Water & Wastewater Construction WWTF improvements, Vibro hammer piles Concord, MA Back Forward.

Slides:



Advertisements
Similar presentations
Confidential. ©ARXX Corporation 2010 Insulating Concrete Forms.
Advertisements

Visalia WCP Trickling Filter Upgrade Project 1994/1995 Trickling Filters, Pump Station and Flow Control Box Modifications.
Water & Wastewater Construction Water Storage Tank, No. Andover, MA Back Forward.
Water & Wastewater Construction Back Forward Wastewater Treatment Plant and Pump Station Improvements, Haverhill, MA.
Preferred Utilities Manufacturing Corp South Street Danbury CT Fuel Oil Handling Systems Tank Gauges and Leak Detection.
October Storm Flows City of Worcester DPW & Parks Department, Sewer Operations Division January 26,2006.
Civil Engineering & Architecture 2.3 Residential Design.
Hargrave Street Pumpstation – Site Preparation July 2014.
Wind Energy Wind power is the conversion of wind energy into a useful form of energy, such as using wind turbines to make electricity, wind mills for mechanical.
John James Audubon Bridge Main Span Materials and Equipment Cement from Thailand Structural Steel from Japan Oscillator from Germany Wind tunnel analysis.
Major Underground Design John Perez. Underground Engineering Design Practices Three Phase Circuit –Infrastructure: Ductbanks & Manholes All three phase.
3-Dimensional Views Existing spillway construction.
Foundation Systems.
Wastewater Treatment & Collection System Improvements.
About Water Purification Station Changgen Yang. Main water purification station. It is too high in this plot, we would like to change to ~4m. It is located.
Educational qualifications and experience required from the technical staff of contracting activities # Activity code Activityeducational qualification.
Chapter 18 Foundations.
Coatings & Lining for Underground Infrastructure.
SEA LEVEL RISE IN MIAMI BEACH MIAMIBEACH. Seawall Construction.
SEA LEVEL RISE IN MIAMI BEACH MIAMIBEACH. Seawall Construction.
Introduction to a pit installation
Board of Education Presentation 2015 Referendum Projects September 9, 2015 Update.
Lakes Creek Road Waste Transfer Station Construction highlights.
Somers Central School District. ams/SchoolPowerNaturally/default. asp?i=9 ams/SchoolPowerNaturally/default.
Domestic Wastewater GPs. Domestic Waste (DW) Staff Permitting ( ) Dennise Judy – Program Manager Chuck LeGros – Section Supervisor Wilmott.
Sanitary Engineering Lecture 14
Massachusetts Public Health Inspector Training Wastewater Certificate Program (MA PHIT WW) Session 2: Permits and Licenses.
.. Point 1: this point was not closed properly so the (x,y) values are not differentially corrected. Point was collected on the SE corner of a large concrete.
$100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300.
Nuclear Power Proposal Colin O’Keeffe. What is Nuclear Energy? A relatively new power source introduced in the early 1970’s A relatively new power source.
Nuclear Power. Fission Uranium-235 Plutonium-239 Neutron 10n10n 10n10n 10n10n Strontium-90 Xenon-144.
Flow Equalization 1.  To overcome operational problems caused by flowrate variations  To improve the performance of the downstream processes  To reduce.
Orthographic Drawings
Neal Klimek Industrial \ Commercial Waste Inspector
AMERICAN SAMOA AIP PROJECTS IN HAND ARFF STATION PAGO PAGO ARFF STATION PAGO PAGO HOT FIRE TRAINING FACILITY FOR PAGO PAGO HOT FIRE TRAINING FACILITY FOR.
09/07/07Shutdown’07 Week 5 F.G. Garcia1 MTA beam line installation Weekly Report September 07, 2007 Period covered: August 31 st to September 7 th (Week.
Toolik Field Station – Annual Meeting – January Construction – Garage 1.
2015 Eastern Oregon Region AWWA/PNCWA Operator’s Conference Water Project of the Year City of Stanfield’s Water System Improvements.
BUILDING CONSTRUCTION
Our Water Systems
City Council Presentation Progress Report No. 12 For September 2006 November 6, 2006.
How Our Earth Sheltered Homes are Constructed Earthlog ® Equity Group, Inc. The American Dream … The Future is Now
Building Committee Presentation March 03, MAIN ENTRANCE.
ELCITA UPDATE March 2017.
ELCITA UPDATE January 2017.
APPLICATIONS OF TECHNOLOGY
UPDATE ON DOE RUN ELEMENTARY CONSTRUCTION PROGRESS
Photo Album by V. Venkatesan.
Foundations Slab & Crawl Foundations
Wastewater Treatment Plant Biological Nutrient Removal & Digester Project - Package 2 Construction Contract City Council Meeting – August 1, 2017 Package.
Flow Equalization Jae K. (Jim) Park Dept. of Civil and Environmental Engineering University of Wisconsin-Madison.
CONSTRUCTION AND WORKING OF TIDAL POWER PLANT BY Prabhakaran.T AP/MECH
To drain in hood 11 7 Attach to water line in hood
MONTHLY STATUS REPORT– May 2013
Stainless Steel Water Well Casing.
Pinole-Hercules Water Pollution Control Plant Upgrade Project
G R E A T L A K E S B U I L D E R S A Re-construction Company Specializing in Structural Remediation and Alterations.
G R E A T L A K E S B U I L D E R S A Re-construction Company Specializing in Structural Remediation and Alterations.
Organics Waste Processing Facility Construction Progress Update December 15, 2010
Minuteman Vocational Technical Regional High School Progress
G R E A T L A K E S B U I L D E R S A Re-construction Company Specializing in Structural Remediation and Alterations.
WASH Objective 1: Affected people have safe and equitable access to a sufficient quantity of water for domestic needs, per sector's standards Indicator.
ELCITA UPDATE July 2016.
Woodlane Timber, Hucknall
Concrete A structural material made by combining cement, sand, aggregate, and water.
Value of contract: Length of contract: Contract start date:

Capitol Hill Historic District Boundary Expansion
ELECTRICITY & MAGNETISM Electrical Resistance (P )
Commission Agenda Item #8
Presentation transcript:

Water & Wastewater Construction WWTF improvements, Vibro hammer piles Concord, MA Back Forward

Water & Wastewater Construction Relocate chlorine & septage, Concord, MA Back Forward

Water & Wastewater Construction Meadow Brook 3 Pump Station, Chelmsford, MA Back Forward

Water & Wastewater Construction Electric base slab. NW corner, Concord, MA Back Forward

Water & Wastewater Construction Concord, MA Back Forward

Water & Wastewater Construction Concord WWTF 9.06 Installing Lagging, Concord, MA Back Forward

Water & Wastewater Construction Tremmie sump, Concord, MA Back Forward

Water & Wastewater Construction Steel rebar, waterstops, new base slab, Concord, MA Back Forward

Water & Wastewater Construction Tremmie sump, Concord, MA Back Forward

Water & Wastewater Construction WWTF Reactors, Concord, MA Back Forward

Water & Wastewater Construction MCC 5A, Concord, MA Back Forward

Water & Wastewater Construction General view new Ops., Concord, MA Back Forward

Water & Wastewater Construction General View from SE., Concord, MA Back Forward

Water & Wastewater Construction New Drain manhole, Concord, MA Back Forward

Water & Wastewater Construction M-2 Magnet Area, Concord, MA Back Forward