Alfredo Güemes Prof. Materials Science Dept. Aeronautics

Slides:



Advertisements
Similar presentations
TWO STEP EQUATIONS 1. SOLVE FOR X 2. DO THE ADDITION STEP FIRST
Advertisements

You have been given a mission and a code. Use the code to complete the mission and you will save the world from obliteration…
Advanced Piloting Cruise Plot.
Chapter 1 The Study of Body Function Image PowerPoint
Copyright © 2011, Elsevier Inc. All rights reserved. Chapter 5 Author: Julia Richards and R. Scott Hawley.
1 Copyright © 2010, Elsevier Inc. All rights Reserved Fig 2.1 Chapter 2.
By D. Fisher Geometric Transformations. Reflection, Rotation, or Translation 1.
Business Transaction Management Software for Application Coordination 1 Business Processes and Coordination.
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Title Subtitle.
My Alphabet Book abcdefghijklm nopqrstuvwxyz.
0 - 0.
2 pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt ShapesPatterns Counting Number.
DIVIDING INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
SUBTRACTING INTEGERS 1. CHANGE THE SUBTRACTION SIGN TO ADDITION
MULT. INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
FACTORING ax2 + bx + c Think “unfoil” Work down, Show all steps.
Addition Facts
Year 6 mental test 5 second questions
Year 6 mental test 10 second questions
Around the World AdditionSubtraction MultiplicationDivision AdditionSubtraction MultiplicationDivision.
Learning to show the remainder
ZMQS ZMQS
BT Wholesale October Creating your own telephone network WHOLESALE CALLS LINE ASSOCIATED.
Materials for airframes, the A380 and beyond
Christina Altkvist, Jonas Wahlbäck, Per Hallander, Tonny Nyman
ABC Technology Project
Mental Math Math Team Skills Test 20-Question Sample.
Chapter 4 Estimating and Reducing Labor Costs
Multiple dependency activity on node (AoN) networks ( lecture )
1 Undirected Breadth First Search F A BCG DE H 2 F A BCG DE H Queue: A get Undiscovered Fringe Finished Active 0 distance from A visit(A)
Filling and Wrapping Review Sheet
HT Series – High Temperature Technology 1 INTERPUMP GROUPS NEW PUMP LINE FOR CAR WASH AND INDUSTRIAL APPLICATIONS UP TO 85°C (185° F)
© Charles van Marrewijk, An Introduction to Geographical Economics Brakman, Garretsen, and Van Marrewijk.
VOORBLAD.
8.4 Percent Concentration
Factor P 16 8(8-5ab) 4(d² + 4) 3rs(2r – s) 15cd(1 + 2cd) 8(4a² + 3b²)
Squares and Square Root WALK. Solve each problem REVIEW:
We are learning how to read the 24 hour clock
1..
© 2012 National Heart Foundation of Australia. Slide 2.
Lets play bingo!!. Calculate: MEAN Calculate: MEDIAN
Understanding Generalist Practice, 5e, Kirst-Ashman/Hull
Chapter 5 Test Review Sections 5-1 through 5-4.
SIMOCODE-DP Software.
GG Consulting, LLC I-SUITE. Source: TEA SHARS Frequently asked questions 2.
Addition 1’s to 20.
25 seconds left…...
Subtraction: Adding UP
Equal or Not. Equal or Not
Slippery Slope
Test B, 100 Subtraction Facts
Januar MDMDFSSMDMDFSSS
Week 1.
Number bonds to 10,
We will resume in: 25 Minutes.
©Brooks/Cole, 2001 Chapter 12 Derived Types-- Enumerated, Structure and Union.
1 Unit 1 Kinematics Chapter 1 Day
PSSA Preparation.
1 PART 1 ILLUSTRATION OF DOCUMENTS  Brief introduction to the documents contained in the envelope  Detailed clarification of the documents content.
How Cells Obtain Energy from Food
Chapter 30 Induction and Inductance In this chapter we will study the following topics: -Faraday’s law of induction -Lenz’s rule -Electric field induced.
New Materials in the Design and Manufacturing of Hot Structures for Aircraft Engines Allvac 718Plus Oktober 2010 Flygteknik 2010.
Mould tools John Summerscales.
The A380, Leader on Manufacturing technology FARNBOROUGH 20 th /21 st July 2004 Neil HARRIS Presented by.
Presentation transcript:

'Automation in aerospace composite processing; its impact on tooling needs' Alfredo Güemes Prof. Materials Science Dept. Aeronautics Univ. Politecnica Madrid Pedro Muñoz-Esquer Director Dpt. Composite Engineering Airbus-España

Content General. The Airbus A-380 Overview of composites manufacturing processes Production of the unpressurized fuselage section Production of the horizontal estabilizer Requirements for the tooling Conclusions June - 2000

Airbus A-380. A380-700 m A380-900 Envergadura Longitud Altura 79.80 67.90 24.10 79.40 A380-800 73.00 79 ft 1 in / 24.1 m Envergadura Longitud Altura 261 ft 10 in / 79.8 m A380-800 / A380-800F 239 ft 6 in / 73.0 m 22 % of the structural weight, over 30 Tm, is done in composites June - 2000

June - 2000

July 04: A380 MSN001 at the assembly line in Toulouse June - 2000

Composite Materials Production PULTRUSION BRAIDING FIBER PLACEMENT COILING THREADS R.T.M. AUTOMATIC TAPE LAYUP June - 2000

June - 2000

Workload in Airbus-Spain Dorsal Fin Costillas del Ala Timón de Dirección (Rudder) Belly Fairing WLGD Montaje Cajones Sección 19 Sección 19.1 A.P.U. BLGD June - 2000

Unpressurized fuselage section 19 June - 2000

June - 2000

June - 2000

June - 2000

June - 2000

A 380 - Panels Section 19 Fibre Placement Lay-up Transfer to curing tool Skin curing Co-bonding Triming Hot Forming Flat lay-up Cutting Ultrasonic Inspection June - 2000

Curing tool Section 19 Floating skin done in INVAR, on steel structure June - 2000

June - 2000

June - 2000

June - 2000

A 380 - Skin Horizontal Stabilizer ATL Vacuum bag Cure Cycle Inspection BASE Automat Cutting Assembly + Vacuumbag ATL, flat Hot Forming STRINGERS Inspection Automatic Trimming Cure Cycle Cobonding June - 2000

Tooling requirements Dimensional accuracy in very large dimensions Dimensional stability under thermal excursion 200 ºC Durability Surface quality Compatibility with demoulding agents Easy of manufacturing, inspect and repair High thermal condutivity, low weight, low thermal expansion Tooling materials: Steel, Invar, CFRP, graphite, June - 2000

Additional tooling reqs. for RTM Very stiff. The dry preform need to be packed tight Very high accuracy in thickness to control fibre volume, and to avoid dry spots. Resin injection and vacuum ports needs to be carefully positioned for a good resin flow. Once closed, vacuum level better than 50 mm Hg. O-ring seal is critical. Heater and cooling system (electrical resistances, water conducts,...) can be built-in at the tool. June - 2000

Assembly tooling FLEXIBLE JIG:Placing of lateral boxes in a fixed position. After positioning the whole system can be moved. Old tooling, poor ergonomics, lead time reduction impossible Alignment according to geometrical key features. These movements are made by the positioners, taking into account a theoretical reference. BEST-FIT calculation before join-up operation. Recording of HTP reference position within a friendly graphical user interface. June - 2000

Conclusions + Composite manufacturing is still a labor intensive process, for many components. + New technologies have been developed to improve the productivity and quality of the parts. + Special moulds requirements derive from the large size of the components, the thermal excursion and the sticky nature of the composite during cure. June - 2000