King Fahd University Of Petroleum & Minerals Value Engineering Study For Car Parking Shade Presented By Ali M. Moussa For CEM 512 :Value Engineering Dr.

Slides:



Advertisements
Similar presentations
Numbers Treasure Hunt Following each question, click on the answer. If correct, the next page will load with a graphic first – these can be used to check.
Advertisements

Angstrom Care 培苗社 Quadratic Equation II
3rd Annual Plex/2E Worldwide Users Conference 13A Batch Processing in 2E Jeffrey A. Welsh, STAR BASE Consulting, Inc. September 20, 2007.
1
Myra Shields Training Manager Introduction to OvidSP.
Objectives: Generate and describe sequences. Vocabulary:
David Burdett May 11, 2004 Package Binding for WS CDL.
Whiteboardmaths.com © 2004 All rights reserved
1 CREATING AN ADMINISTRATIVE DRAW REQUEST (HBA) Complete a Checklist for Administrative Draw Requests (Form 16.08). Draw Requests amount must agree with.
1 CREATING AN ADMINISTRATIVE DRAW REQUEST (OCC) Complete a Checklist for Administrative Draw Requests (Form 16.08). Draw Requests amount must agree with.
Prepared by: Workforce Enterprise Services For: The Illinois Department of Commerce and Economic Opportunity Bureau of Workforce Development ENTRY OF EMPLOYER.
Exit a Customer Chapter 8. Exit a Customer 8-2 Objectives Perform exit summary process consisting of the following steps: Review service records Close.
Local Customization Chapter 2. Local Customization 2-2 Objectives Customization Considerations Types of Data Elements Location for Locally Defined Data.
Process a Customer Chapter 2. Process a Customer 2-2 Objectives Understand what defines a Customer Learn how to check for an existing Customer Learn how.
Custom Statutory Programs Chapter 3. Customary Statutory Programs and Titles 3-2 Objectives Add Local Statutory Programs Create Customer Application For.
Custom Services and Training Provider Details Chapter 4.
CALENDAR.
1 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt BlendsDigraphsShort.
1 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt FactorsFactors.
1 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt Wants.
You will have fifteen seconds to answer each question using your resource booklet. There are fifty questions. Though it has little to do with the Apprentice,
Chapter 6 File Systems 6.1 Files 6.2 Directories
1 Click here to End Presentation Software: Installation and Updates Internet Download CD release NACIS Updates.
The 5S numbers game..
1 Florida Gulf Coast University Small Business Development Center (SBDC) Procurement Technical Assistance Center (PTAC) FAR.
Inspections on an iPad, iPhone, iPod Touch, Android Tablet or Android Phone.
A Fractional Order (Proportional and Derivative) Motion Controller Design for A Class of Second-order Systems Center for Self-Organizing Intelligent.
1 Combination Symbols A supplement to Greenleafs QR Text Compiled by Samuel Marateck ©2009.
Break Time Remaining 10:00.
Announcements Homework 6 is due on Thursday (Oct 18)
11 Module 3: During the Annual Meeting Developing a PC ISP – October 2009.
Table 12.1: Cash Flows to a Cash and Carry Trading Strategy.
1 Room Planning Service Area.
Red Tag Date 13/12/11 5S.
PP Test Review Sections 6-1 to 6-6
1 Atomic Routing Games on Maximum Congestion Costas Busch Department of Computer Science Louisiana State University Collaborators: Rajgopal Kannan, LSU.
1 The Blue Café by Chris Rea My world is miles of endless roads.
John Ogilvie High School - CfE Physics
Business and Economics 6th Edition
Services Need Marketing Chapter 11. A service is an activity that is intangible, exchanged directly from producer to consumer, and consumed at the time.
Bellwork Do the following problem on a ½ sheet of paper and turn in.
Power Systems Design -II
Exarte Bezoek aan de Mediacampus Bachelor in de grafische en digitale media April 2014.
Why Do You Want To Work For Us?
Sample Service Screenshots Enterprise Cloud Service 11.3.
Copyright © 2012, Elsevier Inc. All rights Reserved. 1 Chapter 7 Modeling Structure with Blocks.
1 RA III - Regional Training Seminar on CLIMAT&CLIMAT TEMP Reporting Buenos Aires, Argentina, 25 – 27 October 2006 Status of observing programmes in RA.
Adding Up In Chunks.
1 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt Synthetic.
City Council Meeting Agenda Items October 28, 2013.
1 hi at no doifpi me be go we of at be do go hi if me no of pi we Inorder Traversal Inorder traversal. n Visit the left subtree. n Visit the node. n Visit.
Prof.ir. Klaas H.J. Robers, 14 July Graduation: a process organised by YOU.
1 Let’s Recapitulate. 2 Regular Languages DFAs NFAs Regular Expressions Regular Grammars.
Speak Up for Safety Dr. Susan Strauss Harassment & Bullying Consultant November 9, 2012.
Essential Cell Biology
Converting a Fraction to %
Import Tracking and Landed Cost Processing An Enhancement For AS/400 DMAS from  Copyright I/O International, 2001, 2005, 2008, 2012 Skip Intro Version.
Copyright Tim Morris/St Stephen's School
1 Dr. Scott Schaefer Least Squares Curves, Rational Representations, Splines and Continuity.
1 Decidability continued…. 2 Theorem: For a recursively enumerable language it is undecidable to determine whether is finite Proof: We will reduce the.
Aviation Management System 1 2  Silver Wings Aircraft Aviation Management System represents a functional “high – end” suite of integrated applications.
CEM-512 Value Engineering Highway Project: South Interchange.
VALUE ENGINEERING Prepared By Mohammed Abdul Hafeez Us Shan PLUMBING OF A VILLA In Relevance to CEM 512 This Project is Prepared for Honorable Dr. SAADI.
King Fahd university of Petroleum and Minerals Construction Engineering and Management Department CEM 512 Unused Space in Mosque To: Prof. Sadi Assaf Prepared.
V.E. of Selecting Flooring Materials KING FAHAD UNIVERSITY OF PETROLEUM & MINERALS College of Environmental Design Construction Engineering & Management.
CEM512 / 043; King Fahd University of Petroleum and Minerals Department of Construction Engineering and Management Value Engineering CEM512 Term.
King Fahd University of Petroleum and Minerals CEM 512 Value Engineering Term Project Turbine Fuel Gas Heater Prepared by: Ahmed S. Al Zahrani ID#
Internship Presentation
Term Project: Challenges in supplying Energy to Central Region
Presentation transcript:

King Fahd University Of Petroleum & Minerals Value Engineering Study For Car Parking Shade Presented By Ali M. Moussa For CEM 512 :Value Engineering Dr. Saadi Assaf

Outlines Introduction Job Plan –Information Phase –Functional Phase –Creative Phase –Judicial Phase –Evaluation Phase –Development Phase –Implementation Phase Conclusion

Introduction Zamil Air Conditioners is going to build a new factory in the Second Industrial City (Dammam), this project is in the bidding phase and its under the management of our department (CES). My boss assigned to me the detailed estimate cost and to provide him with low prices for the items which not have specifications in the drawings. One of these items is the parking lot shading system which was designed to accommodate about 127 cars. i did a VE study to select the most suitable shade system as we will see in the next slides.

Job Plan In any VE study, Job Plan is an essential tool to investigate the problem and the functions in order to generate ideas and evaluate them in a systematic procedure. In this study I divided the job plan to the following phases: –Information Phase –Functional Phase –Creative Phase –Judicial Phase –Development Phase –Implementation Phase

Information Phase The project is in the Detailed Estimate phase and all the drawings and specifications are ready. The parking is designed to accommodate about 127 cars The parking divided to 3 rows, 2 rows consist of 40 cars each and one row consists of 47 cars. Each car parking is inclined 60º to facilitate the access of the car The area for each car will be about 19.2 square meters The total shaded area will be about 2438 SM The structure should be demountable

Information Phase Consultation Record ContactMajor points CES Local providersDesign & prices Contractorsconcrete prices Historical datapricing

Information Phase Objectives or required Criteria Provides shade Provides hail protection. Fire proof. Reasonable initial Cost. Maintenance Cost. Nice look.

Information Phase After investigating the local market I found that the parking shade systems available are two types. Steel structure with Steel Shade and Steel Structure with Cloth Shade. Steel Structure with steel shade This system is available in three types, Standard (4 supporting Columns),single canopy ( 2 supporting Columns) and double canopies in case of two adjacent rows of car parking. Steel Structure with Cloth Shade This system is available in three types, Standard (4 supporting Columns),single canopy ( 2 supporting Columns) and double canopies in case of two adjacent rows of car parking.

Information Phase Steel Structure with PVC Shade This system is available in three types, Standard (4 supporting Columns),single canopy ( 2 supporting Columns) and double canopies in case of two adjacent rows of car parking.

Information Phase Cost Data No.ParticularArea/M²area/carCost/M²cost/car 1Steel Structure with Steel Shade (standard type) Steel Structure with Steel Shade (single canopy) Steel Structure with Steel Shade (Double canopies) Steel Structure with Cloth Shade (standard type) Steel Structure with Cloth Shade (single canopy) Steel Structure with Cloth Shade (Double canopies) Steel Structure withPVC Shade (standard type) Steel Structure with PVC Shade (single canopy) Steel Structure withPVC Shade (Double canopies)

Functional Phase WhyFunctionHow To protect cars from Sun Rays and Hails Provide Shade for car parking Cover the car parking What Does it now do? VERB NOUN Provide Shade Protect hail Function Work Sheet

Functional Phase Ideas Generated: 1.Steel Structure with Steel Shade (standard type) 2.Steel Structure with Steel Shade (single canopy) 3. Steel Structure with Steel Shade (Double canopies) 4. Steel Structure with Cloth Shade (standard type) 5. Steel Structure with Cloth Shade (single canopy 6. Steel Structure with PVC Shade (standard type 7. Steel Structure with PVC Shade (standard type 8. Steel Structure with PVC Shade (single canopy) 9. Steel Structure with PVC Shade (Double canopies) 10. Wooden Structure with Cloth Shade 11. Wooden Structure with Wooden Shade 12. Planting trees in appropriate design to provide shade

Judicial Phase Stability Potential Cost Probability of implementation Time to implement Fire proof Total. Rank. 1. Steel Structure with Steel Shade (standard type) Steel Structure with Steel Shade (single canopy) Steel Structure with Steel Shade (Double canopies) Steel Structure with Cloth Shade (standard type) Steel Structure with Cloth Shade (single canopy Steel Structure with Cloth Shade (Double Canopies) Steel Structure with PVC Shade (standard type Steel Structure with PVC Shade (single canopy) Steel Structure with PVC Shade (Double canopies) Wooden Structure with Cloth Shade Wooden Structure with Wooden Shade

Judicial Phase IdeaAdvantagesDisadvantagesRank Steel with cloth (Double Canopies) Free space Nice Looking Fire Proof1 Steel with Cloth (standard type) Low Cost Stability Post every 10 m Fire Proof 2 Steel with Cloth (single Canopy) Free space Nice looking Stability Fire Proof 3 Steel with Steel Shade (Standard type) Stability Fire Proof Post every 12 m Generate Heat 4 Steel with Steel Shade (Double type) Stability Fire Proof Generate Heat4 Steel with Steel Shade (single Type) Stability Fire Proof High cost Generate Heat 5 Steel with PVC (Standard Type) Nice lookingVery High Cost Post every 10 m Fire Proof 6

88

Development Phase As per the design ( Fig6), the double canopies applicable only on 80 cars and a single canopy or standard type shade applicable on 47 cars. For this I selected cloth shading (double canopies) for the 80 cars and Cloth shading (single canopy) for the 47 car.

Development Phase cloth shading double canopies) 80*1920 = Cloth shading (standard type) 47*1728 = Total SR Steel Shading (double Canopies) 80*2592 = Steel shading (single canopy) 47*2630 = Total SR Saving in initial cost = = 29% reduction. Since the two combinations have same annual rate of maintenance so the result of the life cycle cost will be effected only by the initial cost assuming the saving cost is Zero for both.

Implementation Phase 1. How should be implemented? The proposed result will be discussed with my manager and with the administration department to take their approval. 2.What should be changed and in what sequence? Since the structure is not mentioned in the drawings because this is not a customized design, and its the responsibility of the Manufacturer to provide his design and the shop drawings, so nothing will be changed. 3.Who s do it should ? CES Dept. should follow up this with the contractors. 4.How long it should take? 2 weeks for bidding and 40 days for supplying and instillation. 5. Implementation cost? 20 man hours. (50 SR / hr)

Conclusion The selection of the combination of the Cloth shading (double canopies) and Cloth shading (standard Type) will meet all the requirements and criteria which will reduce the cost to the minimum possible cost maintaining the functionality of the project. This result is subjective and relative to this case and that it could be different if the parking is residential or commercial where the aesthetic factor is very important.