Station Fire Project Status Presented by Los Angeles County Flood Control District.

Slides:



Advertisements
Similar presentations
TWO STEP EQUATIONS 1. SOLVE FOR X 2. DO THE ADDITION STEP FIRST
Advertisements

1 Copyright © 2013 Elsevier Inc. All rights reserved. Appendix 01.
What is the opposite of 3/8 A.) 8/3 B.) C.) -3/8 D.) 3 x 8 LW.
Dulles Corridor Metrorail Project Status Update Fairfax County Transportation Advisory Commission November 16, 2010 Richard Stevens Fairfax County Department.
Tysons January 15, Operational Analysis of Dulles Toll Road Ramps to Tysons Boone Boulevard Ramp Analysis Seyed Nabavi Fairfax County Department.
1 I-95/395 HOV/Bus/HOT Lanes April Current Status Project Sections Military Corridor Improving Transit & HOV Other Issues Agenda 2.
NEW JERSEY DAM SAFETY RULES AND REGULATIONS. What is a dam? "Dam" means any artificial dike, levee or other barrier, together with appurtenant works,
Edwardsport IGCC Mine Stabilization Project Construction at the Largest Remediation Mine Grouting Project in North America Presented by: Howard Concrete.
Dennis L. Edwards Tunnel
Who Wants To Be A Millionaire?
Welcome to Who Wants to be a Millionaire
£1 Million £500,000 £250,000 £125,000 £64,000 £32,000 £16,000 £8,000 £4,000 £2,000 £1,000 £500 £300 £200 £100 Welcome.
Grade Separation Alternative
TIGER GRANT Informational Meeting March 30, 2010 MARCH 30,
Still River Study Sponsored by Friends of the Lake Presented by Curtis Read November 17th, 2005.
UNIVERSITY OF ALASKA FAIRBANKS Capital Projects Update Admin Services Open Forum October 11, 2011.
October 22, 2010; Tallinn, Estonia Cosimo Garofalo III ESTONIAN NUCLEAR POWER CONFERENCE.
Mead Valley Municipal Advisory Council October 17, 2012
Patea Freezing Works Asbestos Overview of Quantities and Locations February 2009.
The Proposed Projects. The estimates on the following pages are based on current prices and town labor. The $4 million bond anticipates there will be.
Alachua County Board of County Commissioners NW 16 th Avenue / NW 23 rd Avenue (NW 57 th Terrace to NW 13 th Street) Alachua County Public Works HDR Engineering.
The Probable Maximum Flood (PMF) is an event calculated by FERC to occur once every 10,000 years By comparison, the flood of September, 1986 was a 100-year.
Twin Cities Army Ammunition Plant 2007 Remedial Actions at TCAAP Site C Excavation/Stabilization/Disposal of Contaminated Soils, Placement of Soil Covers,
Public Works: Building Sustainable Communities
Michael Hopkins Assistant Chief, Permitting Ohio EPA Air Permitting for Oil & Gas Well Sites.
1 UPCOMING OPPORTUNITIES – Contractors Caissons Contractor(s) to perform installation of caissons to include purchase of all required materials. u Low/High.
15. Oktober Oktober Oktober 2012.
FM Area Diversion International Legislators Forum June 27, 2014 Keith Berndt PE Cass County ND Administrator.
Southside Flood Protection Red River Channel Extension Clay County Courthouse September 8, 2008.
Update On CTH. AP (Midway Rd.) & LP Calumet County Highway Department July 15, 2008.
Chapter 12 Lesson Goal After completing this lesson, the student shall be able to make hydrant connections and draft from a static water source according.
Equal or Not. Equal or Not
February 10, 2010 Sarasota Memorial Health Care System Management Council February 10, 2010.
Fourth Quarter Oklahoma Data (October-December 2011)
Utility Course Case Studies CEA and Road Builders Workshop Joe Mah, M.Eng.P.Eng.
City of Los Angeles Venice Dual Force Main Project
Route 50 Widening Design/Build Project. 2  Virginia Department of Transportation  Shirley Contracting Company  Dewberry  Fairfax and Loudoun Counties.
6 th Street Water Main And Street Reconstruction 2013.
Using HEC-1 for Subdivision Runoff Detention Pond Design Stacie Kato April 26, 2004.
Mordecai Lincoln Dam & Hunters Pond, Scituate, MA
HUNTINGTON CREEK RECOVERY PROJECT. On June 26, 2012 a lightning strike started the Seeley Fire in Emery County. The fire burned 48,050 acres, of which.
AWARD OF CONTRACT FOR CONSTRUCTION OF MASTER DRAINAGE FACILITY LINES D & D1 CIP NO City Council Meeting December 20, 2011.
US Army Corps of Engineers BUILDING STRONG ® FOLSOM DAM MODIFICATIONS APPROACH CHANNEL EIS/EIR Major Robert Dion and Cameron Sessions Project Managers.
1. 2 Briefing Purpose To provide an update of the existing condition of the Portsmouth Seawall and to indicate the status of future projects.
Sanitary Engineering Lecture 16
Dam Failure Dams are generally an expensive structure that directly affect the economy of the area through power generation, flood control and water supply.
Connecticut Department of Transportation: Office of Environmental Planning (OEP) Statewide Drainage Maintenance Activities State owned Rail Facilities.
Alameda Creek Bridge Replacement Scoping Meeting March 4, 2014.
Sanitary Engineering Lecture 11. Storm Water Runoff Storm water runoff is the precipitation which seeps into the ground if precipitation occurs faster.
Woodrow Wilson Bridge Project 1 Fish Protection Strategies on the $2.45B Woodrow Wilson Bridge Project ~Presented By~ Mike Baker, Environmental Manager.
PINAL COUNTY TOWN HALL Tabletop Exercise - Panel Discussion on a Local Emergency.
Presenter: Dewayne Johnson, P.E. SE Region Director/Bureau of Traffic Operations Director.
Chapter 33 Dam Construction. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Give reasons why.
Heath Delzell – Engineering Bureau IDNR Engineering Progress to Date and Timeline for Project Completion Design and Construction Obstacles.
Otter Creek Watershed Meeting January 19, 2008 Mike Dreischmeier Agricultural Engineer Natural Resources Conservation Service.
City of Appleton Stormwater Management Update Presented to the January 22, 2013 Utilities Committee.
Structures: Design and construction of stream crossings
Water Street Hydrologic and Hydraulic (H&H) Analysis (Drainage Study) Water Street Hydrologic and Hydraulic (H&H) Analysis (Drainage Study) City of Platteville.
York floods November mm rain in 24 hours 3000 people evacuated, Army called in to help Ouse 4.8m above normal levels 80,000 sandbags used.
I-75 Ramp Widening Project Scope of Project – Safety Project to Widen I-75 NB Exit Ramp (Ramp A) and I-75 SB Exit Ramp (Ramp C) at the I-75/US 25W Interchange.
Proposed Storm Water Utility Fee July Proposal for future Drainage Improvement: Faith Presbyterian Church Estimated Cost: $35, *Install three.
Stormwater Management
Town of Brighton, Department of Public Works
Interstate 15 North Phase 4 Cost Estimates 09/03/2015
Manchester’s CSO Program: A Look Behind and a Look Ahead
Project Scope of Work Project Contacts
Monterey County Project Report for Measure X Expenditures
Commission Agenda Item # 17
Presentation transcript:

Station Fire Project Status Presented by Los Angeles County Flood Control District

Project Location: Pickens Debris Basin is located in La Crescenta, east of the intersection of Briggs Avenue and Cross Street. Project Scope: Remove existing timber planking on top of spillway Raise spillway by 5 feet Extend outlet tower by 5.5 feet Raise channel wall by 2 feet Regrade access road Capacity: Before (fall of 2009) 125,000 cubic yards After enlargement156,000 cubic yards Construction Dates: Start 07/31/2010 End10/11/2010

Project Location: Pinelawn Debris Basin is located in La Crescenta, northwest of the intersection of Pinelawn Drive and Pinecone Road. Project Scope: Remove existing timber planking and top of debris barrier posts Construct a concrete parapet wall at inlet structure Raise outlet tower by 5 feet Capacity: Before (fall of 2009) 3,200 cubic yards After enlargement 4,800 cubic yards Construction Dates: Start 09/30/2010 End 10/15/2010

Project Location: Starfall Debris Basin is located in La Crescenta, northeast of Pinecone Avenue and Starfall Drive. Project Scope: Remove existing debris barrier posts and timber planking at spillway Raise spillway by 7 feet Raise spillway wall by 4 feet Construct an access ramp Construct a front wall and access ramp wall Reconstruct access road Raise outlet tower by 3 feet Capacity: Before (fall of 2009) 15,000 cubic yards After enlargements 28,300 cubic yards Construction Dates: Start 07/29/2010 End 10/15/2010

Project Location: The project location is on Crescenta Valley Water Districts access road, 300 feet north of 6065 Canyonside Road in La Crescenta. Project Scope: Construct 72 inch diameter Corrugated Metal Pipe across the access road Install steel debris barrier posts Place concreted stone riprap Purpose: Redirect as much debris flow as possible away from Canyonside Road back to the adjacent Pickens Canyon watercourse Project Status: Environmental permit application to regulatory agencies 8/19/2010 Construction to follow in fall 2010

Station Fire Project Status This presentation is available at: