Connection Details for Prefabricated Bridge Elements and Systems

Slides:



Advertisements
Similar presentations
Gordons Corner Road Over US Route 9 Mahesh Patel, P.E. George Afful, P.E. Gregory Bitsko, P.E.
Advertisements

ODOT Structure Project Manager Training
ODOT Structure Project Manager Seminar Concrete Decks
Precast Bent System for Bridges in Seismic Regions
Actions and Retrofit of Post Earthquake-Damaged Bridges
July Training Outline Part 1 Cost-per –SF and Detailed Estimate Pay Item Detailed Estimate Segments Bridge Level Data Segment Level Data Supports.
ACCELERATED BRIDGE CONSTRUCTION (ABC): THE KEYS TO SUCCESS FROM AN OWNERS PERSPECTIVE Presented by James McMinimee, P.E., P.S.E. UDOT Chief Engineer, Director.
Chp12- Footings.
SPEED and STRENGTH SPEED and STRENGTH  When speed of construction and strength of slab are your concerns, the KWIK SLAB system is your fast and strong.
MDOT ACTT Workshop Structures I-94 From I-96 to East of Connor Participants Steve Stroh, URS Corp Vijay Chandra, Parson Brinckerhoff Raj Ailaney, FHWA.
Bridge Engineering (6) Superstructure – Concrete Bridges
By : Prof.Dr.\Nabil Mahmoud
Bridge over BNSF Railroad 7 km East of Windham - East Bridge Replacement Project Using Accelerated Bridge Construction.
PCI Northeast Bridge Technical Committee Standards for Accelerated Bridge Construction Including the Northeast Extreme Tee (NEXT) Michael P. Culmo, P.E.,
SHRP2 Project R04 Bridge Designs for ABC
PCI 6 th Edition Handbook History. Presentation Outline PCI history Notable modifications to the 6 th Edition General chapter by chapter overview.
SHRP 2 - R04 ABC Demonstration Bridge Design and Construction AASHTO Committee on Construction San Francisco, CA August 16, 2012.
Chapter 34 Bridge Construction.
Connection Details for Prefabricated Bridge Elements and Systems
Totally Precast Concrete Bridges
Bridge Engineering (7) Superstructure – Reinforced Concrete Bridges
3 June Rapid Replacement of the Hood Canal Bridge Approach Spans Joseph Merth, P.E. Bridge Design Engineer 3 June 2008.
Reconstruction of the Eads Bridge Highway Deck
 Project Delivery  Design Considerations  Lessons Learned.
Trestle Rebuilds The Continuing Quest to Fill the Gap
3/10/2010 March 2010 ABC Pooled Fund Study TAC Teleconference 1.
Damage Illustrations. Potential Bridge Damage Bridge Component / DamagePossible Cause Approach Slab or Pavement  Raised, lowered, cracked, or buckled.
Schematic Design of an Accelerated Bridge Construction Project Michael P. Culmo, P.E. Vice President of Transportation and Structures CME Associates, Inc.,
I-5, Skagit River Bridge Collapse First Annual Missouri Bridge Conference April 9, 2015 Columbia, MO Jugesh Kapur, PE, SE.
ODOT Policy for Deck/Slab Closure Pours Sean Meddles, P.E. Assistant Administrator ODOT Office of Structural Engineering.
Bridge Structure Types and Components. BRIDGE STRUCTURE TYPES AND COMPONENTS TECHNICAL STANDARDS BRANCH INTRODUCTION TO BRIDGES TRANSPORTATION Slide 2.
2014 CONSTRUCTION ESTIMATES Estimates Estimates 3 Point of the illustration? Document your assumptions.
ABC/PBES COSTS by Mary Lou Ralls, P.E., Principal Ralls Newman, LLC (formerly Texas State Bridge Engineer)
MaSSENA LATERAL BRIDGE SLIDE CASE STUDY
Public Information Meeting Rehabilitation of Bridge No Flat Rock Hill Road over I-95 Old Lyme, Connecticut Rehabilitation of Bridge No Flat.
Superstructure Replacement Substructure Repair Rehabilitation of I-95 Bridges 11 Bridges Along I-95 Corridor
Topic 7: Timber Subfloor Systems – Basic
Villanova University Dept. of Civil & Environmental Engineering CEE 8414 – Structural Dynamics Northridge Earthquake 1 Northridge Earthquake - Concrete.
Preparatory Seminar for STL Examination By Dr. James Lau, BBS JP.
WVDOH Accelerated Construction Concepts Benjamin Beerman, PE.
SHRP 2 - FIRST DEMO PROJECT KEG CREEK, IOWA R04 – “BRIDGE DESIGNS FOR RAPID RENEWAL” Sandra Larson, P.E. Iowa Department of Transportation Research and.
Reading Structural Drawings
Bridge Engineering (5) Substructure – Abutments and Piers
TOPICS COVERED Building Configuration Response of Concrete Buildings
Introduction Connected to existing Benton Hall via skywalk Size: 103,154 SF above grade on 4 levels 82,661 SF below grade parking on 3 levels Cost: $23,651,159.
Bridge Design to AS 5100 Sydney May 25th 2005 Using High Strength Concrete with AS 5100 opportunities and restrictions.
1 What is Precast Concrete? Precast concrete consists of a mixture of cement, water, aggregates and admixtures. This mixture is cast into a specific shape.
Rapid Bridge Construction: Prefabricated Substructure Elements AASHTO RAC High Value Research Workshop July 27, 2011.
Overview of New Practices & Policy Skewed Bridges.
James C. Renick School of Education PSU AE Senior Thesis 2006 Mick Leso - Structural North Carolina A&T State University - Greensboro.
Foundation Loads Dead Load Live Load Wind Load
Biobehavioral Health Building The Pennsylvania State University Daniel Bodde Structural Option Advisor – Heather Sustersic.
A CCELERATING B RIDGE C ONSTRUCTION (ABC) WITH P REFABRICATED B RIDGE E LEMENTS & S YSTEMS (PBES)
Stenton Avenue Masonry Arch Rehabilitation Approaches to Historic Bridge Rehabilitation Case Study #1 Michael J. Cuddy, P.E. Principal Kara Russell Cultural.
Typical Bridge Components
Vulnerable Structural Elements
Presented By: Marvin Burns, PE Janssen & Spaans Engineering, Inc.
LOI # Pilot Program Design & Related Services for Development of Accelerated Bridge Construction Standards & Pilot Bridge Construction.
Totally Precast Concrete Bridges
FHWA Updates/News Benjamin Beerman, PE Federal Highway Atlanta, GA
High Bridge Re-Deck Project
Oregon DOT Integral Abutment Design Criteria
Pearl Condominiums Philadelphia, PA
INTEGRAL BRIDGES Guided by: Dipu.V.S Lecturer Civil Engg Dept
New Bridge Construction
Sandra Larson, P.E. Iowa Department of Transportation
By T.G.N.C.VAMSI KRISHNA. 171FB M.tech – Civil.
Totally Precast Concrete Bridges
Post Seismic Bridge Inspection
Accelerated Bridge Construction; Raising the Bar
Presentation transcript:

Connection Details for Prefabricated Bridge Elements and Systems Michael P. Culmo, P.E. Vice President of Transportation and Structures CME Associates, Inc., East Hartford, CT

Learning Outcomes After completing this Module, you will be able to: identify roadblocks to accelerated bridge construction identify the resources for locating Connection Details for PBES describe features of PBES that improve the quality of the finished product recognize a typical construction schedule for a bridge built with PBES recall ways to save money by using ABC and PBES After completing this Module, you will be able to: identify roadblocks to accelerated bridge construction identify the resources contained in Connection Details for PBES describe features of PBES that improve the quality of the finished product recognize a typical construction schedule for a bridge built with PBES recall ways to save money by using PBES

Roadblocks to Accelerated Construction The primary concerns that owner agencies have with respect to adopting accelerated construction techniques are: Need for Quality Details Durability Design Methodologies and Training Construction Methodologies FHWA has polled transportation agencies in the past to determine the roadblocks to using ABC. The responses are as shown.

“Connections Details for Prefabricated Bridge Elements and Systems” FHWA has developed this manual This publication is intended to provide information that will go a long way to answering all four of the previous concerns. Focus on details that have been used in the past. In response to the concerns from agencies, FHWA developed a manual that focused on connection details that have been successfully used in the past.

“Connections Details for Prefabricated Bridge Elements and Systems” Project Goals: Gather details of Connections that have been used on accelerated bridge construction projects Investigate transfer of technology from other markets into the bridge market Parking Garages Stadiums Buildings The details were gathered from transportation agencies and other industries, which turned out to be a key component of the work. Accelerated construction is also used in vertical construction. Many of the details used in this industry are transferable to bridge construction.

“Connections Details for Prefabricated Bridge Elements and Systems” All details need to pass a critical test before being published in the document: Does the connection result in a rapid construction process? Does the connection transmit the forces between elements effectively? Is the connection durable? Is it cost effective and easy to construct? If a process or connection is proprietary, is there more than one supplier? It is imperative that all detail pass these critical test in order to ensure proper performance and a 75 year service life

Sources of Data State DOT’s Federal Agencies Questionnaires sent via e-mail Federal Agencies Researchers (previous and current) Producers/Fabricators The connection details were gathered from the following sources.

Forward Table of Contents Section 1 General Topics 1.1 Introduction 1.2 Accel. Construction Overview 1.3 Applicability to Typical Bridges 1.4 Typical Connection Types 1.5 Seismic Considerations 1.6 Materials 1.7 Tolerances 1.8 Fabrication and Construction Section 2 Superstructure Connections 2.1 Deck Systems 2.2 Adjacent Butted Beam Systems 2.3 Decked Stringer Systems 2.4 Modular Superstructures 2.5 Connections to Substructures Section 3 Substructure Connections 3.1 Pier Systems 3.2 Abutment Systems 3.3 Wingwalls and Retaining Walls Section 4 Foundation Connections Appendices Appendix A Notations Appendix B Connection Design Examples Appendix C Standard Products Appendix D Sample Const. Specifications Appendix E Case Studies Appendix F Glossary The manual is organized so that users can easily find details. The sections are divided by parts of the bridge that are defined in AASHTO. Superstructure, Substructure and Foundations. Manual Organization

Connection Data Sheets Detail data sheets were developed that are similar to materials cut sheets. Users can gather enough information to complete a structure type study. Contact information and detail performance are included. Users can contact the agency that submitted the details and find out more information as their project proceeds.

Precast Cantilever Abutments Samples of details included in the manual: Precast cantilever abutment connections

Precast Integral Abutments Samples of details included in the manual: Precast integral abutment connections

Precast Piers Samples of details included in the manual: Precast pier bent connections

Precast Piers Samples of details included in the manual: Precast pier cap connections

Precast Decks on PS Beams Samples of details included in the manual: Precast deck connections on concrete beams

Precast Decks on Steel Framing Samples of details included in the manual: Precast deck connections on steel beams

Precast Decks Samples of details included in the manual: Precast deck connections on steel beams

FRP Decks Samples of details included in the manual: FRP deck connections on steel beams

Total Bridge Element Prefabrication Everything shown in this graphic can be prefabricated and connected Everything shown can be prefabricated

Complete Bridge Element Prefabrication New Hampshire Project How fast can we build a bridge? Experimental project All components prefabricated 115 foot span Precast cantilever abutments Clock started after old bridge was removed Roadway open to traffic in 8 days Time Lapse Video on YoutubeTM Search “Epping Bridge Construction” This is an example of a totally prefabricated bridge in Epping, NH. All details used in this project are included in the manual.

Manual Distribution Availability Published June 2009 Is available through FHWA Highways for LIFE website www.fhwa.dot.gov/hfl/ The manual is complete and available for use. A web-site is under development that will include the details in the manual. Other details will be added to the website as they become available.

Other Sources for Details Utah DOT ABC Website www.udot.utah.gov (search ABC) Piers, abutments, walls, decks PCI Northeast www.pcine.org (Bridge resources) MassDOT Working on new ABC manual NCHRP Report 681 Development of a Precast Bent Cap System for Seismic Regions Web search “NCHRP Report 681” There are other sources of details for ABC connections.

Schematic Design of a Prefabricated Bridge This is an example of how to use the FHWA manual to prepare a structure type study for an ABC project.

Case Scenario 4 lane bridge over an expressway Existing bridge has deteriorated beyond repair Heavy traffic on both roadways A temporary bridge or staged construction is an option The local business will accept a short term closure with the detour As opposed to a long term staged project Establish the detour and accelerate the bridge construction to less than 30 days This hypothetical bridge was chose to represent typical deficient highway overpasses throughout the country.

Existing Bridge The existing bridge layout is as shown.

Existing bridge issues Leaking Deck Joints Low Clearance Major issues include deterioration of substructures caused by leaking joints and spray attack from passing vehicles. The clearance is also substandard. Salt spray attack from vehicles Salt spray attack from vehicles

Proposed Bridge Type After a formal study, the owner opted for the following structure criteria: Continuous steel girders (weathering steel) Reduce to a two span bridge Increase clearance by raising approach grades (3’) Use integral abutments (no deck joints) Composite concrete deck Membrane waterproofing and Bituminous wearing surface Open steel railings (galvanized) The proposed bridge is a conventional composite stringer bridge with the following criteria.

Proposed Bridge No Deck joints Move substructures away from roadway Build new piers and abutments in new locations Increase vertical clearance The layout was chosen to improve the geometry of the roadway under the bridge and eliminate the problems at the site. The new substructures are located at different location to facilitate construction. The new substructures can be built at the same time the existing substructures are demolished, thus saving time.

Sources of details - FHWA Connections manual: - NCHRP Report 681 “Connection Details for Prefabricated Bridge Elements and Systems” Review Chapter 1 Investigate connection types, materials, tolerances Search applicable sections of other chapters for details - NCHRP Report 681 “Development of a Precast Bent Cap System for Seismic Regions” - Utah DOT ABC Standards Before the connections are chosen form the manual. Designers should review chapter 1 to become familiar with ABC concepts.

Connection Types Chosen The owner chose the following connection types Grouted reinforcing splice couplers Quick, proven system Can develop full bar strength Simplifies the design process (same as CIP) Grouted PT Ducts Provides significant adjustability at cap connection Grouted Voids Corrugated metal pipe voids for integral abutments Small blockouts for pinned connections (approach slabs) Concrete Closure pours between precast elements Use for a limited number of connections (slower) The design in this case chose three different types of connections for the bridge

Grouted Reinforcing Splice Couplers Emulates a reinforcing steel lap splice Multiple companies – non-proprietary Used in precast parking garages, stadiums and bridges Installation video on youtube Search “Georgia Pier Construction” Grouted reinforcing splice couplers are an example of a connection that migrated from the vertical construction industry.

Grouted Reinforcing Splice Connectors The couplers can be used where ever a construction joint would normally be placed in a conventional bridge. This facilitates the design of the bridge because it can be designed as a cast-in-place structure. The couplers replace the normal lap splices. The only design change is the depth of the reinforcing cage in order to get proper cover over the couplers.

NCHRP Report 681 Detail Grouted PT Duct Similar to grouted sleeves Used in several states Tested for high seismic regions Significant adjustability Details, specifications and design information available The NCHRP study was for high seismic regions, however the connections are good for all locations.

Footing to Sub-grade Connection The connection of the footings to the sub-grade is made with a simple grout pour. Flowable fill can also be used. The data sheet from the manual is shown.

Footing to Footing Connection Use CIP Closure Pour Cast closure pour during structure erection Design precast for structure DL Design continuous footing for total loads The connection of the footings is a simple closure pour. The closure pour can be placed as the remainder of the bridge is erected. No need to wait for concrete to cure.

Footing to Column Connection The connection of the footings to the column is made with grouted couplers. The data sheet from the manual is shown.

Column to Cap Connection Use details from NCHRP Report 681 The connection of the columns to the pier cap is made with grouted PT ducts.

Completed Pier Column to footing connection Column to cap connection Footing to footing connection This is a graphic showing the pier connections chosen. Footing to subgrade connection

Abutment Details Integral Abutment to piles Section 3.2.3.1 Precast Integral Abutment to Piles Corrugated metal pipe voids Place over pile and fill with concrete Detail developed by Iowa DOT Used in other states also Reduces element weight Has large capacity to transfer pile loads Shear transfer via shear friction Corrugated metal pipes are an inexpensive and structurally sound connection. The voids can be used to reduce element weight as well.

Abutment to Pile Connection The connection of the piles to the abutment cap is made with a simple grouted void. The data sheet from the manual is shown.

Abutment Cap to Cap Connection Use Utah DOT Details Concreted key Use integral diaphragm to link caps together The abutment cap to cap is made with a simple concreted shear key combined with the integral diaphragm that is case after the superstructure is in place. 2+ Piles per cap element are recommended.

Approach Slab Connection The connection of the approach slab to the abutment cap is made with a simple grouted void. The data sheet from the manual is shown. The connection of the backwall to the abutment stem is made with grouted couplers.

Completed Abutment Approach slab connection Cap to cap connection This is a graphic showing the abutment connections chosen. Pile to cap connection

Beam to Deck Connection The connection of the precast deck to the steel beam is made with a simple grouted void. The data sheet from the manual is shown. Note the age of this detail and its corresponding performance.

Deck to Deck Connections The connection of the precast deck to deck connection is made with a simple grouted key. The data sheet from the manual is shown. Note the age of this detail and its corresponding performance.

Deck to Deck Connections The transverse connection of the precast deck is completed with longitudinal PT. The data sheet from the manual is shown. Note the age of this detail and its corresponding performance.

Deck to Deck Connections A connection of the precast deck to deck is made with a closure pour at the roadway crown. This is done to reduce the handling size of the elements and account for the deck geometry. It is not required on every bridge. The data sheet from the manual is shown.

PC Deck Connection Details This is a graphic showing the deck connections chosen.

Superstructure to Abutment Connection Use CIP Closure Pour Utah DOT Detail Allows for significant adjustability Provides connection between abutment stem elements This detail shows the integral abutment elements and connections. This detail is not included in the FHWA manual. It was taken from the Utah DOT ABC standards.

Completed Superstructure Longitudinal crown connection CIP Curb Connection to beam Transverse slab connection This is a graphic showing the superstructure connections chosen. Longitudinal PT Integral Abutment Connection

Complete Bridge Membrane waterproofing with bit. Wearing surface Precast full depth composite deck This is a graphic showing the entire bridge. Precast Integral Abutment Precast Pier

Estimated Construction Schedule The schedule shown is based on real-world experience on ABC projects. This should be considered a minimum timeframe for a typical prefabricated element project.

Costs Typical New Bridge (Cost=$175/sf) = $2,200,000 Premium for ABC (assume 20%) = $440,000 Temporary Bridge (Cost=$50/sf) = ($620,000) Net Savings = $180,000 Note: These prices will vary greatly by region The costs shown are relative. ABC can cost more than conventional construction for the structural elements, however there are other non-structure savings that can be realized, including the cost of a temporary bridge.

Other Cost Savings Ways to reduce bid prices with ABC Standardization Programmatic (not one of a kind) Reduced project site costs (trailers, etc.) Reduced maintenance of traffic costs Inflation Other Non- Bid Savings with ABC Fewer police details Reduced agency costs during construction (staff time) User Costs Plus: $$ can be significant Minus: $$ not in the budget There are other non-structure related cost savings that can also be realized.

Quality FL has had very good success with precast piers in very harsh environments CT has had Precast full depth decks in place for over 20 years Crack Free Deck Excellent condition Integral abutments eliminate deck joints The FHWA manual demonstrates that the details chosen can be exposed to harsh environments with great success.

You can only have any two Old Adage High Quality You can only have any two Rapid Construction Low Cost Based on the information discussed in this presentation, it is possible to get high quality, low overall project costs and rapid construction. By elimination of temporary bridges or costly stage construction schemes, and accounting for reduced agency costs you CAN have all three

Conclusions It is possible to build a complete bridge in 30 days (or less) The FHWA manual provides a starting point for a complete bridge prefabrication project New details are coming on line all the time NCHRP Report 681, Utah DOT, PCI Northeast (www.pcine.org) You do not need to sacrifice quality to get rapid construction You can save money on an accelerated bridge project by: Reducing construction time Eliminate temporary bridges or staging In conclusion: It is possible to replace a bridge in 30 days using prefabricated bridge elements. The FHWA manual is a great starting point for planning an ABC project. ABC does not necessarily mean higher overall project costs.

Module Conclusions You should now be able to: identify roadblocks to accelerated bridge construction identify the resources for locating Connection Details for PBES describe features of PBES that improve the quality of the finished product recognize a typical construction schedule for a bridge built with PBES recall ways to save money by using PBES You should now be able to: identify roadblocks to accelerated bridge construction identify the resources contained in Connection Details for PBES describe features of PBES that improve the quality of the finished product recognize a typical construction schedule for a bridge built with PBES recall ways to save money by using PBES

Questions culmo@cmeengineering.com