Chalmette Refinery Good Catch 04-12-05.

Slides:



Advertisements
Similar presentations
AUTOMOTIVE FASTENERS.
Advertisements

Hoop House Construction. Parts of the hoop house Frame Hoops Braces Plastic cover.
How To Catch A Swarm Using Buckets. Take 2 plastic buckets and cut a large matching hole in the bottom of each. Using screen wire, preferably 1/8 hardware.
Safety Topics Tire Safety How long does it take to be safe? Accidents happen in a matter of seconds! Rim Maintenance Lock ring; the most important.
Fasteners Any device used to hold 2 or more pieces of material together or in place Shank – long stem part of a nail/screw.
Step 1: Digging a Cellar On land, a majority of wells begin with digging a cellar from three to fifteen feet in depth. The purpose of a cellar is to align.
Safety Considerations. High voltage High current POWER SUPPLIES can cause burns or start fires even at low voltages MAINS VOLTAGE is potentially lethal.
Inspection & Preventive maintenance of breakers
It can be as easy as patching a hose. TEAM UP! FOR COMPRESSED AIR SAVINGS.
Toggle Bolt When the screw is tightened a firm anchorage is made.
What is a fastener? A device to locate or hold parts
Installation. Indoor Unit Installation Typical Installation.
Morgan City Rentals Diesel Jet Pump 6 x 6 Peerless Safe Operating Practices and Procedures.
Postal Responsibility/Contractor responsibility 1.Serial number of fire extinguisher 2.Number found on fire extinguisher and panel 3.Date extinguisher.
This tutorial shows how to adapt your registration plate mount to host your first aid box or tool box.
PAPER ROCKET LAUCNHER Bob Galliher Hobart Middle School 705 e.4 th St. Hobart, In
PEUGEOT 206 INSTALLATION 99’— 05’ TU5JP4
Installation. Indoor Unit Installation Typical Installation.
HYDROLOGIC FIELDWORK MANUAL STAGE GAGE INSTALLATION AND MAINTENANCE
TP4-ENERSOL-TD/PV double function
Pipeline Pigging Incident
Agricultural Mechanics 1 Kingsburg High School. Identifying Metals  All metals are either ferrous or nonferrous Ferrous metals contain iron(Fe) Nonferrous.
PHSAUTOMOTIVESALSPHSAUTOMOTIVESALS DRUM BRAKE OVERHAUL.
Outcome 3 (part 2) Heat emitters and their components Unit 208: Central heating systems.
LINEAR MEASUREMENT.
Base metal prep.
2.3.8 Student Book © 2004 Propane Education & Research CouncilPage Performing Pre-Unloading Cargo Tank Emergency Discharge System & Delivery Hose.
Near Miss Reporting Program.  Definition  An event that could have caused harm or damage, But did not.  Objective/ Purpose  To encourage the reporting.
LiH Casting & Testing1 Lithium Hydride Disc Casting & Testing Approaches C. M. Lei March 2, 2007.
© Penn State Food Safety and Sanitation for Food Manufacturers Course Equipment Sanitary Design.
Top surface of B3L Top surface of B3L B3L12 Tried to blow off, but couldn’t Insde of tube. B3L15 The dot at the middle.
TRENTON Casing Filler Presentation
Significant Potential Incident Unauthorized Weld on Pressurized Water Line Timmins, Ontario, Canada October 17, 2011.
Connecting to industry. Hose Coupling Safety It is important to fully inspect the overall hose assembly both prior to installation, and also after the.
1 HVACR316 - Piping Safety Solder and Braze Joints Safety Solder and Braze Joints.
C1 inspection results T. Meighan. C1 Lead Block Area Upper chill plates bowed upwards from side pressure (?) Top fingers pulled away from winding pack.
Launch Chameleon Plus P - More Preventive features and safety L - More Longer Lasting and robust U - More User friendly operation S - More Service friendly.
Compressor Replacement – ODU
Proactive leak detection (using infra red techniques)
Company Confidential CABLOFIL ® New Products 2007 / 2008.
Safety Moment Choke Manifold Pressure Test
XR621 Drive Hose Update Kit. Removal Turn off Battery dis Drain hydraulic tank Remove both rubber lines under chassis and discard. Remove and discard.
6/9/2016 Quick Reference Parts Guide Introduction This Quick Reference Parts Guide is an easy way to locate part numbers to common replacement parts. It.
Suggestion for installation Demolish and destroy the old air condition, then send them to owner building Install a new one by last main.
Rapid Change Technology The following is a presentation to aid Technicians in the replacement of the Rapid Change Technology Block.
Fluid Mechanics for Chemical Engineers Arif Hussain (Lecturer)
Section 2 Safety, Tools and Equipment, Shop Practices Unit 6: Fasteners.
Assembly of steering.
UNIT-5. ELECTRICAL SAFETY, WIRING & INTRODUCTION TO POWER SYSTEM
Using Gas Welding Equipment
Factor # Potential Profit or Gain from Actions
CLEAN UP & INSPECTION.
electrical connection (cover to cover)
Care and Maintenance of Super Clamps
POSCO 김수연 이정인.
Industrial Skills Fasteners & Hardware.
CDL Training.
2.2 Gallon TourTank Installation
THE SKINNER COMPANY Product Review
Chloride Stress Corrosion
Always ensure the correct grade and length bolts are used
Flanges.
TRENTON Casing Filler Presentation
Mechanical hardware.
Mechanical hardware.
Safety Practices: Cold Metal
Reader Swap out Guide.
Valve stem “gag” mechanism
Safety Alert Screwed Fittings 04/95 Background
Presentation transcript:

Chalmette Refinery Good Catch 04-12-05

ICAR Date & Time Incident Started: 4/11/05 12:10:00 PM Incident Description: During inspection of K-2308 H2 make up compressor it was discovered that a bolt resting on the 4th stage suction piping had worn a hole in the pipe and caused the release of make up hydrogen. The compressor was taken off line the depressured.

1/4” stainless steel screw and nut 1/4” stainless steel screw and nut. Designed for strength and corrosion resistance

Side view of schedule 160 pipe. Designed to withstand high pressure

The screw and nut mounted a temp gauge to a stainless steel plate.

The gauge was mounted at this height. Higher than this photo depicts. Back of plate was not obvious from the walk way. So, it was not visible to operators making their rounds The gauge was mounted at this height. Higher than this photo depicts. Gauge

The screw and nut were touching the pipe at this height Gauge The screw and nut

It appears that the inner wall of the sch It appears that the inner wall of the sch. 160 pipe may have just been penetrated and began leaking Hydrogen because of the rubbing action of the screw and nut

The nut actually fit inside of the hole

Mounting bracket Wall of pipe Nut & washer Screw Point of contact

Close up of screw and nut that cut through the pipe

Bracket hanging from thermo coupling wire Section of pipe removed for repair.

Section of pipe removed for repair. Location of hole

Two mechanics from Dressor Rand happened to hear the leak when they were working the compressor and contacted our operators. The operators responded immediately and safely shut the compressor down

Gerald Labarrere, stillperson of the HC unit, thanks Ronald Ratcliff and Mark Majorie, of Dressor Rand, for catching and reporting the leak

On behalf of the JH&SC, Mike Fandal, ExxonMobil execution supervisor, presents Mark and Ronald Ratcliff, with a Safety award

It’s hard to believe that a 1/4” screw......

in just the right position, could cause such a potential situation.

Release Potential ? Hydrogen

Is there any equipment in your area that might be vibrating and touching other equipment? R.Evans JH&SC