TWO-WAY SYSTEM WITH UNBONDED TENDONS
EXAMPLE OF A SLAB BAND (Wide Shallow Beam)
EXAMPLE OF A TWO-WAY FLOOR SYSTEM (California)
EXAMPLE OF A ONE-WAY SLAB AND BEAM SYSTEM
FLAT DUCT GROUTED POST-TENSIONING Ngee Ann City, Singapore - BBR
FLAT DUCT GROUTED POST-TENSIONING
STRAND AND FLAT DUCTS FOR GROUTED PT SYSTEM
THREADED FOUR STRAND DUCTS READY FOR LAYOUT
VIEW OF DEAD END
TENDON ARRANGEMENT AROUND COLUMN
LIVE (STRESSING) ENDS AT SLAB EDGE
LIVE (STRESSING) ENDS AT SLAB EDGE
AN ALTERNATIVE FOR DEAD ENDING STRANDS
IMPROVISING TENDON DEAD ENDS
CONSTRUCTION JOINT WITH INTERMEDIATE STRESSING
DUCT SPLICING
UNROLL AND LAYOUT FLAT DUCTS PUSH STRANDS THROUGH EACH DUCT
DEAD END ARRANGEMENT ALTERNATIVE TENDON LAYOUT
ROUND DUCT GROUTED POST-TENSIONING
CONGESTION OF MONOSTRAND ANCNOR DEVICES FOR LARGE POST-TENSIONING FORCES
EXAMPLES OF POST-TENSIONING CONSTRUCTION MISUNDERSTANDING OF STRUCTURAL CONCRETE AND POST-TENSIONING
Thank you for listening
Log file for PT_introduction.ppt 11-30-00 add two jpgs to place holder slide 29, otherwise OK
LIVE (STRESSING) ENDS AT SLAB EDGE
LIVE (STRESSING) ENDS AT SLAB EDGE