COPYRIGHT © AREMA 2008 of 421 TUNNELS. COPYRIGHT © AREMA 2008 of 422 General Tunnel Inspections present unique challenges Track Time Sensitive Good lighting.

Slides:



Advertisements
Similar presentations
Traffic Data For Pavement 2012 FHWA Highway Information Seminar, Arlington, VA Tianjia Tang, PE, Ph.D. Chief, Travel Monitoring and Surveys Division 421.
Advertisements

Chapter-2 Parts of Steel Bridge.
Actions and Retrofit of Post Earthquake-Damaged Bridges
Breaking and Breaching. Tools Used Sledge hammers –Long and short handled Chisels Pinch point pry bar –“Crow bar” Hacksaw Handsaw Bolt cutter Flat head.
Pipe Supports and Hangers
MNM Fatal Falling Material Accident Falling Material Accident August 17, 2012 (Florida) August 17, 2012 (Florida) Victim Recovered September 4,
SEMINAR IN ADVANCED STRUCTURE analysis and design of box culvert
Cooling Tower Maintenance Training.
Supervision and Administration
Walls Ron Gatepain constructionsite.
CONSTRUCTION OF SOIL NAILING WALLS
Architecture The art of sheltering people both physically and spiritually from the raw elements of the unaltered world Vertical Horizontal.
OSHAX.org - The Unofficial Guide to the OSHA
OSHA Office of Training and Education
Fire Behaviour Elements of Structure and Fire Development.
Architectural Drawing
Reconstruction of the Eads Bridge Highway Deck
Foundation Systems.
Module 15: Railway Structures
Wall plate should measure the insertion point height plus 30” to accommodate a 30” cleat. The 30” cleat receives 20 X 16d nails. Cut the wall plate and.
Foundations. Foundation supports weight of structure –Includes soil and rock under foundation –Building construction described by foundation type Slab.
Section Two Collapsing slopes. What is a landslide? soil layer rock layer wet soil Landslide takes place when large masses of loose rocks and soil move.
Highway Maintenance & Rehabilitation
Damage Illustrations. Potential Bridge Damage Bridge Component / DamagePossible Cause Approach Slab or Pavement  Raised, lowered, cracked, or buckled.
Bridge Maintenance and Repair.
COPYRIGHT © AREMA : 1 of 24 Module 17: Utility Occupations.
Floor Systems and Foundation Support
ASSALAMUALAIKUM & GOOD MORNING
ERT352 FARM STRUCTURES RETAINING WALL DESIGN
Commercial Foundations
Balloon Frame North-American invention, 1833
Topic B2 Sub-structure groundworks
Bridge Engineering (5) Substructure – Abutments and Piers
1 Building Types. 2 Building Use and Size Buildings are available in many types and sizes. Large, specialized buildings should be planned and built by.
Frames and Walls Lateral Stability
Chapter 32 Floor Systems and Foundation Support. 2 Links for Chapter 32 Slab Construction Reinforcing Concrete Crawl Spaces.
Copyright © Excavations, Subpart P.
+ Sill and Floor Construction Vocabulary. + Anchor Bolt A threaded rod inserted in masonry construction to anchor the sill plate to the foundation.
BIM Bridge Inspection and Maintenance Technical Standards Branch Class B Bridge Inspection Course Posting and Utilities Technical Standards Branch Class.
4.4 SOIL NAILING SOIL NAILING IS A REINFORCEMENT METHOD TO REINFORCE THE GROUND WITH STEEL BARS OR STEEL BARS IN GROUT FILLED HOLES. IT IS MAINLY USED.
Excavations & Trenching 1 OSHA 1926 Subpart P Bureau of Workers’ Comp PA Training for Health & Safety (PATHS) PPT
BIM Bridge Inspection and Maintenance Technical Standards Branch Class B Bridge Inspection Course Grade Separation Inspection & Ratings Grade Separation.
BIM Bridge Inspection and Maintenance Technical Standards Branch Class B Bridge Inspection Course Culvert Maintenance CULVERT MAINTENANCE.
TRENCHING & EXCAVATION
BEAMS: Beams are structural members that can carry transverse loads which produce bending moments & shear force. Girders: Main load carrying members into.
OSHA Office of Training and Education
Excavation & Trench Safety
Blocking a b c d.
Foundation Failure. Foundation movement may result from a wide range of factors, which can include: Shrinking or swelling of clays caused by changes in.
Typical Bridge Components
Chapter-2 Parts of Steel Bridge. contents Bearings Horizontal and transversal wind bracing Classification of bridges.
Rating Grade Separations
Culvert Maintenance Similar to bridges Structurally different
Introduction Signing for Interchanges Naming Convention
$150K Chicago/ANL seed funding for Braidwood site investigation
Approach Road Inspection and Rating
Building Planning and Drawing
BRIDGE MAINTENANCE.
Grade Separation Inspection and Rating.
Arch205 Materials and building construction 1 foundation
Board of Commissioners Meeting
Structural Drawing Chapter 19.
Arch205 building construction foundation
Course Contents Culverts Bridges Buildings 20 November 2018.
Grade Separation Inspection and Rating.
Grade Separation Inspection and Rating.
Factors to Consider in Foundation Design Chapter # 02
Grade Separation Inspection and Rating.
Post Seismic Bridge Inspection
Post Seismic Bridge Inspection
Presentation transcript:

COPYRIGHT © AREMA 2008 of 421 TUNNELS

COPYRIGHT © AREMA 2008 of 422 General Tunnel Inspections present unique challenges Track Time Sensitive Good lighting source required Various types of Tunnels and –Construction Materials Conditions found may warrant Expert Evaluation of structure

COPYRIGHT © AREMA 2008 of 423 SAFETY Confined / Enclosed Space Fumes from motorized Inspection Vehicle Adequate Lighting Walking Hazards- Wet / Ice Wildlife

COPYRIGHT © AREMA 2008 of 424 External Environment Note areas over & around Portals Vegetation Ground Water Adjacent Slopes Rock Slopes

COPYRIGHT © AREMA 2008 of 425 Internal Environment Natural Gas Pockets / Ground Water Conduits for Utilities / Fiber Optics Cut-Outs for Inspectors Drainage Pumps

COPYRIGHT © AREMA 2008 of 426 Vegetation Adjacent Slopes

COPYRIGHT © AREMA 2008 of 427 Rock Slopes

COPYRIGHT © AREMA 2008 of 428 Portals (Tunnel Inspection) Openings at each end of Tunnel Headwalls / Wingwalls Concrete/Stone/Timber/Natural Rock –Height of Headwall / Wingwalls –Stability / Structural Integrity Lateral movement / water seepage –Note Condition / Deficiency Timber Decay / Concrete Cracks,Deterioration

COPYRIGHT © AREMA 2008 of 429 Headwalls(date)/Wingwalls

COPYRIGHT © AREMA 2008 of 4210 Natural Rock Portal

COPYRIGHT © AREMA 2008 of 4211 Drains in Wall

COPYRIGHT © AREMA 2008 of 4212 Tunnel Shaft Fundamental Tunnel Structure –Detailed Inspection Notes Thru Tunnel –Permanent Stationing Makers Thru Tunnel Various Types of Construction or Combination of Types of Construction -Natural Rock

COPYRIGHT © AREMA 2008 of 4213 Natural Rock

COPYRIGHT © AREMA 2008 of 4214 Natural Rock-Anchor Bolts

COPYRIGHT © AREMA 2008 of 4215 Timber & Steel Sets Timber Posts on Sides of Tunnel with Timber cut at angles to form Arch Timber Mud Sills on Stone or Concrete Spacing of Timber Sets determined by stability of the surrounding material Steel Sets are fabricated similar to the Timber Sets construction with Steel Beams

COPYRIGHT © AREMA 2008 of 4216 Original Construction

COPYRIGHT © AREMA 2008 of 4217 Timber Portal /Shed

COPYRIGHT © AREMA 2008 of 4218 Steel Set / Lagging

COPYRIGHT © AREMA 2008 of 4219 Steel Set / Lagging

COPYRIGHT © AREMA 2008 of 4220 Lagging / Cribbing Lagging-Timber or Steel placed horizontally between Timber or Steel Sets Lagging can fully line the tunnel or support only unstable areas Cribbing/Packing: Material Placed behind Lagging or Liner to fill void between lagging and failed material.

COPYRIGHT © AREMA 2008 of 4221 Cribbing Behind Liner

COPYRIGHT © AREMA 2008 of 4222 Concrete / Masonry Reinforced Concrete Walls / Arch Masonry Walls / Arch ( Brick, Stone)

COPYRIGHT © AREMA 2008 of 4223 Concrete Lined Tunnel

COPYRIGHT © AREMA 2008 of 4224 Brick Lined Tunnel

COPYRIGHT © AREMA 2008 of 4225 Steel Lining Corrugated Steel Ribbed Tunnel Liner Plates

COPYRIGHT © AREMA 2008 of 4226 Tunnel Floor Natural Ground when Tunnel was cut Struts below ballast to each side of Tunnel Reinforced Concrete

COPYRIGHT © AREMA 2008 of 4227 Problems / Conditions Natural / Exposed Material –Cracks, Openings, Movement –New pieces of Rock on floor –Loose Rock Bolts, Anchors

COPYRIGHT © AREMA 2008 of 4228 Material on Tunnel Floor

COPYRIGHT © AREMA 2008 of 4229 Loose Rock Bolts

COPYRIGHT © AREMA 2008 of 4230 Problems / Conditions Timber Sets / Lining –Decay; Sound and/or Drill for voids –Bottom Sill; Bearing Area, Crushing, Bulging –Joints, Gaps, Alignment –Bolts, Drift Pins

COPYRIGHT © AREMA 2008 of 4231 Problems / Conditions Steel Sets / Lining –Benchwall: Anchors, Corrosion –Columns / Struts: Corrosion, Section Loss, Buckling / Alignment –Bulging in Walls / Arch

COPYRIGHT © AREMA 2008 of 4232 Failed Steel Liner

COPYRIGHT © AREMA 2008 of 4233 Problems / Conditions Lagging: Timber, Steel –Decay, Corrosion, Section loss –Openings at Seams / Joints, Bulging –Ground or Failures behind lagging

COPYRIGHT © AREMA 2008 of 4234 Problems / Conditions Concrete / Masonry Lining –New Cracks, Spalling, Bulging –Movement at Construction Joints –Water Seeping, weep holes –Brick / Concrete on floor –Movement, Hinging at Spring Line –Bulging of Walls and Arch –Benchwall / Footer

COPYRIGHT © AREMA 2008 of 4235 Failed Concrete Liner

COPYRIGHT © AREMA 2008 of 4236 Problems / Conditions Tunnel Floor / Roadbed –Track Surface –Muddy / Pumping / Fouled Ballast –Drainage Ditches / Culverts Train Impacts / Clearance –Signs of Impacts –Verify Dimensions- Top/Rail & Centerline Track

COPYRIGHT © AREMA 2008 of 4237 Impact Damage

COPYRIGHT © AREMA 2008 of 4238 Tunnel Inspection Checklist PORTALS –Soil / Rock Stability –Condition of Headwall and Wingwalls –Drainage behind Headwall and Wingwalls –Surface Drainage

COPYRIGHT © AREMA 2008 of 4239 Tunnel Inspection Checklist SHAFT –Clearances-Bulges in Ceilings / Walls –Fractured or Scaling Stone –Condition of Rock Bolts and Anchors –Condition of Timber/ Steel Sets /Lagging

COPYRIGHT © AREMA 2008 of 4240 Tunnel Inspection Checklist SHAFT –Condition of Concrete / Masonry Lining Bulges Cracks Tuckpointing Surface voids

COPYRIGHT © AREMA 2008 of 4241 Tunnel Inspection Checklist SHAFT –Tunnel Floor Debris on floor indicating problems Buckling or heave Fouled Ballast Drainage Water / Ice accumulation

COPYRIGHT © AREMA 2008 of 4242 EMERGENCY If the bridge inspector encounters a tunnel condition that affects the safe operations of trains in, or near the tunnel, contact the railroad dispatcher and responsible authority to stop any trains and arrange for immediate repairs. Criteria for limits of acceptable/tolerable conditions must be provided by the Railroad Owner or their designated engineer based on the principles of acceptable rating contained in the appropriate chapter of the AREMA Manual for Railway Engineering