Ground Motion Dynamic imperfections will affect luminosity performance or cost Most imperfections should be site independent Ground motion is not TRC:

Slides:



Advertisements
Similar presentations
Q11: Describe how the effects of power supply failures on integrated luminosity will be mitigated. TESLA Response : –Mainly consider two types of magnet.
Advertisements

EPS-HEP Aachen 2003R. Brinkmann, DESY Linear Colliders R. Brinkmann, DESY EPS-HEP Conference, Aachen, July 17, 2003.
BDS Change Request: Support of Single L* Optics Configuration Shared by both Detectors Glen White, Nick Walker Sept MDI/CFS Ichinoseki.
1 Holmes IRCC Workshop October 18, 2006 Motivation and Development of PBEE for Existing and New Buildings William T. Holmes Structural Engineer Rutherford.
Nick Walker KEK-DESY meeting 7 th March 2005.
Decision Dynamics and Decision States: the Leaky Competing Accumulator Model Psychology 209 March 4, 2013.
Risk Pooling in Insurance If n policies, each has independent probability p of a claim, then the number of claims follows the binomial distribution. The.
TURNING THE INNER DOWNS INTO ONE BIG QUARRY? NO WAY HOZAY!
Action Implementation and Monitoring A risk in PHN practice is that so much attention can be devoted to development of objectives and planning to address.
Improvements in the Spatial and Temporal representation of the Model Owen Woodberry Bachelor of Computer Science, Honours.
What is Marketing? Everything What is marketed?  Goods Consumer and industrial  Services  Ideas.
Issues of stability and ground motion in ILC Andrei Seryi SLAC October 17, 2005 Selected pages from: Full talk at
Divert: Fine-grained Path Selection for Wireless LANs Allen Miu, Godfrey Tan, Hari Balakrishnan, and John Apostolopoulos MIT Computer Science and Artificial.
Emirates Airline Update AGIFORS, Airline Operations Washington May 2004.
Luminosity Stability and Stabilisation Hardware D. Schulte for the CLIC team Special thanks to J. Pfingstner and J. Snuverink 1CLIC-ACE, February 2nd,
December 3-4, 2007Earthquake Readiness Workshop Seismic Design Considerations Mike Sheehan.
R-1 Project Risk Management. R-2  Qualitative Risk Analysis  Quantitative Risk Analysis  Risk Response Planning  Sticky note technique  Risk matrix.
Ground Motion + Vibration Transfer Function for Final QD0/SD0 Cryomodule System at ILC Glen White, SLAC ALCPG11, Eugene March 21, 2011.
Gek 16/6/041 ITRP Comments on Question 19 GEK 9/06/04 19) For the X-band (warm) technology, detail the status of the tests of the full rf delivery system.
ILC Start-End Simulations Glen White, SLAC May 13, 2014 AWLC14, Fermilab.
Summary of WG1 K. Kubo, D. Schulte, P. Tenenbaum.
Are your chargebacks too low? - Manage your profits, not your fraud Akif Khan, PhD Manager, Solutions Architecture.
Chapter(3) Qualitative Risk Analysis. Risk Model.
Magnet Motion Produces Luminosity Loss. NLC Feedback Operation Kicker Gain Bunch Charge Measure deflected bunches with BPM and kick other beam to eliminate.
Report of 2 nd ILC Workshop (Snowmass) Working Group Kiyoshi KUBO references: Slides of the plenary talks in the workshop by P.Tenembaum and.
Section 3.2 Notes Conditional Probability. Conditional probability is the probability of an event occurring, given that another event has already occurred.
Aim 2 & 4 Integration. Objectives of Aims 2 & 4 Aim 2 Develop multi-scaled modeling program to assess forest management systems Aim 4 Life cycle, policy.
1 Figure 10-4: Intrusion Detection Systems (IDSs) Actions  Alarms  Interactive analysis Manual event inspection of raw log file Pattern retrieval 
Hydraulics is defined as the study of fluid behavior, at rest and in motion Properly designed piping with sound hydraulics can: - Greatly reduce maintenance.
R ISK A NALYSIS & M ANAGEMENT. Risk – possibility that an undesirable event (called the risk event) could happen – Involve uncertainty and loss – Events.
1 1 Slide Simulation Professor Ahmadi. 2 2 Slide Simulation Chapter Outline n Computer Simulation n Simulation Modeling n Random Variables and Pseudo-Random.
Cold versus Warm, parameters impacting LC reliability and efficiency contribution to the discussion on risk factors Giorgio Bellettini, Seul ITRP meeting,
NLC - The Next Linear Collider Project P. Tenenbaum DR  IP  DR Simulations Collaboration + MAC Meeting May 2002 “Now Bliss is Everywhere…”
Monmouthshire WTPL/Jane Corey. Kath Owen What are we losing?
Site Specific Response Analyses and Design Spectra for Soft Soil Sites Steven F. Bartlett, Ph.D., P.E. I-15 NATIONAL TEST BED TECHNOLOGY TRANSFER SYMPOSIUM.
Dark Matter and Rotational Motion e.t. revised feb 09.
UC-12 L1 Flight Track over Ground Sites.
Beam Dynamics IR Stability Issues Glen White / SLAC September IRENG07 Vibration tolerances for final doublet cryomodules Settlement of detector.
Simulations - Beam dynamics in low emittance transport (LET: From the exit of Damping Ring) K. Kubo
Principals of fast injection and extraction R. Apsimon.
Geoffrey Canada: Our Failing Schools. Enough is Enough! By: Symara Donovan and Rolando Romero.
1 /13 Risk Management What is Risk ?. 2 /13 Risk Management What is Risk ? Risk is the possibility of suffering loss. (Carnegie Mellon SEI definition)
BDS, Start to End Simulation, Simulation Codes Summary D. Schulte.
Is it useful or a nuisance?
The process of identifying and controlling the risks is called Risk Management.
From Beam Dynamics K. Kubo
Dead zone analysis of ECAL barrel modules under static and dynamic loads Marc Anduze, Thomas Pierre Emile – LLR CALICE Collaboration Meeting.
Teacher: Alison Roberts Northern Sydney Institute of TAFE
Wake field limitations in a low gradient main linac of CLIC
Oscillations (continues)
What Should We Do?.
CLIC Study Aim Conceptual design report in 2010
Peer Reviewing Sergej Sizov.
הוראת מיומנויות של עבודה בקבוצה מחקר פעולה
Combating Tag Cloning with COTS RFID Devices
أنماط الإدارة المدرسية وتفويض السلطة الدكتور أشرف الصايغ
Primary Production Landscapes
Vibration Control.
03/24/04 NGA Workshop: Fling.
Homophones!.
Where we are Where we want to be Challenges What we are doing
Environmental Impact Assessment (EIA)
Oscillations (continues)
Test Process “V” Diagram
Risk Management Part I Dr. Zahi Yaseen Contact Us
Team Name Names of team members
Chapter 2: Rational Numbers
WP 10 Service Activities: Access to data products and knowledge

Likelihood 4 Allow 8 Mitigate 12 Avoid 16 3 Accept Severity
Presentation transcript:

Ground Motion Dynamic imperfections will affect luminosity performance or cost Most imperfections should be site independent Ground motion is not TRC: TESLA loses 15% luminosity in noisy site, if no luminosity optimisation is done within pulse Impact on static tuning not yet studied

Decision Needed Is the ground motion part of the site selection? Probably too late Is the ground motion to be mitigated by stabilisation? We could also accept loss in performance GG4 will provide ground motion spectra