Type 2 Supercrystal Type 1 Supercrystal

Slides:



Advertisements
Similar presentations
CMS ECAL Annual Review - CERN Sept 2001 R M Brown - RAL 1 Test results from 500 preproduction VPTs R M Brown RAL - UK CERN 19 September 2001.
Advertisements

View from BEHIND backplate Notch View from BEHIND backplate 2x5 and 5x2 partial SCs SC assembly jig views.
PREPOSITIONS OF PLACE WHERE? IN BEHIND ON BETWEEN UNDER NEXT TO
CMS-UK Oversight Committee 17/5/04 D.J.A. Cockerill - RAL 1 The CMS ECAL Endcaps Crystal ECAL Endcap Calorimeter (EE) Preshower EE EE crystals.
CMS-UK Oversight Committee 18/11/03 D.J.A. Cockerill - RAL 1 The CMS ECAL Endcaps Crystal ECAL Endcap Calorimeter (EE) Preshower EE.
Crystals into Alveolar from BACK of assembly jig Face B Face A Interface plate Type 1 (0-TB H) Holes for Housing NOTCH Fibre optic.
Beginning to use the language of position. Four children stand in a row. Children discuss who is at the front/first in the row? Who is behind? Who is.
CMS ECAL Meeting Ecole Polytechnique June 2005 A.B.Lodge - RAL 1 ECAL End Cap CMS ECAL End Cap Trigger Meeting. Meeting held 29 th - 30 th June.
 I would do school face to face because if I have any questions then I can ask the teacher. Also, because I learn more with a person I front of me.
Stave Vacuum Tool Tim WP4 Face to Face Liverpool, 13/11/14.
MER/SUP 1 DOOR EVAPERATOR DRAIN PAN REPLACEMENT 1. Remove the (4) screws that secure the evaporator coil, using a 5/16” socket.
This – that / these – those. This dog is jumping!
Prisms A prism is a solid that is the same shape all the way a long its length.
Hidden lines in orthographic projections
S-band BPM prime Support Hyoung Suk Kim KNU.
ATLAS Pixel Detector February 2003 N. Hartman LBNL 1 Pixel Support Tube PRR: Assembly, Production, Schedule February 2003.
Irish Step Dancing The Jig. Step # 1: POINT Point your RIGHT TOE.
Identification Systems Animal Science 1. Competency 11.0 Differentiate identification systems used in the animal industry.
G.Barber - Imperial College London - EE Workshop March EE Dee Assembly Contents:- Area Manipulator Future Plans.
Automatic Doggy Door Group #34 Final Design Report Mechatronics (MECH 307) Submitted Dec. 7, 2007 Nick Echter, Markus Lutz, Jon Forster, Jeff Belval.
J A Hill – EID RAL 1-2 September EE End Cap Mechanical Design ECAL EE End Cap Engineering CMS-UK Collaboration Meeting Brunel University September.
EE planning meeting Lucie Linssen 1 CERN EE regional centre and Dee assembly plans Dee assembly TA3, not for EE Supercrystal regional centre.
IN PLAY ON UNDER ABOVE BEHIND BETWEEN IN FRONT OF NEXT TO.
New design With fewer parts and easier manufacture degrees 20mm 245.
M-21 Mockup Fold-Flat Mirror Assembly M21-B-2 Robin Lafever LBNL 1 Fabrication and assembly notes.
ECAL – EE Design Status Presentation 19/7/06 D.J.A. Cockerill - RAL 1 EE Design Status D Cockerill CERN 19 July 2006.
Layout for Fixel Readout Board fiber Holder The FRBH module will provide structure to the fiber assembly in the Fixel Readout system. header Pots, two.
CMS ECAL End Cap WACH4, 28 Nov 2002 D Cockerill - RAL (1) - Yield, e/MeV with production crystals and production VPTs - Pre-calibration precision using.
Stave C channel side closeout gluing jig S Yang WP4 monthly meeting at Liverpool University 26 th March 2014.
TYPE I TYPE II TYPE I Front View # 32 TAP DRILL 4 places B TYPE.
HIDE & SEEK Prepositions PLAY.
Dr. Tatjana Hodnik Čadež. PeF 2. 4 Geometry a) The basic principle: ‘from a solid to a point’ A child observe objects in his/her surrounding and compare.
High Voltage Cards & 2000 Electronic/Thermal Model. CMS ECAL End Cap Meeting CERN 19 June to 23 June 2000A.B.Lodge - RAL -1 ECAL End Cap 1 EE End Cap Engineering.
Chocolate Mold Design. Design your desired finished product part.
ECAL Plenary 27/2/07 D.J.A. Cockerill - RAL 1 Status of the CMS ECAL Endcaps ECAL Plenary, 27 Feb 2007 D Cockerill  VPTs  Electronics and Integration.
Prepositions Under On In Next to In Front Behind.
CMS-UK Oversight Committee 17/11/06 D.J.A. Cockerill - RAL 1 The CMS Electromagnetic Calorimeter UK Responsibilities Procurement and testing of VPTs Design.
Progress on Stave assembly tooling Stephanie Yang (Oxford) WP4 meeting at Liverpool University, 13 th November 2014.
HEP2001, Budapest, July 2001 R M Brown - RAL 1 The Vacuum Phototriodes for the CMS Electromagnetic Calorimeter P R Hobson, D C Imrie, O Sharif Brunel University,
Manufacturing I Wind Chime Production. Key Learning: Production of a wind chime will require several steps using a variety of machines and materials.
How to model a plate with 3D Experience?. Creating a part 7 create a contour with PowerCopy: contour motor board relative to the left. 6 create a contour.
European Robotic LABoratory
Hybrid Issues.
Stage Directions Drama 10.
1.8 Panel Assembly process
Report on construction of LP2 spaceframe endplate
PREPOSITIONS OF PLACE WHERE? IN BEHIND ON BETWEEN UNDER NEXT TO
Electronic Game.
Quick link: cern.ch/cmstb04
Orientation of Point in Space
Unit 2 The new Pandora’s Box
GRAAL forward lead-scintillator wall (``Russian Wall”) V
Auxiliary Pump Drive Option Replacement for D0S3002CX03
Dee1 View from back of back plate
Stage Directions Drama 10.
Utah State University - University of Washington - Virginia Tech.
The ball is ___________ the house.
Great! on in in front of under above next to behind between next.

PROGRESS on EE VPTs, Dees D Cockerill
Assembling/Dismanteling Method of the Socket
over in in front of between next to on behind under
STEEL PLATES.
Valve stem “gag” mechanism
Descriptive Words Location
The Palate Parts of the Palate
ISO view of pipe w/ individual EC detector installed
Where’s the pencil?.
AMEQ WINTERIZED ECHELON RIG COMPLETE RIG, TRACK SYSTEM, AND MATS FOR CLUSTER DRILLING IN EXTREME ARCTIC CLIMATES The winterization package allows free.
The Country Outhouse assembly Instruction By Laser Dollhouse Designs
Presentation transcript:

Type 2 Supercrystal Type 1 Supercrystal View from BEHIND backplate Type 2 Supercrystal Type 1 Supercrystal Notch Notch View from BEHIND backplate

Type 1 Supercrystal Type 2 Supercrystal View from FRONT of backplate Type 1 Supercrystal Type 2 Supercrystal Notch Notch View from FRONT of backplate

Crystals into Alveolar from BACK of assembly jig Face B Face A Crystals into Alveolar from BACK of assembly jig

Crystals into Alveolar from BACK of assembly jig Face B Row 1 Face A Crystals into Alveolar from BACK of assembly jig

Crystals into Alveolar from BACK of assembly jig Face B Row 2 Face A Crystals into Alveolar from BACK of assembly jig

Crystals into Alveolar from BACK of assembly jig Face B Row 3 Face A Crystals into Alveolar from BACK of assembly jig

Crystals into Alveolar from BACK of assembly jig Face B Row 4 Face A Crystals into Alveolar from BACK of assembly jig

Crystals into Alveolar from BACK of assembly jig Row 5 Face B Face A Crystals into Alveolar from BACK of assembly jig

A supercrystal viewed from the front during assembly Crystal bar code orientation

Crystals into Alveolar from BACK of assembly jig Interface plate Type 2 (0-TB-0054-249-C) for Dee4 Holes for housings Face B Face A Crystals into Alveolar from BACK of assembly jig