37 Simpsons Walk, Horsehay, Telford, Shropshire, TF4 2PA T: 01952 504082 M: 07850 593825 m odular A daptation P ods.co.uk Case Study – Scott Howell In.

Slides:



Advertisements
Similar presentations
MODULAR BUILD - Introduction a. What is Modular Build? b. Basic Components c Standard Dimensions d. Uses Cost Competitive System.
Advertisements

The rate at which work is done.
Welcome to JT News reporting for you. Good afternoon I am TM and here next to me is JI. We are reporting from Cefyn Croes. It is the most powerful onshore.
CE PUWER. Which legislation applies? Which legislation applies? Product legislation Free movement of goods Employment legislation Employee protection.
RETROFITTING OF SPRINKLER SYSTEMS
DOORS AND WINDOWS.
Site Survey.
Arizona Priority Lists Charlie Gohman Az Dept of Commerce Energy Office.
Year 6/7 mental test 5 second questions
Pryda Floor & Rafter Truss Systems
Presentation Heading Air Source Heat Pumps Jordan Jeewood
Showcasing refurbishment: Sheffield Eco-terrace Mat Colmer Head of Housing & Supply Chain.
Introduction – Sue Jacobs, Accommodation Officer, University of Oxford, Accommodation Office The University Website, Inventories and Energy Performance.
SCUBA Diving (3 Credits) by Dr. Yusheng M. Huang
Company Profile National specialized in steel-House technology exploitation, designing, construction, National has had invested 2 million USD at first.
12/2007©Copyright 2007 Desco Industries Inc Mini Zero Volt Ioniser.
FAÇADE RETENTION IN CITY-CENTRE DEVELOPMENT
Hours of Operation: Monday – Thursday 5:30am-7:00pm Friday 5:30am – 5:00pm Closed on Weekends Features: Degreed Health & Fitness Professionals Racquetball.
Peco Facet Sewage Water Treatment Plant
Effectively applying ISO9001:2000 clauses 6 and 7.
INSULATION THICKNESS CALCULATOR. ENERGY EFFICIENCY PERFORMANCE PRINCIPLES THE BUILDING ENVELOPE Components that constitute the building envelope are:
Contents What is The Better Practice Project? What is an Enabling Approach? The evidence for an Enabling Approach The Better Practice Project: A handbook.
Electrical safety Electrical Safety Testing Procedure Content
Tuesday, 10 June 2014GCE Applied Science Unit 3: Energy & the Environment 3.6: Domestic Hot Water Systems Combination or 'combi' boilers This is the most.
Save Energy, Save Money Spring 2012 Richard Davies, MBE Director.
From the big picture to the smallest details, no place does it like the Desmond.
Electrical Safety Electrical Safety In and Around the Home NUECES COUNTY Risk Management Department.
Virginia Department of Conservation and Recreation Adopting a Local Program in Accordance with the Revised Stormwater Regulations Appomattox County February.
Traditional Construction Locally established actions of construction project organizations.
Recycling many plastic waste streams via Powder Impression Moulding (PIM) Presentation to NNFCC Thematic Working Group on Biopolymers 5 th April 2006 Richard.
Customer Service – International dept. STAR 24 3 E.
1 Energy Efficiency By Flexx Rantoa. 2 Where to save.
FACILITIES AND PROPERTY MANAGEMENT – BEMS Plant and Equipment Operating Hours.
Equipment Installation, piping & wiring Variable Water Flow System.
Housing Services Newport City Council. Housing Registers in Newport Newport City Council transferred its stock in March The Housing Management Computer.
Reduce ! Reuse ! Recycle paper, plastics, metals !
1 Business idea: Our business idea is to design & manufacture ready modular minifactories «MOLOKONT ® » for dairy production. Productivity of minifactories.
ISH Innovation 2015 Pre-wall/flushing technology
M.A.P Case Study – Scott Howell In Partnership with.
Daily routine of an engineer Javier Oñate Lagos 27 years old.
AIA Guidelines for Design and Construction of Hospital and Healthcare Facilities Presented By: Michael A. Rogers, PE
Housing Service Review Plan for the coming period 24 November 2014.
1Page # Machine Assembly WBS 700 By: James H. Chrzanowski January 24, 2001.
T. Freemantle Ltd SPECIALISTS IN SLEEVING EXPERTS IN CARTONING FOOD - HOUSEHOLD GOODS - COSMETICS - HEALTHCARE - PHARMACEUTICAL The UK Market Leader Serving.
M EGATON M ODULAR M ULTI -P URPOSE N EUTRINO D ETECTOR Ventilation Cooling Mark A. LaurentiMarch 2002 Modular Configuration.
POSTECH H uman S ystem D esign Lab oratory Chapter 14 LIFETIME HOMES: ACHIEVING ACCESSIBILITY FOR ALL Thu. Kim, Hee-jin.
Timing (minutes) Learning ObjectiveMain tasks / ProcessResources / tools 5TitleStandard Operating Procedures for Power Press Machine Slide 1 5Index 
Intake Team. Who are we? We are a team consisting of Social Workers/Social Care Co-Ordinators, Occupational Therapists and Social Care Officers. Sometimes.
MONEYPOINT STATION. PRODUCTION There are many power stations In Ireland but Moneypoint is the one that produces the most with producing over 25% of Irelands.
Pentrellyncymer Year 5 April ‘Adventurous Activities’ in the curriculum. ‘Adventurous Activities’ in the curriculum. In the curriculum children.
Loft Conversions Bringing you the latest in sprayfoam insulation technology.
Hayesbrook Community Pavilion. Aims St Stephen’s Church offers a variety of activities open to the whole community including Youth Clubs (Young & Old.
Design & Integration Services at the University of Florida
THE FACTORY ACT 1948.
How Completed Interiors Are Achieved: Designing & Building
Power | Case Study The Client
Essem Engineers Beyond the limits…
Asphalt Drum Mixing Plant Asphalt drum mix plantAsphalt drum mix plant is one of the road construction machinery.This plant is well suited for the homogenous.
Carl James Type of building use
Building energy rating (BER) means the energy use for rooms and water heating, lighting as well as ventilation on the basis of standard occupancy. For.
Objective 7.05: RECOGNIZE technological advances in home design
UKRAINE, KYIV REGION, BARYSHIVKA plant was put into operation in 2007
14 Crow Hill Rise, Mansfield
Poswillow Suite, Children's Dental Unit
All Africa Housing (PTY) LTD
Parker domnick hunter. Safety of Electrical and
Shugborough th- 12th May Please turn off all mobile phones.
Stoke Medical Centre RIBA Plan.
RIBA Plan Tom Robinson sir david Swindells Vii
Monday 18th May-Friday 22nd May 2020
Presentation transcript:

37 Simpsons Walk, Horsehay, Telford, Shropshire, TF4 2PA T: M: m odular A daptation P ods.co.uk Case Study – Scott Howell In Partnership with

Scott Howell Scott suffers from Myotubular Myopathy, a rare condition that causes weakness and wasting of muscles. This causes Scott to be confined to a wheelchair and leaves him unable to breathe unaided. He is required to use a ventilator and has the assistance of a carer 24 hours a day. 37 Simpsons Walk, Horsehay, Telford, Shropshire, TF4 2PA T: M:

Scott Howell Building Components was commissioned jointly by Steve Johnston of Wirral Partnership Homes and Paul Rolfe of Wirral Council to supply suitable accommodation for four year old Scott Howell. Scotts existing home was not suitable for conversion so an extension was proposed. Building Components proposal was a MAP (Modular Adaptation Pod) consisting of a bedroom and wet room. The bedroom design needed to accommodate all medical equipment Scott required, this included 30 electrical items all requiring designated power outlets. 37 Simpsons Walk, Horsehay, Telford, Shropshire, TF4 2PA T: M:

Wet room The wet room was designed with a level access shower which was capable of accommodating a 2.0m x 900mm shower trolley. 37 Simpsons Walk, Horsehay, Telford, Shropshire, TF4 2PA T: M:

Manufacture The M.A.P is constructed from light weight steel to meet all current building regulations and is a structural entity, however in this instance the roof strength was increased to accommodate an electrical hoist. The hoist has a capacity of 300kg. 37 Simpsons Walk, Horsehay, Telford, Shropshire, TF4 2PA T: M:

Manufacture The project under Building Components control split into three elements. Firstly, the internal modification to the property was undertaken by WPH due to their knowledge of the housing system. Secondly, the external groundwork and installation was carried out by BC. Thirdly, the manufacture of the M.A.P was carried out by the pod manufacturer. Work started on all three elements simultaneously, TWO weeks after planning approval was given. All three elements were completed TWO weeks later. The installation then took place on the Monday of the third week. 37 Simpsons Walk, Horsehay, Telford, Shropshire, TF4 2PA T: M:

Installation Scott was on site to see his present arrive on the back of an articulated lorry, wrapped in a big blue plastic bag. This was accompanied by an 80 tonne crane. The lift started at 10:45am and by 12:15pm the lights were on and hot water was flowing from the sink tap. 37 Simpsons Walk, Horsehay, Telford, Shropshire, TF4 2PA T: M:

Completion Scott moved in two days later after all of his medical equipment was installed and tested. 37 Simpsons Walk, Horsehay, Telford, Shropshire, TF4 2PA T: M:

The Client 37 Simpsons Walk, Horsehay, Telford, Shropshire, TF4 2PA T: M:

Contact Modular Adaptation Pods 37 Simpsons Walk Horsehay Telford Shropshire TF4 2PA Simpsons Walk, Horsehay, Telford, Shropshire, TF4 2PA T: M: