7 - Manufacturing Resource Planning Dr. Ron Tibben-Lembke pp. 222-234, 236-7, 240.

Slides:



Advertisements
Similar presentations
Material Requirements Planning
Advertisements

Ch. 6 Master Production Scheduling
To Accompany Ritzman & Krajewski Foundations of Operations Management, © 2003 Prentice Hall, Inc. All rights reserved. Chapter 15 Resource Planning.
12 – MRP and ERP Dr. Ron Lembke.
6. Material Requirements Planning (MRP)
© The McGraw-Hill Companies, Inc., Chapter 15 Materials Requirements Planning.
7 - Manufacturing Resource Planning Dr. Ron Tibben-Lembke pp , 236-7, 240.
Material Requirements Planning and Enterprise Resource Planning Dr. Ron Lembke.
DOM 301 : Operations Management Practice
MRP, MRP II, and ERP.
Chair Seat Legs (2) Cross bar Side Rails (2) Cross bar Back Supports (3) Leg Assembly Back Assembly Level Product Structure Tree.
1 1 Slide © 2001 South-Western College Publishing/Thomson Learning Anderson Sweeney Williams Anderson Sweeney Williams Slides Prepared by JOHN LOUCKS QUANTITATIVE.
© 2004 by Prentice Hall, Inc. Upper Saddle River, N.J Operations Management Material Requirements Planning (MRP) & ERP Chapter 14.
Managing Business Processes: Demand Management Cheng Li, Ph.D. California State University, Los Angeles January 2002.
Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin Manufacturing Planning and Control MPC 6 th Edition Chapter.
13-1MRP and ERP. 13-2MRP and ERP  Material requirements planning (MRP): Computer-based information system that translates master schedule requirements.
Session 10 Material Requirements Planning pom
1 Slides used in class may be different from slides in student pack Chapter 16 Materials Requirements Planning  Material Requirements Planning (MRP) 
Murat Kaya, Sabancı Üniversitesi 1 MS 401 Production and Service Systems Operations Spring Material Requirements Planning (MRP) Slide Set #10.
Material Requirements Planning
1 Materials Requirements Planning. 2 Material Requirements Planning Defined Materials requirements planning (MRP) is a means for determining the number.
Irwin/McGraw-Hill © The McGraw-Hill Companies, Inc., 1998 Material Requirements Planning (MRP) Chapter 15 11/7/05 Overview Position of MRP in Operation.
MRP and ERP McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
What is “Operations Management”? (and why should you care?) Dr. Ron Lembke, Ph.D. University of Nevada, Reno.
© The McGraw-Hill Companies, Inc., Master scheduling Material requirements planning Order scheduling Weekly workforce and customer scheduling Daily.
BA7201: Operations Management Assignment - II Q1: Compute the Net Requirement and timing of production for each component Q2: Draw up the projected available.
Aggregate Planning and Resource Planning Chapters 13 and 14.
Master Production Scheduling
MRP Model.
15 – 1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall. Resource Planning 15 For Operations Management, 9e by Krajewski/Ritzman/Malhotra.
Introduction to Materials Management Chapter 4 – Material Requirements Planning.
Production Planning and Control
Resource Planning Chapter 15.
Materials Requirements Planning
Operations Fall 2015 Bruce Duggan Providence University College.
Manufacturing Systems Engineering
© The McGraw-Hill Companies, Inc., Chapter 15 Materials Requirements Planning.
11-1  Material requirements planning (MRP): Computer-based information system that translates master schedule requirements for end items into time-phased.
1 The MRP Heuristic  MRP stands for Materials Requirement Planning  It is a widely used approach for production planning and scheduling in industry 
MATERIALS REQUIREMENT PLANNING (MRP) MRP IS A SYSTEM OF PLANNING AND SCHEDULING THE TIME- PHASED MATERIALS REQUIREMENT FOR PRODUCTION OPERATIONS. PROACTIVE.
CHAPTER-14 MRP AND ERP MD. TAZIDUL ISLAM. 2  Material Requirement Planning (MRP) is the concept of designing and developing information system to aid.
1 © 2006 The McGraw-Hill Companies, Inc., All Rights Reserved Chapter 16 Materials Requirements Planning.
Material Requirements Planning
11- Aggregate and Material Requirements Planning Dr. Ron Lembke.
1. Enterprise Resource Planning Enterprise Resource Planning Systems is a computer system that integrates application programs in accounting, sales, manufacturing,
Chapter 13 MRP: Material Requirement Planning ERP: Enterprise Resource Planning.
Chapter 13 MRP and ERP.
SISTEM INFORMASI ENTERPRISE
LESSON 5 Introduction to Materials Requirements Planning (MRP)
MRP and ERP Chapter 14 Dr. H. Kemal İlter, BE, MBA, DBA
11- Aggregate and Material Requirements Planning
Facility Inventory Old Facilities Modern Facilities Classroom Size
Materials Requirements Planning
Lecture 34 MRP and ERP Operations Management, Eighth Edition, by William J. Stevenson Copyright © 2005 by The McGraw-Hill Companies, Inc. All rights reserved.
What is “Operations Management”? (and why should you care?)
Chapter 16 Materials Requirements Planning
Material Requirements Planning and Enterprise Resource Planning
MRP and ERP.
CHAPTER 14 MRP and ERP.
MATERIAL Requirements planning MRP
Random Demand: Fixed Order Quantity
11- Aggregate and Material Requirements Planning
Material Requirement Planning (MRP)
MRP and ERP.
Material Requirement Planning (MRP)
MRP Introduction EXAMPLES
Setting the right stock levels
HOMEWORK ASSIGNMENT— MRP PROBLEMS
HOMEWORK ASSIGNMENT— MRP PROBLEMS
Chapter 14 Dependent Demand
Presentation transcript:

7 - Manufacturing Resource Planning Dr. Ron Tibben-Lembke pp , 236-7, 240

How do we account for LT? System for organizing WIP releases Consider LT for each item Look at BOM to see what parts needed Release so they will arrive just as needed Example Figure 7.2 Order quantity is 50 units LT is one week Ive added Net requirements and scheduled releases rows to Figure for clarity

Fig units short

Fig 7.2 Order 50 units week earlier

Fig 7.2 Ending inventory

Terminology Projected Available balance Not on-hand (that may be greater) Tells how many will be available (in ATP sense) Planned order releases scheduled receipts Only when material has been committed to their production Move to scheduled receipts as late as possible Preserves flexibility

Figure Snow Shovel 1605 Snow Shovel 048 Scoop-shaft connector Top Handle Assy 314 scoop assembly 118 Shaft (wood) 062 Nail (4) Rivet (4)

314 scoop assembly Rivet (6) 019 Blade (steel) 2142 Scoop (aluminum)

13122 Top Handle Assembly 1118 Top handle Coupling (steel) Welded Top handle bracket Assembly Top Handle Assembly 457 Top handle (wood) 129 Top Handle Bracket (steel) 082 Nail (2)

BOM Explosion Process of translating net requirements into components part requirements Take into account existing inventories Consider also scheduled receipts

BOM Explosion Example Need to make 100 shovels We are responsible for handle assemblies.

13122 Top Handle Assembly 1118 Top handle Coupling (steel) Welded Top handle bracket Assembly Top Handle Assembly 457 Top handle (wood) 129 Top Handle Bracket (steel) 082 Nail (2)

Net Requirements SchGrossNet Part DescriptionInvRecReqReq Top handle assy Top handle2225 Nail (2 required)450 Bracket Assy27-- Top bracket15-- Top coupling3915

Figure 7.5 SchGrossNet Part DescriptionInvRecReqReq Top handle assy Top handle Nail (2 required) Bracket Assy Top bracket15-- Top coupling3915

13122 Top Handle Assembly 1118 Top handle Coupling (steel) Welded Top handle bracket Assembly Top Handle Assembly 457 Top handle (wood) 129 Top Handle Bracket (steel) 082 Nail (2)

Figure 7.5 SchGrossNet Part DescriptionInvRecReqReq Top handle assy Top handle Nail (2 required) Bracket Assy Top bracket Top coupling

Timing of Production This tells us how many of each we need Doesnt tell when to start Start as soon as possible? Dependent events (oh no, not that!) (We ignore statistical fluctuations) Front schedule Cutting approach (Fig. 7.6) p. 231 Back schedule Fig. 7.7 p.232

Fig 7.8 – Top Handle Assy p. 233

Fig 7.8 – Top Handle Assy -2

13122 Top Handle Assembly 1118 Top handle Coupling (steel) Welded Top handle bracket Assembly Top Handle Assembly 457 Top handle (wood) 129 Top Handle Bracket (steel) 082 Nail (2) X

457 Top Handle One handle for Each assembly

457 Top Handle

13122 Top Handle Assembly 1118 Top handle Coupling (steel) Welded Top handle bracket Assembly Top Handle Assembly 457 Top handle (wood) 129 Top Handle Bracket (steel) 082 Nail (2) X

13122 Top Handle Assembly 1118 Top handle Coupling (steel) Welded Top handle bracket Assembly Top Handle Assembly 457 Top handle (wood) 129 Top Handle Bracket (steel) 082 Nail (2) X X

082 Nail (2 required) Two nails for Each assembly

082 Nail (2 required)

13122 Top Handle Assembly 1118 Top handle Coupling (steel) Welded Top handle bracket Assembly Top Handle Assembly 457 Top handle (wood) 129 Top Handle Bracket (steel) 082 Nail (2) X X X

11495 Bracket Assembly One bracket for Each assembly

11495 Bracket Assembly One bracket for Each assembly

11495 Bracket Assembly One bracket for Each assembly

11495 Bracket Assembly

13122 Top Handle Assembly 1118 Top handle Coupling (steel) Welded Top handle bracket Assembly Top Handle Assembly 457 Top handle (wood) 129 Top Handle Bracket (steel) 082 Nail (2) X X X X

129 Top Bracket

129 Top handle bracket

13122 Top Handle Assembly 1118 Top handle Coupling (steel) Welded Top handle bracket Assembly Top Handle Assembly 457 Top handle (wood) 129 Top Handle Bracket (steel) 082 Nail (2) X X X X X

1118 Top handle coupling

Other considerations Safety stock if uncertainty in demand or supply quantity Dont let available go down to 0 Safety LT if uncertainty in arrival time of supply Place order earlier than necessary Order quantities EOQ, Lot-For-Lot, Periodic Order quantity, more to come in ch. 14

Homework DQ: 3, 7 Problems: 3,5,6,7