa - Flexural strength and Modulus of Elasticity 46,000 MPa - Shear strength 50 MPa 20 MPa Shear Modulus 3,600 MPa 2,400 MPa - Coefficient of linear Expansion 0.000011 / °C 0.000011 /°C - Acceptable max value of the strain in GFRP (ULS – see § 13.11.2.3, CHBDS) - 0.005 < [0.006] - Strains changes in GFRP equal strain changes in adjacent wood or steel (SLS – see § 16.11.2.2) - Durability test (UV-test with changing “t” from 130°C to -130°C) - 5600 cycles – lost 1 micron ~ 150 year - Mass density 2,050 kg/m3

Glue-nailed Laminated timber core shell conform to CAN/CSA-0122 (Spruce-Pine-Fir selected wood or #1) Plywood shall be CANPly Exterior Canadian Softwood Plywood (CSP) certified by CSA-0151 (thickness shall not be less than 25.5 mm, number of plies shall not be more than 9, not less than 7) From year 2002 up until today we made a long way to get considerably adjusted GFRP material: To find the most efficient sections of our Hybrid GFRP composite structures; To efficiently include GFRP composite deck in combine operation with steel girders; To elaborate efficient details for deck fixation, to steel girders, barriers, the deck fixation to the steel frame; To attach elements of the deck to each other We already tested in full size GFRP-wooden composite beams 3m in length. We designed, tested and installed nine different superstructures from 11m simple span up to 90m one span, including a Hybrid – GFRP- composite deck and a Skew bridge. All those bridges had been designed and successfully used for the last 4-7 years under Truck Live Load 625 kN, one of those bridges is a pedestrian bridge over HWY 10, with continuous SS’s (scheme 24+36+24m). Another bridge was installed under a highway in Nova Scotia.

The main advantages of our GFRP-composite SS’s are: 1. Extremely long expected durability: over 100 years 2. Light weight: increases superstructure's capacity or reduces volume of the material(s) (e.g. steel) 3. Quick installation: usually installed and opened to public traffic in 2-3 hours 4. Environment-friendly: prefabricated, eliminating scaffolding and contaminating debris 5. Maintenance free life cycle: not sensitive to the environment does not corrode or deteriorate and only requires painting of deck (superstructure) open surfaces once in a decade 6. Year-round construction: suitable for construction in both cold- and warm-weather conditions 7. Final costs now is approximately 5-10% lower than steel or reinforced- concrete SS’s and no costs or minimal costs for their maintenance The primary reason for using GFRP-composite SS’s is their unique long-term durability. There are no alternatives to this product anywhere in the world. The Ministries of Transportation of both Ontario and Nova Scotia have already recognized and adopted this system.

Tests conducted Type of tests conducted coupons Beam sections, Deck sections, Results: MOE, Shear, etc. Testing conducted by Cantat Associates Inc. University of Western Ontario Triodem Integrity Testing Lab Results Product in conformance

Page 194 of CHBDC says, the use of model analysis, involving the testing of a physical model of the whole or part of the bridge, is acceptable as an alternative to, or in addition to, other methods of analysis permitted in this Section. CHBDC CL 625 Truck Loading

See page 194 CHBDC and provide test report to owner Test every bridge Load at plant Load at site See page 194 CHBDC and provide test report to owner

9.13m long x 8.7m wide

Typical Prefab bridge panel

Typical Deck to steel girder connection

Typical Diaphragm Connection

Typical Panel to Panel Connection Stage 1

Stage 2

Stage 3

Toronto, Ontario, Canada Contact information: Cantat Associates Inc. Toronto, Ontario, Canada Alexander Zevin - +1 (416) 505-7139 Arie Prilik - +1 (647) 500-2441 Danny Golnik - +1 (416) 836-4455 Fax: 647-436-1844 E-mail: cantat@rogers.com dgolnik@cantat-associates.com