1 Report of the Planning Coordination Committee Report to the WECC Annual Meeting April 20, 2006 Robert Jenkins, PCC Chair.
Advertisements

NTTG Report to TEPPC BiennialTransmission Plan.
Energy Policy Act of 2005 Section 1221 & 368 Update Board Meeting – Los Cabos, Mexico December 7 & 8, 2006.
Report of the Planning Coordination Committee WECC Board Meeting San Diego, CA April, 2009.
2009 Generators that have Achieved Certification Arizona Public Service Company ATCO Electric Ltd. Avista Corporation Basin Electric Power Company Black.
1 ColumbiaGrid Update June 27, Activities Planning OASIS Redispatch 2.
Order 2004 Sensitive 1 WECC Phase 1 Rating Process Coordinated Planning and Technical Studies: PCC Presentation on the Avista Interconnection to the PG&E.
TransWest Express and Gateway South WECC Planning Coordination Committee David Smith, National Grid October 25-26, 2007 Vancouver, B.C.
March 26, 2014 Transmission Coordination and Planning Committee 2014 Q1 Stakeholder Meeting.
Western Interconnection Subregions for PSA Layne Brown Manager, Reliability Assessments.
CREPC Meeting November 5-6, 2007 Snapshot of Major Transmission Proposals and Status of Transmission Planning Presenters: Paul Arnold and Jeff Miller.
David H. Wiggs General Manager Los Angeles Department of Water and Power September 24, 2003.
NTTG Economic Study and Biennial Study Update NTTG Economic Study and Biennial Study Update NTTG Study Cycle.
Montana Energy Summit Transmission Planning Process April 22, 2008.
WECC PCC Meeting Salt Lake City, UT July 16, 2014.
NWPP MC Initiative WECC Update March 25th, 2015 Kathy Anderson
Temperature at the western boundary (T west ) required at each time-step Timestep 1: T west = 0 o C Timestep 2: T west = -1 o C Timestep 3: T west = -2.
Finding Your Way in the World
Montana Ambassadors Helena, Montana February 25, 2011.
Energy Gateway Gateway West Project Gateway South Project
Keegan Moyer Manager, Transmission Expansion Planning WECC Response to DOE Quadrennial Energy Review June 19, 2014 San Francisco, CA.
PJM© PJM Confidential PJM Generation Interconnection Overview Virginia Offshore Wind Conference Virginia Beach June 22, 2011 Paul McGlynn General.
Northern California to Pacific Northwest/Canada Transmission Line Steve Metague, PG&E February 29, 2008.
Approach to the Wind Resource Assessment for the Sixth Power Plan Northwest Power & Conservation Council Generating Resources Advisory Committee August.
READ 91-D P. Wall. A. TYPES of Maps B. ELEMENTS of Maps C. LOCATION on Maps.
Successful Transmission Planning & Development in the West Kelly Barr Manager, Regulatory Affairs & Contracts Salt River Project Phoenix, Arizona June.
1 Wind Integration Study Team (WIST) Report to the Northwest Wind Integration Forum Steering Committee January 6, 2010 Jeff Miller - ColumbiaGrid Rich.
Rocky Mountain Power Five Year Study Kick Off Meeting.
Review Map Test. Latitude measures North and South. The equator is a line of latitude.
CWAG ENERGY CONFERENCE BIG SKY, MT Collaborative Efforts to Find Solutions: A Case Study – The Mountain States Transmission Intertie (MSTI) Presented by.
Finding locations on the Earth. Latitude (parallels) imaginary lines drawn around the earth parallel to the equator definition – the distance north or.
Transmission Owner Sector Organization of PJM States, Inc. October 8, 2013.
1 Wind Integration Study Team (WIST) Report to the Northwest Wind Integration Forum Technical Work Group October 29, 2009 Jeff Miller - ColumbiaGrid Rich.
© 2000 PACIFICORP kV LINE WALLA WALLA – WALLULA – Mc NARY 500 kV LINE HEMINGWAY – CAPTAIN JACK – REGIONAL PLANNING MEETING REGIONAL PLANNING PROJECT.
Map Coordinates Review. Equator A line that divides the planet into northern and southern hemispheres Has a measure of 0 degrees of Latitude.
BC Coordinated Planning Group Development of BCCPG Charter Steering Committee Meeting – Conference Call Friday, May 27, – 2:30pm.
Transmission Capital Project Updates. Transmission Expansion Plan Sigurd to Red Butte 345 kV line in-service May, 2015 Permitting activities continue.
FERC Order 1000 Drafting team activated April Filing Interregional Coordination Transmission Planning Regions CAISO, Columbia Grid, NTTG, WestConnect Interregional.
Sectionalism Map Assignment
Map Test Review 3 rd Grade Social Studies. A. Political B. Physical C. General This is an example of a ______________ map.
MAP-SKILLS STUDY GUIDE 1. Hemisphere- Half of a sphere. There are four hemispheres in the world. The northern, southern, western and eastern. 2. Degrees-
Renewable Energy Transmission Initiative 2.0 Plenary Group Meeting April 18, 2016 Sacramento, CA Thomas Carr Western Interstate Energy Board TEPPC’s Resource.
USA Questions. What is the capital city of the USA?
Regional Transmission Expansion Project Staff Council Briefing Tom Kaiserski (MT) Program Manager February 15, 2011 Governor’s Office of Economic Development.
Questions for the Panel 1. Permitting & Siting Issues 2.
Northern Tier Transmission Group Report to Columbia Grid Planning Committee February 9, 2012 “To ensure efficient, effective, coordinated use & expansion.
Study Plan Development & Approach May 5, 2010 Conference Call & Webinar “To ensure efficient, effective, coordinated use & expansion of the members’
FASOM and Agricultural Regions
Latitude and Longitude
Transmission Planning Update October 20, 2010
Idaho Power 2017 Integrated Resource Plan
Trends in Generation Dispatch
Hemispheres, Latitude & Longitude
Latitude and Longitude
Social Studies Skills Matrix
Jeopardy Hosted by Miss Bloser.
U.S. Mountain Range Quiz U.S Mountain Ranges 3. What is this called?
ColumbiaGrid Planning Meeting FERC Order 1000 Activities June 7, 2018
Hemispheres.
2026 CCTA Criteria Filter Results
Hemispheres.
Hemispheres.
Clair Moeller Mid-Continent ISO
Map Components Title Grid Compass Rose Key or Legend Scale.
CCTA Process Review TAS Update – Feb 12th 2016
2026 CCTA Criteria Filter Results
RPCG – 2026 CCTA Results and Next Steps
Idaho Power Transmission System
PacifiCorp Overview Choose from three different title slide designs by selecting “New Slide.” These slides are suitable for business and community presentations.
Imaginary Lines on a Map
Presentation transcript:

Planning Committee- Map Data for the Biennial Planning Process Indicate Map ID for each Load, Resource, or Transmission Line (Also a map of proposed transmission project is included for your reference) “To ensure efficient, effective, coordinated use & expansion of the member’s transmission systems in the Western Interconnection to best meet the needs of customers & stakeholders. “

2

3 Mountain States Intertie Hemingway-Boardman Gateway West NorthWestern Energy Black Hills Hemingway-Boardman Idaho Power Hemingway-Captain Jack PacifiCorp Gateway West PacifiCorp Idaho Power SWIP North LS Power Hyperlinks: NTTG.biz Gateway South PacifiCorp National Grid Arizona Public Service Northern Lights (DC Projects) TransCanada 3