Materials Presentation March 7, 2013. New Materials folder located in Pantry 2013 under the Region Specific Folder QMP Detail Sheet QMP Example 155 MIT.

Slides:



Advertisements
Similar presentations
2010, 15th July Hong Kong Convention How to use IHM at SRFs M.Sc Beyza Doyduk – Global Practice Ship Recycling.
Advertisements

New Jersey Election Law Enforcement Commission June 2007 Fair and Clean Elections Pilot Project 2007.
Mn/DOT Combined Smoothness Specification Operator Certification Training Workshop July 12, 2010.
Construction Materials
FHWA Construction Updates David D. Platz, PE, PTOE Construction and Contract Administration Engineer US DOT - FHWA Wisconsin Division, Madison, WI FHWA.
REVISIONS TO ADMINISTRATIVE PROCEDURES ON PROCUREMENT.
CARLIN LAW GROUP, APC Dispute Resolution Procedures Contract Claims Requirements Public Contract Code § (schools) Public Contract Code §20104 Government.
The Office Copier (MFP) Paper Billing Process. Paper Billing Introduction Paper for the Office Copiers is provided free of charge, as long as it is used.
 Examples of bid-splitting Acceptable – When a project involves different trades and is not interdependent on the other. - If you are upgrading a room.
CONTRACT TERMS AND CONDITIONS--COMMERCIAL ITEMS ( ) (FEB 2007)
Joe White (608) Wayne Chase (608) WisDOT Materials Management Section 1.
Buy America Montana Department of Transportation Pat Ernst & Anson Moffett Construction Engineering Services Materials.
PPAP Requirements Training
North Central Region Construction Conference March 7, 2013.
MICHIGAN RIDES ON US 2015 Local Roads Workshop Gaylord March 12, 2015.
Asphalt Rubber Related Specifications Arizona Department of Transportation.
MAJOR REVISIONS TO THE POLICY FOR ACCOMMODATING UTILITIES ON HIGHWAY RIGHTS Presented By: Mark Attaway March 29, 2011.
19 th Annual Audit Division Conference October 7-8, 2010 Orlando, Florida Developing a Checklist Robert Orkin Project QA/QC Manager Parsons Brinckerhoff.
QLF Contract Quality Clauses Working Group QUALITY LEADERSHIP FORUM CONTRACT QUALITY CLAUSES WORKING GROUP Ken Crane MSFC September 24, 2002.
1. 2 Requirements of Combined State Binder Group Method of Acceptance WISCONSIN: The supplier or contractor personnel will obtain samples, under the observation.
Asphalt Quality Assurance Program
2002 FDOT/FTBA Construction Conference
 Quality Management Program (QMP) Review  HTCP Program  IRI News.
Acceptance Process for Manufactured Products by Certification: A users guide for implementation of Materials Bulletin No. MB 06-02, DCE Memorandum No.
Construction Tips & Tricks Stacy Hagenbucher. Common Mistakes on Finals Source Document –Need to reference back to the source document – including tickets.
1 8/29/2015WisDOT BTS MMS.  MIT – Materials Information Tracking (Field Version) Used by WisDOT/Consultant/& Municipal staff in the field to enter a.
11/7/2008 Wisconsin Department of Transportation Bureau of Technical Serviices 1 QMP Specifications QMP base aggregate QMP base aggregate Review and comment.
Florida Department of Transportation 1 Overview of CQC Asphalt Specifications.
Introduction to our On-Line Self Service Center at
The American Recovery and Reinvestment Act of 2009 (ARRA) Federal Highway Administration Wisconsin Division January, 2010 Jason P. Spilak, PE, ARRA Engineer.
Developing a Mixture-Based Specification for Flexible Base.
1 WARFIGHTER SUPPORT STEWARDSHIP EXCELLENCE WORKFORCE DEVELOPMENT WARFIGHTER-FOCUSED, GLOBALLY RESPONSIVE, FISCALLY RESPONSIBLE SUPPLY CHAIN LEADERSHIP.
NC Region Speakers:. Now What?  EBS  Pothole  Vac Truck  T & M  Force Account  Con Mod/Change Order  LCS  QMP (QC, QV, IA)  QC  QV  IA Excavation.
WisDOT Bureau of Technical Sevices Spring 2014 QMP Training Base Compaction SPV’s and Project Design Guidance.
Allen Hughes State Materials Office
 Have an approved mix design before paving.  The department has eliminated the use of PG -22 Asphaltic Material and replaced it with PG -28.  Tack.
2014 NCR Construction Conference Materials Presentation John Brophy Jeff Michalski
 Documentation Requirement  All records should contain sufficient detail to sustain an audit and be clear enough to be read and understood by persons.
Materials Coordinators’ Training. Prefix 155 QMP Summary Report, Preparation Guide.
7 Plant, Materials and Workmanship. 7.1Manner of Execution The Contractor shall carry out the manufacture of Plant, the production and manufacture of.
REVISED May 2009STATE MATERIALS OFFICE Goals in this Session To understand:  The Sampling & Testing process  The Project Certification process  The.
WYDOT CLEARING UTILITIES Keri Bohlmann, P.E. Utilities & DSS Supervisor.
1. 2  QMP Summary Templates in 2015 Pantry. QC Tester Names included on QMP Summary Reports (155). Quantities need to be included on QMP Summary Reports.
Company Confidential Registration Management Committee 1 AS9104/1 Certification Structures July 22, 2015 Tim Lee Chair - IAQG OPMT The Boeing Company RMC.
By Terry Treutel Ride Quality Consultant Former WisDOT Ride Spec Coordinator.
Materials. New for 2014  MITSCAN for concrete pavement thickness acceptance  QMP Density for Base  Lean Government Timeline  WDMP HTCP Training 
Sign Structures Updates: Helpful Tips for Inspectors
Stacy Hagenbucher.  Process Improvements  Clarification  Trends  Finals Tracking  Trends  Why Missing Dates  Additional Resource  Issues on sites.
14 March 2002Update on SDoC - USA1 Update on Supplier’s Declaration of Conformity – USA William Hurst Federal Communications Commission Office of Engineering.
North Carolina General Statute May 2009 Gary Thompson, PLS work
UDOT Approved Products List UDOT Approved Products.
Guidelines for Land Clearing Presented By: SLC Environmental Resources Department.
Contract Compliance Training. Department Personnel Office of the General Counsel (OGC) Mario K. Castillo General Counsel John Guest Deputy General Counsel.
Project Materials Usage and Concerns. Project Materials and Acceptance QC/QA Specifications QC/QA Specifications Quality Control Plans Quality Control.
An Overview of the Asphalt Mixture Performance Tester.
Quantity Calculations Module 3. Quantity Calculations  Specifications  Post Bid Quantity Calculations  Production Quantity Calculations –Checking Yield.
Controlling and Costing Materials
OFFICE OF THE CITY CLERK OCTOBER 24, 2016 CALLING OF THE MARCH 7, 2017 CITY AND PUSD CONSOLIDATED PRIMARY NOMINATING ELECTION AND THE APRIL 18, 2017.
THURSDAY TARGETED TRAINING: Reporting Regulations and Requirements
Acceptance Process for Manufactured Products by Certification:
DSQR Training Supplier Quality Manual
Construction Management
Buy America Good morning All:
OFFICE OF THE CITY CLERK OCTOBER 24, 2016 CALLING OF THE MARCH 7, 2017 CITY AND PUSD CONSOLIDATED PRIMARY NOMINATING ELECTION AND THE APRIL 18, 2017.
Directions: Directions: As you view the slide show you will copy the components to a complete Lab Cover Page. What you see on the next slide you will.
Emulsion Task Force Meeting
This presentation document has been prepared by Vault Intelligence Limited (“Vault") and is intended for off line demonstration, presentation and educational.
This presentation document has been prepared by Vault Intelligence Limited (“Vault") and is intended for off line demonstration, presentation and educational.
Buy America and Utility Work
Presentation transcript:

Materials Presentation March 7, 2013

New Materials folder located in Pantry 2013 under the Region Specific Folder QMP Detail Sheet QMP Example 155 MIT Reports QMP Shells (to be copied onto a MIT 155) New 905 (Materials Diary) added to MIT Report replaces any/all previous Materials Diary spreadsheets/documents

All steel and iron materials permanently incorporated in this project shall be domestic products and all manufacturing and coating processes for these materials must have occurred within the United States. Coating includes epoxy coating, galvanizing, painting and any other coating that protects or enhances the value of a material subject to the requirements of Buy America. The exemption of this requirement is the minimal use of foreign materials if the total cost of such material permanently incorporated in the product does not exceed one- tenth of one percent (1/10 of 1%) of the total contract cost or $2,500.00, whichever is greater. For purposes of this paragraph, the cost is that shown to be the value of the subject products as they are delivered to the project.

Upon completion of the project certify to the engineer, in writing using department form WS4567, that all steel, iron, and coating processes for steel or iron incorporated into the contract work conform to these Buy America provisions. Attach a list of exemptions and their associated costs to the certification form. Department form WS4567 is available at: Attach WS4567 form to a 900 Report

Effective with December 2012 letting Department Verification Testing HMA Frequencies. Changed from 1 per 30,000 tons per mix design to 1 per 5000 tons per mix design.

Effective with December 2012 letting Verification Testing The department will conduct a minimum of one verification test for each 5 contractor QC tests Department Verification Testing The department will perform verification testing as specified in except as follows: - Compressive Strength: a minimum of 1 verification test per lot.

Fill out all sample cards completely and accurately. Region labs will process all samples (ship to Madison or test and report) for all projects if samples are delivered to lab. Miscellaneous sampling supplies located in drop-off room (i.e. sample tags, sample bags, AC cans, tack jugs, cylinder molds etc…). Wis. Rapids drop-off room located next to Region Lab. Drop-off room combination for Wis. Rapids lab provided through CEAs. Rhinelander sample drop-off located in lab entry.

Call the North Central Region Lab prior to HMA paving. Region Lab will do all HMA QV sampling, testing & reporting. AC Samples – coordinate with Pat Shuda in Wis. Rapids and Dean Gritzmacher in Rhinelander to determine who will obtain samples. All Nuclear Gauges must be run across Madisons reference blocks prior to use. Region reference blocks to be used as reference or dispute resolution tool.