4/1/2017 3:01 AM FHWA Status Report - AASHTOWare Bridge Design/Rating User Group Meeting Virginia Beach, VA August 6-7, 2013 Thomas Saad, P.E. Senior.

Slides:



Advertisements
Similar presentations
Basic Principles of GMP
Advertisements

1 ROAD WEATHER RESOURCE IDENTIFICATION(RWRI)TOOL Version 1.0 Ray Murphy, ITS Specialist FHWA National Resource Center NTOC - Talking Operations Seminar.
FHWA Qualification Requirements for Laboratories NACLA Forum February 11, 2009 Mike Rafalowski Materials Engineer Office of Pavement Technology Federal.
COUNTER Update Peter Shepherd Project Director COUNTER STM Innovations Seminar, 2 December 2005.
2 Session Objectives Increase participant understanding of effective financial monitoring based upon risk assessments of sub-grantees Increase participant.
Quality Education Investment Act of 2006 (QEIA) 1 Quality Education Investment Act (QEIA) of 2006 County Superintendents Oversight and Technical Assistance.
The Managing Authority –Keystone of the Control System
Module N° 6 – SMS regulation
Program Goals, Objectives and Performance Indicators A guide for grant and program development 3/2/2014 | Illinois Criminal Justice Information Authority.
March 25, Quality Assurance Overview. March 25, Quality Assurance System Overview FY 04/05- new Quality Assurance tools implemented, taking.
BRIDGE INSPECTION House Transportation Finance November 12, 2008 Dan Dorgan State Bridge Engineer Duane Hill Assistant District Engineer Duluth.
September – October, 2012 Maryann Donie
Construction Inspection Certification Program (CICP) Devin Townsend, P.E.
Webinar: June 6, :00am – 11:30am EDT The Community Eligibility Option.
Site Safety Plans PFN ME 35B.
1 Implementing Internet Web Sites in Counseling and Career Development James P. Sampson, Jr. Florida State University Copyright 2003 by James P. Sampson,
1 According to PETROSAFE safety policy, the company is keen that: Introduction All Egyptian Petroleum companies and foreign companies working in A.R.E.
Overview of Moving Ahead for Progress in the 21 st Century (MAP-21) Safety Requirements National Webinar February 28, 2013.
1 Incorporating Extreme Weather Risks in Asset Management Planning Lynn Clarkowski.
Transition from the Long Shutdown to Hot Checkout: Pre-Hot Checkout Steve Suhring Operability Manager 6/6/13.
TOM TORLAKSON State Superintendent of Public Instruction E-Rate Training for California Tech Plan Approvers Doris Stephen California Department.
Traffic Analysis Toolbox & Highway Capacity Manual Transition
EMS Checklist (ISO model)
Management Plans: A Roadmap to Successful Implementation
A-16 Portfolio Management Implementation Plan Update
Managing Government Records Directive ACERA Meeting November 6, 2012 Don Rosen Director of Policy, Analysis and Enforcement Office of the Chief Records.
Standards for Training Packages. Outline Outline of the development of the Standards Framework Transition timelines Overview of the Standards Framework.
VOORBLAD.
Determining the Significant Aspects
1 Vince Galotti Chief/ATMICAO 27 March 2007 REGULATING THROUGH SAFETY PERFORMANCE TARGETS.
SCOH Technical Meeting October 18,  Why the new approach?  Risk-based Project Involvement  Required Project Actions  Compliance Assessment Program.
1 Welcome to the CLU-IN Internet Seminar OSC Readiness Presents...QA for OSCs Sponsored by: EPA Office of Superfund Remediation and Technology Innovation.
Tennessee Department of Transportation ITS Mobility and Operations Summit Performance Measures November 18 – 19, 2009.
Resident Assistant Recruitment and Selection Process (Presentation Pt 2)
1 Phase III: Planning Action Developing Improvement Plans.
Weekly Attendance by Class w/e 6 th September 2013.
MDOT Load Rating Local Agency Workshop Training Bradley M. Wagner, PE Load Rating Program Manager.
 Full title: Moving Ahead for Progress in the 21st Century  Enacted July 2012  Authorized $118 billion  Expires September 30,
Update - Subcommittee on Bridges and Structures Kelley Rehm, PE July 2011.
Bridge Preservation Update Wade F. Casey, P.E. Bridge Management Engineer Federal Highway Administration AASHTO SCOM Meeting Louisville, KY July 20, 2011.
MAP-21 Performance Management Framework August 8, 2013 Sherry Riklin Bob Tuccillo Angela Dluger The Moving Ahead for Progress in the 21st Century Act (MAP-21)
MEPDG Overview & National Perspective CRSI Expert Task Group Meeting July 29, 2008 Gary Crawford Federal Highway Administration Office of Pavement Technology.
Bridges & Culverts Usage Codes and Validation Annual FIMS Comprehensive Training March 27, 2014.
TURNER-FAIRBANK HIGHWAY RESEARCH CENTER NDE Research Ongoing Projects and Response Based Load Rating The Office of Research, Development, and Technology.
FHWA Update for the Virtis Opis User Group Meeting Thomas Saad, P. E. FHWA Resource Center Phone:
National Bridge Inspection Standards (NBIS)
Impacts of “MAP-21”on the National Bridge Inspection Program Tribal Government Coordination Meeting Date August 7, 2014 Presented by: Gary Moss, P.E. Acting.
Thomas Saad, P.E. Senior Structural Engineer Federal Highway Administration Phone: (708)
Title Subtitle Meeting Date Office of Transportation Performance Management MAP-21 Moving Ahead for Progress in the 21 st Century Performance Management.
Community Services Block Grant (CSBG) Program Federal Monitoring Update James Gray Program Specialist.
PAVEMENT MANAGEMENT SYSTEMS OVERVIEW Lecture 2. n Provide a historical perspective of the evolution of PMS over the last 20 years n Describe the basic.
FHWA Update 2011 VOBug Meeting Helena, MT Thomas Saad, P. E. FHWA Resource Center Phone:
Office of Highway Safety Bridge Inspections Dan Walsh.
Value Engineering at FHWA
Overview of the Bridge Evaluation Quality Assurance Scan American Association of State Highway and Transportation Officials Federal Highway Administration.
May 15-16, 2012 Orange Beach, AL James F Boyer, P.E. Assistant State County Transportation Engineer - Maintenance.
Updating the Guidelines for the Seismic Design of Highway Bridges Status update for the Mid-America Ground Motion Workshop February 2003.
NBIS – National Bridge Inspection Standards National standards for the proper safety inspection and evaluation of all hwy bridges NBI – National Bridge.
Title Subtitle Meeting Date Office of Transportation Performance Management MAP-21 Moving Ahead for Progress in the 21 st Century Performance Measure Update.
A SSET M ANAGEMENT Northeast Bridge Management Peer Exchange (BMPE) April 26, 2011 Manchester, NH Bridge Management Questionnaire Report Wade F. Casey,
1 Federal Highway Administration, USDOT The Final Rule on Work Zone Safety and Mobility Updates to 23 CFR Section 630, Subpart J Presented by Tracy Scriba,
Overview of the “Recommended LRFD Seismic Design Specifications for Highway Bridges” Ian M. Friedland, P.E. Bridge Technology Engineer Federal Highway.
PRJ566 Project Planning & Management Software Architecture.
Putting Together a Safety Program Kevin J. Haas, P.E.—Traffic Investigations Engineer Oregon Department of Transportation Traffic—Roadway Section (Salem,
Title Subtitle Meeting Date Office of Transportation Performance Management MAP-21 Moving Ahead for Progress in the 21st Century An Update on Implementation.
PROJECT DELIVERY TEAM Design, ITS and ADHS Construction, Maintenance and Asset Management Team Leader, Pavement and Materials Safety, Emergency Relief.
Office of Nuclear Materials Safety and Safeguards
Presentation transcript:

4/1/2017 3:01 AM FHWA Status Report - AASHTOWare Bridge Design/Rating User Group Meeting Virginia Beach, VA August 6-7, 2013 Thomas Saad, P.E. Senior Structural Engineer Federal Highway Administration Phone: (708)283-3521 © 2007 Microsoft Corporation. All rights reserved. Microsoft, Windows, Windows Vista and other product names are or may be registered trademarks and/or trademarks in the U.S. and/or other countries. The information herein is for informational purposes only and represents the current view of Microsoft Corporation as of the date of this presentation. Because Microsoft must respond to changing market conditions, it should not be interpreted to be a commitment on the part of Microsoft, and Microsoft cannot guarantee the accuracy of any information provided after the date of this presentation. MICROSOFT MAKES NO WARRANTIES, EXPRESS, IMPLIED OR STATUTORY, AS TO THE INFORMATION IN THIS PRESENTATION.

Outline Design and Analysis Tools Research LRFR Implementation Webinars New FHWA Design Manuals and Design Examples Design and Analysis Training Research Long-Term Bridge Performance Program (LTBPP) Policy and Regulatory Issues NBIS Update NBI Coding Guide Update NTIS Etc…

FHWA LRFR Webinar Series Topic No. 1: Implementation of the Load and Resistance Factor Rating Method, October 5, 2011 Topic No. 2: LRFD/LRFR Design and Load Rating of Culverts, November 17, 2011 Topic No. 3: LRFR Load Rating of Segmental Concrete Bridges, January 19, 2012 Topic No. 4: State-Specific LRFR Load Rating Guidelines, April 19, 2012

FHWA LRFR Webinar Series Topic No. 5: Application of Load Testing in Bridge Load Rating (1), September 20, 2012 Topic No. 6: Application of Load Testing in Bridge Load Rating (2), December 6, 2012 Topic No. 7: Application of Computer Software in Bridge Load Rating (1), February 28, 2013 Topic No. 8: Application of Computer Software in Bridge Load Rating (2), April 25, 2013 Recordings: http://www.fhwa.dot.gov/bridge/lrfd/

LRFR Webinar No. 9: Load Rating of Steel Truss Bridges (1) September 12, 1:00 – 3:30 pm EDT Focus on evaluation of gusset plates New gusset design/analysis provisions Gusset plate load rating methods case study Evaluating deteriorated gusset plates Lubin.gao@dot.gov

Other FHWA Design and Analysis Tools www.fhwa.dot.gov/bridge Steel Bridge Design Handbook – Available Fatigue Repair and Retrofit Manual - Available Refined Analysis Manual – early 2014 PT Box Girder Design Manual – early 2014 FHWA PT Installation and Grouting Manual – release expected very soon Manual on Engineering Stability in Construction of Bridge Superstructures – early 2014

FHWA/NHI Bridge Design and Analysis Courses (www.nhi.fhwa.dot.gov) NHI Course 130081: LRFD for Bridge Superstructures NHI Course 132082: LRFD for Bridge Substructures and ERS NHI Course 130092: LRFR for Highway Bridges NHI Course 130093: LRFD Seismic Analysis and Design of Bridges NHI Course 130094: LRFD Seismic Analysis and Design of Tunnels, Walls and other Geotechnical Features NHI Course 130095: LRFD: Design and Analysis of Skewed and Horizontally Curved Steel Bridges

FHWA Seismic Retrofit Seminar 1 ½ day seminar (9 PDH) Overview of FHWA Seismic Retrofit Manual Develop design response spectrum identically to current LRFD Delivered in IN, IL, NY, NJ, GA, MA, TN, UT Thomas.saad@dot.gov

Seismic Design Category (zone) (500 year Return Period) Zone 1-SDC “A” Zone 2-SDC “B” Zone 3-SDC “C” Zone 4-SDC “D” Just showing accelerations isnt enough. We need to have the maps show seismic zones as well

Seismic Design Category (zone) (1000 Year Return Period) Zone 1-SDC “A” Zone 2-SDC “B” Zone 3-SDC “C” Zone 4-SDC “D” SITE CLASS “B”

Seismic Design Category (zone) (1000 Year Return Period) Zone 1-SDC “A” Zone 2-SDC “B” Zone 3-SDC “C” Zone 4-SDC “D” When EQ happened in Charelstion in 1886, it was felt in Boston, Chicago, and St Louis (900 miles away) SITE CLASS “D”

Seismic Design Category (zone) (1000 Year Return Period) Zone 1-SDC “A” Zone 2-SDC “B” Zone 3-SDC “C” Zone 4-SDC “D” SITE CLASS “E”

Long-Term Bridge Performance (LTBP) Program Definition of Bridge Performance: Bridge Performance Encompasses How Bridges Function and Behave Under the Complex and Interrelated Factors they are Subjected to Daily: Traffic Volumes Loads De-Icing Chemicals Freeze-Thaw Cycles Environment Extreme Events Method of Design Construction Materials Age Maintenance History

Long-Term Bridge Performance (LTBP) Program Vision: The LTBP Program will Serve as the National Platform for Strategic Long-Term Investigation of In-Service Bridge Performance. Mission: Foster Improved Bridge Performance, Health, Stewardship, and Management Through the Analysis of Data Collected Over a 20-Year Period on a Large Representative Sample of U.S. Highway Bridges. To achieve this, the Program is Designed to Produce and Support Improved Deterioration Models, Reliable Life-Cycle Cost and Forecasting Models, Design Procedures, and Decision-Making Tools.

Virginia Bridge Testing Coring USW Impact Echo GPR Electrical Resistivity

Initial East Coast N/S Bridge Corridor

Long Term Bridge Performance Program “Robot” Remote controlled Cameras GPS 4 NDE technologies Deployed on 24 bridges 3 high-resolution cameras capture holistic deck-surface images to show deck cracks, and the lengths and widths of the cracks as small as 1 millimeter. 360-degree images also can show the presence and condition of barriers, poles, curbs, and other surrounding hardware. GPS precisely tags condition data with exact location using global coordinates. Electrical resistivity device enables bridge inspectors to measure the level of corrosion within the deck. 14 impact echo devices are a seismic or stress-wave technology that are used to find defects and anomalies in concrete such as delamination and debonding, including depth, spread, and severity. 6 ultrasonic surface wave sensors are used to assess the quality and modulus of elasticity or strength of the concrete deck. GPR provides a qualitative condition assessment of the deck and can detect apparent or suspected deterioration such as delamination or corrosion. The system uses 32 dense array, ground-coupled antennas for high-spatial resolution. Integrates data into a 3-D visualization that shows the exact shape, width, depth, and location of damages.

High-Resolution Imaging USW (Modulus) IE

NBIS Compliance Update Progress made nationally on 20 of 23 metrics 1 metric stayed the same at 100% Satisfactory 2 metrics re‐defined with no comparison available Significant improvement in 5 metrics 3 frequency, scour POAs, QC/QA CY 2011 PY 2013 % Change Satisfactory 70.5 % 79.3 % 8.9 % Active Improvements 29.0 % 20.6 % (8.4 %) Unsatisfactory 0.5 % > 0.08 % (0.42 %) Things are noticeably improving. Significant improvements in 5 metrics: CC to SC or C, and SC to C

NBIS Compliance Update FHWA/AASHTO Task Force in 2011 Some metrics revised for 2012 assessments Remainder revised for current cycle Issued latest version of metrics on 4/1/13 May training for FHWA staff Risk considerations, commentary, incorporated Q&As Metrics for PY 2014 (upcoming review year) 15 of 23 metrics were revised and sent out to Divisions on 4/1/2013

NBI Data Quality Trends show results of significant efforts to reduce errors Error = bad or missing data > 60 Million pieces of data in NBI Number of Errors 2009 2010 2011 2012 115,811 20,284 6,967 4,155 Further clarification: Bad data includes values that are coded that are out of the range of assigned codes for a specific item, or data that does not pass certain reasonableness cross checks such as the bridge deck with curb to curb being larger than the bridge deck with out to out. We acknowledge that there are exceptions so some of these cross checks because of unusual structure configurations. Further clarification: Missing data is values that are not submitted for required items to be coded for highway bridges. A check is made that the bridge is a highway bridge before issuing an error. For instance if a pedestrian bridge is submitted we would not expect to see a functional classification or certain other information.

NBIS Video for Local Agencies Central online library of videos and resources for local agencies Each video addresses a single topic condenses complex regulations and requirements of the Federal-aid Highway Program into easy-to-understand concepts and illustrated examples Launched August 27, 2012 at the American Public Works Association (APWA) International Public Works Congress and Exposition

National Tunnel Inspection Standards (NTIS) SNPRM published in Federal Register Comments due by September 30, 2013 https://www.federalregister.gov/articles/2013/07/30/2013-17875/national-tunnel-inspection-standards#h-4 TOMIE Manual at http://www.fhwa.dot.gov/bridge/ National Tunnel Inventory and Coding Guide being developed

Asset Management System Primer MAP-21 requires AMS for NHS bridges and pavements States document how they will do business State must define performance measures for bridges and pavements Penalties if performance not met http://youtu.be/OGiJeUGI4kI

NBIS Regulations Update Mandated by MAP-21 Methodology, training, and qualifications for inspectors Frequency of inspections Three years to complete (October 2015)

NBIS Update Risk-based inspection intervals 4/1/2017 3:01 AM NBIS Update Risk-based inspection intervals Is 24 months the right interval for both of these bridges? In carrying out the revisions required by paragraph (6), the Secretary shall consider a risk- based approach to determining the frequency of bridge inspections. © 2007 Microsoft Corporation. All rights reserved. Microsoft, Windows, Windows Vista and other product names are or may be registered trademarks and/or trademarks in the U.S. and/or other countries. The information herein is for informational purposes only and represents the current view of Microsoft Corporation as of the date of this presentation. Because Microsoft must respond to changing market conditions, it should not be interpreted to be a commitment on the part of Microsoft, and Microsoft cannot guarantee the accuracy of any information provided after the date of this presentation. MICROSOFT MAKES NO WARRANTIES, EXPRESS, IMPLIED OR STATUTORY, AS TO THE INFORMATION IN THIS PRESENTATION.

NBIS Update Procedure for National Certification of Inspectors 4/1/2017 3:01 AM NBIS Update Procedure for National Certification of Inspectors © 2007 Microsoft Corporation. All rights reserved. Microsoft, Windows, Windows Vista and other product names are or may be registered trademarks and/or trademarks in the U.S. and/or other countries. The information herein is for informational purposes only and represents the current view of Microsoft Corporation as of the date of this presentation. Because Microsoft must respond to changing market conditions, it should not be interpreted to be a commitment on the part of Microsoft, and Microsoft cannot guarantee the accuracy of any information provided after the date of this presentation. MICROSOFT MAKES NO WARRANTIES, EXPRESS, IMPLIED OR STATUTORY, AS TO THE INFORMATION IN THIS PRESENTATION.

NBIS Update Procedures for Reporting “Critical Findings” 4/1/2017 3:01 AM NBIS Update Procedures for Reporting “Critical Findings” Relate to structural or safety- related deficiencies of highway bridges Monitoring activities and corrective actions taken in response to a critical finding © 2007 Microsoft Corporation. All rights reserved. Microsoft, Windows, Windows Vista and other product names are or may be registered trademarks and/or trademarks in the U.S. and/or other countries. The information herein is for informational purposes only and represents the current view of Microsoft Corporation as of the date of this presentation. Because Microsoft must respond to changing market conditions, it should not be interpreted to be a commitment on the part of Microsoft, and Microsoft cannot guarantee the accuracy of any information provided after the date of this presentation. MICROSOFT MAKES NO WARRANTIES, EXPRESS, IMPLIED OR STATUTORY, AS TO THE INFORMATION IN THIS PRESENTATION.

Compliance Oversight and Penalty Procedures MAP-21 mandates Procedures for annual compliance reviews Penalty for noncompliance with the NBIS Establishes timeframes States notified of noncompliance concerns by Dec 31st 45 days to resolve or establish a PCA Implement penalty if no PCA or resolution Federal Register Notice being developed

Thank you!