Additional Upstream Coil Shielding

Slides:



Advertisements
Similar presentations
G2p Hall Infrastructure Alan Gavalya May Overall g2p Target on Pivot in Hall A.
Advertisements

General Information Dimensions · Structure Width: ~ 197in. (16.4’), 99in. (8.2’)/car · Slope Angle: 5 degree · Structure Height (Front): 100in. + base.
Liquid H 2 Absorber Production Contents (1)MICE Absorber Status (2)MICE Absorber Modification (3)Plan/Schedule (4)Summary MICE CM-23 in HARBIN Shigeru.
BARTOSZEK ENGINEERING 1 The Design of the Booster Collimators Larry Bartoszek BARTOSZEK ENGINEERING 3/10/03.
Frame design Status TB-SWG May 2005 Presented by K. Ioki Prepared by M. Morimoto VV and Blanket Division, ITER Garching ITER.
Mercury Chamber Update V. Graves NF-IDS Meeting October 4, 2011.
Controls for Polarimeter Converters
MERIT Hg System Final Design Review Hg Target System Design Interfaces V.B. Graves P.T. Spampinato T.A. Gabriel MERIT Collaboration Meeting MIT Plasma.
MICE RF and Coupling Coil Module Integration Issues Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 27, 2004.
Tagger and Vacuum Chamber Assembly Procedure. Preassembly of second bottom yokes and poleshoes. a) Install special support. b) Place the second bottom.
Tagger and Vacuum Chamber Design. Outline. Design considerations. Stresses and deformations. Mechanical assembly.
TAGGER MAGNET DESIGN Presented by Tim Whitlatch Hall D Tagger Magnet Design Review July 10,
MICE Collaboration Meeting March 29 - April 1, CERN MICE alignment, tolerances and supports Tuesday March 30 Room Edgar Black/IIT March17-
LINAC LASER NOTCHER READINESS REVIEW August 5 th, 2014 Kevin Duel – Mechanical Support Engineer.
Robin Wines. Verbal agreement with BNL to acquire 48D48 magnet Contact at BNL indicates 4 of these magnets in storage BNL agrees to disassemble magnet.
05/30/08J. Dunne -- SANE Collaboration Meeting 1 Beamline Status Upstream beamline –Chicane –SEM –Rasters –Girder Downstream beamline –Helium bag –Extension.
Electrostatic Septum For AGS C. Pai Brookhaven National Laboratory Collider-Accelerator Department
1 Belle II IR 2 Shuji Tanaka KEK Joint Belle II & superB Background meeting 2012//Feb/ 8-9th 1.
1 BROOKHAVEN SCIENCE ASSOCIATES Abstract Magnet and Girder Integration Lewis Doom, NSLS-II Project National Synchrotron Light Source II (NSLS-II) will.
SCU Segmented Cryostat Concept M. Leitner, S. Prestemon, D. Arbelaez, S. Myers September 2 nd, 2014.
20to2T5m100cm Images Van Graves February 13, 2014.
January 30, 2007 Exterior Magnets Concept Blanket and Vacuum Vessel Chamber Integration and Maintenance G. Sviatoslavsky, M. Sawan (UW), A.R. Raffray (UCSD),
1 COMPTON POLARIMETER PRELIMINARY MAGNET DESIGN 06/03/08 Christopher Vidal, Senior Mechanical Designer Ernie Ihloff, P.E., Engineering Group Leader EE.
NSTX NSTX Center Stack Upgrade Ensure fatigue resistant Welds: minimum # of locations shown, could be more. Various Weld Reinforcements & Hardware Replacement.
Beam Line Layout – Cooling Section There seems to be two options for energy measurement: at the 180 dipole and/or in a diagnostic branch at the end of.
Brookhaven - fermilab - berkeley US LHC ACCELERATOR PROJECT LHC IRQ Inner Triplet Review Q1, Q2, and Q3 Mechanics T. Nicol April 24-25, 2007.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory MICE CM29 at RAL, UK February 17, 2011.
ARIES-CS Power Core Configuration Presented by X.R. Wang Contributors: Laila A. Ei-Guebaly, S. Malang, T.K. Mau, Richard Peiperty, A.R. Raffray and L.
We have to fix the design of the flanges on the 1 st horn frame to which the target support beams are attached.
SBS Magnet and Infrastructure Status Robin Wines July 2015.
1.Placement of support base for 70 degree-dipole magnet(D) ・ Support base for 70 degree-dipole magnet(D) should be placed horizontally with a spirit level,
Gen Magnet Design JLAB MENG Contributors: Supervisor: Butch Dillon-Townes Magnet Engineer: Robin Wines Mechanical Designer: Ron Lassiter Mechanical Engineer:
IDS120j WITHOUT RESISTIVE MAGNETS MODIFYING Hg MODULE Nicholas Souchlas, PBL (11/1/2012) 1.
MICE Coupling Coil Fabrication Steps to Complete Allan DeMello Lawrence Berkeley National Laboratory Coupling Coil Working Group January 28, 2014 January.
New Support Structure 4x4 Beams Existing Stairs per Mr Walter Kellner Cherenkov 32 deg shifted back 4.0 inches to clear existing structure Cherenkov 40.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Four OTRs for ATF2 OTR History Current OTR setup New OTR design.
K.Long/G.Barber Mice Tracker Mechanical Status CM20 Feb 08 1 Mice Tracker Mechanical Status Contents:- Tracker 1 Status Tracker 2 Status Further Hardware.
Radiation Shutter Re-Purposing Roy Preece STFC RAL 18 th December 2014.
Metal Work in Masonry Module
HLTS Kickoff Presentation Derek Bridges Bobby Moore July 7, 2011
CLAS12 Beamline Configurations
MICE Partial Return Yoke Mechanical Design
Four OTR Tasks.
Endcap shielding senarios:
EBTF Design Review Technical Meeting Group
TIDVG-4 TIDVG-4 Dump assembly, welding and installation Process sector BA1 February 2017 J. Humbert, (EN/MME) 06/02/2017 J. Humbert, EN-MME.
Update on GEp GEM Background Rates
Hall C Down Stream Beam Pipe And Dump Interface Design
SHMS Downstream Beamline Large SHMS/HMS Angles (Config-1)
HRS at small angles for e+/ e- pair for APEX
SHMS Q2 with Beam Line Shield Pipe
Additional Upstream Coil Shielding
SHMS Beam Line – Large SHMS/HMS Angles
CLEO II Magnet in Hall A for SoLID
SHMS Master Layout-Rays
SHMS Downstream Beamline
XY Scanner Mount.
SoLID SIDIS He3 target collimator optimization
Senad Kudumovic Design engineer
The Mechanical Engineering & Technology (MET)
NPS Status Feb 01, 2019 Paulo M & Steven L.
Neutron guide Shielding Concept
SNS PPU Cryomodule Vacuum Vessel
Beam Halo Considerations for Back Angle Running
Bunker Wall Design Wall ESS
Four Jaw Collimator.
SNS PPU Cryomodule Space Frame
Polarized 3He target installation
SksMinus status 03 HB meeting 2008/5/02 白鳥昂太郎.
Presentation transcript:

Additional Upstream Coil Shielding SHMS Bender Magnet Additional Upstream Coil Shielding 2/4/2019

Target Chamber Spray Angles SHMS Bender Magnet Target Chamber Spray Angles 2/4/2019

Spray Angle Through Chamber Window Target Center 24.5 Inches (62.2 cm) Beam 4.33 Inches (11 cm) 15 Inches (38.1 cm) Tungsten 39° .8 Inches (2 cm) 1916 lb Spray Angle Through Chamber Window 2/4/2019

Beam Spray Angle From Target Target 8.66 Inches (22 cm) Shield Block Illustrating SHMS at Angle of 40° 2/4/2019

Coil Shielding Support SHMS Bender Magnet Coil Shielding Support and Main Shield Block 2/4/2019

Bender Magnet Coil Shielding – Main Block with GEM Slide Assembly Installed 2/4/2019

Bender Magnet Coil Shielding Support $1,360 Mounting Cradle Assembly (Aluminum) Cutout For HMS Snout Support Weldment (Aluminum) $2,330 Steel Adjuster Base Plate Bender Magnet Coil Shielding Support 2/4/2019

Beam Bender Magnet Coil Shielding – Main Block 25.5 Inches 12 Inches Target Center 25.5 Inches (64.8 cm) 12 Inches (30.5 cm) Beam 25.3 Inches (64.3 cm) Lead 1270 lb Bender Magnet Coil Shielding – Main Block with GEM Slide Assembly Installed 2/4/2019

Bender Magnet Coil Shielding – Main Block Main Shield Block will be fabricated in 4 inch thick pieces to reduce cost Revision 12 Inches (30.5 cm) Main Shield Block (Lead) 1270 lbs 3100 in3 3.94 Inches (10 cm) .70 Inches (1.8 cm) Bender Magnet Coil Shielding – Main Block Illustrating clearances between Main Shield Block and existing hardware 2/4/2019

Beam Bender Magnet Coil Shielding 12 Inches (30.5 cm) Lead Shield HMS Snout shown HMS at minimum achievable angle while SHMS is at min angle of 5.5° Beam Bender Magnet Coil Shielding Illustrating SHMS at Min Angle of 5.5° 2/4/2019

Main and Additional Blocks SHMS Bender Magnet Coil Shielding Main and Additional Blocks 2/4/2019

Beam Bender Magnet Coil Shielding – Main and Additional Shield Blocks Target Center 25.5 Inches (64.8 cm) 15.75 Inches (40 cm) Beam 25.3 Inches (64.3 cm) Bender Magnet Coil Shielding – Main and Additional Shield Blocks with GEM Slide Assembly Removed 2/4/2019

GEM Active Slide Assembly Removed 15.75 Inches (40 cm) Main Shield Block will be fabricated in 4 inch thick pieces to reduce cost Revision Main Shield Block Additional Shield Blocks 12.0 Inches (30.5 cm) 3.75 Inches (9.5 cm) Additional Shield Blocks (Lead) 535 lbs 1305 in3 Total .70 Inches (1.8 cm) 1.7 Inches (4.3 cm) Bender Magnet Coil Shielding Blocks Main and Additional Shield Blocks Illustrating clearances between Main and Additional Shield Blocks and existing hardware GEM Active Slide Assembly Removed 2/4/2019

Shielding Block Installation SHMS Bender Magnet Coil Shielding Shielding Block Installation 2/4/2019

Main Shield Block Installation 2/4/2019

Additional Shield Block Installation Main Shield Block Additional Shield Block Installation 2/4/2019

Main Shield Block rests in Support Cradle and is locked in position with fasteners and Upper Tie Plate Additional Shield Blocks rest on Support Cradle and are pinned between Blocks and secured with an Upper Tie Plate 2/4/2019

Full Assembly Configuration Using Main, Additional Shielding Blocks and Neutron Shield with GEM Sieve Slide Assembly Modified Brackets, Lead Shield Removed, Neutron Shield repositioned and attached to the Lead Shielding Assembly (Existing) 2/4/2019

Full HB Lead Shielding / Neutron Shield Option 15.75 Inches (40 cm) 1.44 Inches (3.7 cm) Existing Neutron Shield (New Position) Attached to downstream side of Lead Shielding Assy. Shield aperture is centered vertically and horizontally with aperture in Bender Window and Lead Shield .70 Inches (1.8 cm) Modify Mounting Bracket Full HB Lead Shielding / Neutron Shield Option Configuration illustrating use of Main Shield Block, Additional Shield Blocks and Neutron Shield Neutron Shield must be removed for SHMS to achieve minimum angle of 5.5° 2/4/2019

Full HB Lead Shielding / Neutron Shield Configuration $8,000 Full HB Lead Shielding / Neutron Shield Configuration Configuration illustrating use of Main Shield Block, Additional Shield Blocks and Neutron Shield Neutron Shield must be removed for SHMS to achieve minimum angle of 5.5° 2/4/2019

Shielded Beam Pipe Concepts SHMS Bender Magnet Coil Shielding Shielded Beam Pipe Concepts 2/4/2019

Tungsten Wedge Beam Pipe Concept 2/4/2019

Pavel’s Original Concept Tungsten Wedge Beam Pipe Concept Pavel’s Original Concept 2/4/2019

Tungsten Wedge Beam Pipe Tungsten Wedge Beam Pipe Concept 2/4/2019

Tungsten Wedge Beam Pipe Concept SS Welded Bellows CF Flange / Metal O-ring Existing Beam Pipe (Modified) Shortened with new Mounting Flange and Metal O-ring Tungsten Wedge Beam Pipe Tungsten BP Support Tungsten Wedge Beam Pipe Concept 2/4/2019

Tungsten Wedge Beam Pipe Concept SS Welded Bellows CF Flange / Metal O-ring Existing Beam Pipe (Modified) Tungsten BP Support Tungsten Wedge Beam Pipe Concept 2/4/2019

Tungsten Wedge Beam Pipe Concept Close clearance between Support and HMS Snout Tungsten BP Support Design in a Vertical Adjustment Tungsten Wedge Beam Pipe Concept 2/4/2019

Tungsten Wedge 135 lbs 11.25 4.70 5.25 2 x 2 x ¼ Aluminum 2/4/2019