doc.: IEEE 802.15-<doc#> November 2006 Project: IEEE P802.15 Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG5 Closing Report] Date Submitted: [November. 17, 2006 ] Source: [Chunhui Zhu] Company [Samsung] Address [75 W. Plumeria Dr. San Jose, CA 95132] Voice:[+1 408 544 5667], FAX: [+1 408 544 5666], E-Mail:[c.zhu@samsung.com] Re: [.] Abstract: [Closing Report for the TG5 Interim Session in Dallas, TX] Purpose: [To report the activities of the Task Group 5] Notice: This document has been prepared to assist the IEEE P802.15. It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein. Release: The contributor acknowledges and accepts that this contribution becomes the property of IEEE and may be made publicly available by P802.15. C Zhu / Samsung <author>, <company>
November 2006 TG5 WPAN Mesh November 17, 2006, Dallas, TX Closing Report Meeting Objectives Presentation of additional contributions WPAN Mesh Tutorial Voting for additional contributions Project plan C Zhu / Samsung
Additional contributions November 2006 Additional contributions 3 received Efficient real-time network address allocation mechanisms based concept in mesh network (06/0437r0) By Bae and Jeon Distributed channel time allocation wpan mesh networks (06/0442r0) By Jeon, Choi, Rhee, Lee & Lee Timer based reliable broadcast wpan mesh networks (06/0481r0) By Lee, Cho, Kim, Pyo Each contribution was given 1 hour for presentation and Q&A C Zhu / Samsung
November 2006 WPAN Mesh Tutorial IEEE 802.15.5 Mesh Tutorial (http://www.ieee802.org/802_tutorials/index.htm) IEEE 802 Plenary Tutorial, Tuesday 14, 2006 6:30-8:00PM Presenters: M. Lee (Introduction), S. Max (High rate), C. Zhu (Low rate) Contributors: H. Shao, M. Shim, Y. Liu, J. Zheng C Zhu / Samsung
Selection of the Additional Contributions November 2006 Selection of the Additional Contributions First round of the selection took place on AM1, Thursday. Based on Down-selection document: (06/0349r0) All three proposals passed the low hurdle (20%) ballot vote. All proposals will be given another 60 minutes again in next meeting for presentation. C Zhu / Samsung
November 2006 Project Plan Teleconferences are planned between now and London meeting for Revising the current downselection document because it is not suitable for selecting additional contributions. Discussing and commenting on the additional contributions so that improvements can be done before London meeting. The first teleconference was scheduled on Dec. 13th. Tentative meeting time is 10AM ET (7AM PT, 4PM European time, 11PM Singapore, 12PM Korea) C Zhu / Samsung