11 March 2012 Holger Witte Brookhaven National Laboratory Advanced Accelerator Group A Dipole (without) Grain Oriented Steel.

Slides:



Advertisements
Similar presentations
1 Radio Maria World. 2 Postazioni Transmitter locations.
Advertisements

EcoTherm Plus WGB-K 20 E 4,5 – 20 kW.
Números.
Trend for Precision Soil Testing % Zone or Grid Samples Tested compared to Total Samples.
Trend for Precision Soil Testing % Zone or Grid Samples Tested compared to Total Samples.
BellRigner – 1/30/2012 Match the graph to the function: f(x) = x 3 – 2x + 2 g(x) = -2x h(x) = x 4 – 2 i(x) = -x 3 – 1 A B C D.
AGVISE Laboratories %Zone or Grid Samples – Northwood laboratory
Trend for Precision Soil Testing % Zone or Grid Samples Tested compared to Total Samples.
Two Special Right Triangles
/ /17 32/ / /
Reflection nurulquran.com.
1
EuroCondens SGB E.
Worksheets.
RWTÜV Fahrzeug Gmbh, Institute for Vehicle TechnologyTÜV Mitte Group 1 GRB Working Group Acceleration Pattern Results of pass-by noise measurements carried.
Multiplication X 1 1 x 1 = 1 2 x 1 = 2 3 x 1 = 3 4 x 1 = 4 5 x 1 = 5 6 x 1 = 6 7 x 1 = 7 8 x 1 = 8 9 x 1 = 9 10 x 1 = x 1 = x 1 = 12 X 2 1.
Division ÷ 1 1 ÷ 1 = 1 2 ÷ 1 = 2 3 ÷ 1 = 3 4 ÷ 1 = 4 5 ÷ 1 = 5 6 ÷ 1 = 6 7 ÷ 1 = 7 8 ÷ 1 = 8 9 ÷ 1 = 9 10 ÷ 1 = ÷ 1 = ÷ 1 = 12 ÷ 2 2 ÷ 2 =
Stuart Kerachsky Acting Commissioner National Center for Education Statistics October 14, 2009 EMBARGOED until October 14, :00 a.m. E.D.T.
GEANT Simulation of RCS Vahe Mamyan Hall A Analysis Workshop December 10, 2003.
1 When you see… Find the zeros You think…. 2 To find the zeros...
International Telecommunication Union September 2010 WRC-12 PREPARATIONS MID Regional Planning Seminar 19/20 September 2010 W. Frank Radiocommunication.
CALENDAR.
1 1  1 =.
Summative Math Test Algebra (28%) Geometry (29%)
ASCII stands for American Standard Code for Information Interchange
The 5S numbers game..
A Fractional Order (Proportional and Derivative) Motion Controller Design for A Class of Second-order Systems Center for Self-Organizing Intelligent.
7/19/2002 Kenneth John Webb Page 1 COMPARING EMISSION MEASUREMENTS IN A REVERBERATION CHAMBER AND A SEMI-ANECHOIC CHAMBER By Kenneth John Webb Principal.
EE, NCKU Tien-Hao Chang (Darby Chang)
Update on ILC ML Lattice Design Alexander Valishev, for the FNAL LET group FNAL AP Dept. Meeting March 7, 2007.
PP Test Review Sections 6-1 to 6-6
Level story Level story Level story Level story Level story Level story Level story 8.
MM4A6c: Apply the law of sines and the law of cosines.
Look at This PowerPoint for help on you times tables
Karnaugh Map Adjacent Squares
Karnaugh Map Adjacent Squares
Copyright 2012 CFT GAS/1 Gas Management. Copyright 2012 CFT GAS/2 Introduction Recap – Advanced Nitrox Manual calculation prone to error Planning software.
TCCI Barometer March “Establishing a reliable tool for monitoring the financial, business and social activity in the Prefecture of Thessaloniki”
Abstract Calculations of Harmonics of Quadrupole Magnets Rybitskaya Tatyana, Budker Institute of Nuclear Physics, Russia Design of pole profile and chamfers.
Possible Injection Scheme in the (80 km) TOE: Tunnel Of Everything Lucio Rossi, Attilio Milanese and Davide Tommasini CERN Work of H. Piekarz (FNAL) widely.
Copyright © 2012, Elsevier Inc. All rights Reserved. 1 Chapter 7 Modeling Structure with Blocks.
Progressive Aerobic Cardiovascular Endurance Run
1 J-PARC and T2K 1.Accelerator construction status and commissioning 2.Accelerator upgrade plan in first 5 years 3.Experiments with slow extracted beam.
1 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt Synthetic.
TCCI Barometer September “Establishing a reliable tool for monitoring the financial, business and social activity in the Prefecture of Thessaloniki”
Before Between After.
Subtraction: Adding UP
Introduction to the LHCb masterclass exercise
Static Equilibrium; Elasticity and Fracture
ANALYTICAL GEOMETRY ONE MARK QUESTIONS PREPARED BY:
Resistência dos Materiais, 5ª ed.
Lial/Hungerford/Holcomb/Mullins: Mathematics with Applications 11e Finite Mathematics with Applications 11e Copyright ©2015 Pearson Education, Inc. All.
Chapter 13: Digital Control Systems 1 ©2000, John Wiley & Sons, Inc. Nise/Control Systems Engineering, 3/e Chapter 13 Digital Control Systems.
Overview of ERL R&D Towards Coherent X-ray Source, March 6, 2012 CLASSE Cornell University CHESS & ERL 1 Cornell Laboratory for Accelerator-based ScienceS.
A Data Warehouse Mining Tool Stephen Turner Chris Frala
1 Dr. Scott Schaefer Least Squares Curves, Rational Representations, Splines and Continuity.
130 May 2012 Holger Witte Brookhaven National Laboratory Advanced Accelerator Group Dipole for Fast Ramping Synchrotron Test Magnet.
A.KOVALENKO SUPERCONDUCTING MAGNETS for NICA BOOSTER & COLLIDER NICA ROUND TABLE DISCUSSION - 3 JINR, Dubna, November 05, 2008.
Method of beam extraction from a synchrotron by the instrumentality of multilayer Cu-Fe shield Bondarenko Alexey.
11 December 2011 Holger Witte Brookhaven National Laboratory Advanced Accelerator Group A Dipole with Grain Oriented Steel.
Energy calibration at LHC J. Wenninger. Motivation In general there is not much interest for accurate knowledge of the momentum in hadron machines. 
125 November 2013 Holger Witte Brookhaven National Laboratory Advanced Accelerator Group Steel Procurement.
116 May 2012 Holger Witte Brookhaven National Laboratory Advanced Accelerator Group Dipole for Fast Ramping Synchrotron.
Hybrid Synchrotron Arc: 2 Dipoles per Half Cell J. Scott Berg Advanced Accelerator Group Meeting 28 July 2011.
Hybrid Fast-Ramping Synchrotron to 750 GeV/c J. Scott Berg Brookhaven National Laboratory MAP Collaboration Meeting March 5, 2012.
Some Design Considerations and R &D of CEPCB Dipole Magnet
Magnets for the ESRF upgrade phase II
Presentation transcript:

11 March 2012 Holger Witte Brookhaven National Laboratory Advanced Accelerator Group A Dipole (without) Grain Oriented Steel

21 March 2012 Suggestion for a new dipole design Materials Simulation results –achievable fields –field quality Power loss Overview

31 March 2012 Chosen to minimize magnetization losses –low coercivity –high saturation field –(in direction of grains) Challenges –measuring material properties –1D material – not very forgiving in terms of geometrical errors / material inhomogeneities –change of material properties over time / radiation exposure –Simulations – convergence problems Proposal: use different materials –FeCo (Hiperco 50A) –6.5% silicon steel (JFE SuperCore) Grain Oriented Steel

41 March 2012 BH Curves Isotropic FeCo: saturates at higher B 6.5SiFe: developed for f>50Hz Limits: 1.1/2.1T (GO Steel: 1.75T) FeCo 6.5SiFe GO Fe

51 March 2012 New Dipole Design Combine both to benefit from respective advantages –Design yoke so that field around T –Center yoke: FeCo Geometry: Don Summers EI yoke (first magnet) Opera 3D Looked at tapered and non-tapered designs 6.5Si SteelFeCo

61 March 2012 Geometry 22 mm 110 mm 100 mm

71 March 2012 Magnetization

81 March 2012 From D. Summers: Fast Ramping 750 GeV Muon Synchrotron Dipoles Peak Field d

91 March 2012 Field Quality Evaluate vertical magnetic field on centre plane (y=0) –from -18 to 18 mm Fit polynom to field: Plot polynomial coefficients as function of peak magnetic field in centre 45 mm

101 March 2012 Forbidden Multipoles

111 March 2012 Sextupole

121 March 2012 Sextupole

131 March 2012 Decapole

141 March 2012 JFE Super Core (0.1 mm sheet) about 10W/kg

151 March 2012 Hiperco 50A About 20W/lb (44W/kg)

161 March 2012 FeCo (1 m long magnet) –average field 1.7T –mass: 45 kg –power loss: 2kW/m 6.5SiFe –average field: 1T –mass: 235 kg –power loss: 2.35 kW/m Assumes 400 Hz Test Magnet

171 March 2012 Epstein frame test –JFE will provide samples for free (cut to size) –Hiperco 50A: identified supplier and company for cutting/annealing, waiting for quotation If successful: test magnet, geometry close to Dons 2 nd magnet (later on: more life size model?) Magnet design for RCS ring? Things to do

181 March 2012 FeCo + 6.5SiFe seems to be good combination –higher field than GO steel –better field quality? Conceptual design of test magnet Material tests Summary