Vergabeformen Building Procurement – Contract strategy Procurement Systems – an initial overview Proper choice of delivery system can help to reduce conflicts.

Slides:



Advertisements
Similar presentations
CM/CG Contracting Tom Ravn, Mn/DOT Director, Office of Construction and Innovative Contracting.
Advertisements

Health and Safety Executive Health and Safety Executive CDM 2007 Training Package Session 2 - Clients Version: September 07.
Organization of Primary Entities
CO-OPERATION IN CONSTRUCTION SECTOR CONSTRUCTION CONTRACTS Dr. Judit Gyulay – Dr. Zoltán András Vattai BUTE Department of Construction Technology & Management.
Hussey Fraser Solicitors
057 CONSTRUCTION PRODUCTIVITY (MAJOR INFLUENTIAL FACTORS)
Construction Management. Players Owner – owns project upon completion of construction –Private – owner owns land and pays for construction of facility.
PROJECT MANAGEMENT & BUSINESS PLANNING PROCESS
Design-Build: RISKS OR REWARDS for the Consulting Engineer?
Project Delivery Approaches for Wastewater Utilities in Minnesota June 24, 2008 Metropolitan Council Environment Committee.
CMGC Contracting at UDOT Program, Projects & Lessons Learned
Effective Contract Management - Getting it Right! 24 th January 2007.
Project Delivery Methods. Traditional Owner Design/ Design/Bid/Construction Selection Build Owner’s Vision Owner’s Vision Owner’s Vision Complete Design.
1 Opportunities Related to EPC Initiatives Support Services Management - NWC.
4/28/20151 PRESENTED BY NAKABAGO JOHN CONTRACT MANAGEMENT AND ADMINISTRATION IPPU PRESENTATION JOHN NAKABAGO.
John Boon ZUT November Procurement Systems The organisation of the interaction between the purchaser of a new building and the suppliers of goods.
A Match made in Heaven? Connecting you with a builder.
Utah’s Use of CMGC & Project Delivery
Your Deliver Method... …Pick it Early
Procurement and Tendering Presentation to [NAME OF CLIENT] [YOUR NAME] [DATE]
EPC & EPCM contracting.
Facilities Institute July , 2012 Houston, Texas Click to edit Master title style
ATMES Spring Meeting April 26-27, 2012 Myrtle Beach, South Carolina International Projects.
Alderman Road Residences Phase II Design Build. Extensive master planning preceded this phase 2003 – Dagit Saylor Master Plan Hanbury Evans Update.
KFUPM, Department of Construction Engineering and Management CEM 520 LIABILITY ALLOCATION AMONG THE PARTIES TO FIXED-PRICE CONSTRUCTIN CONTRACTS IN SAUDI.
Delivery Methods  The Players from Handbook of Architectural Practice, Chapter 9.1 by Phillip Bernstein FAIA  Variables from Handbook of Architectural.
Rethinking Construction Review of traditional construction models and a comparison of product development processes with other industries School of Architecture.
THE PROJECT TEAM TYPICAL REQUIREMENTS AND RESPONSIBILITIES OF THE PROJECT TEAM TRADITIONAL TEAM ORGANIZATION AND VARIATIONS THE OWNER’S TEAM THE DESIGN.
Contract strategy Traditional ApproachIncreasing Traditional ApproachIncreasing Accelerated Traditionalintegration Accelerated Traditionalintegration.
KFUPM, Department of Construction Engineering and Management Summary of AN IMPLEMENTATION MODEL FOR DESIGN-BUILD (D-B) PROJECT DELIVERY SYSTEM BY : MOHAMMAD.
I ntroduction Finally… A Best Practice for Selecting Engineers From Vision to Reality Engineering Canada’s Future.
Procurement Systems ARBE121 – PROCUREMENT OPTIONS “The organisational structure adopted by the client for the management of the design and construction.
ARCH 330- Materials/Methods The course will cover the systems associated with construction materials methods and sequencing primarily in building construction.
FIDIC CONFERENCE 2005, BEIJING Workshop 13 Design & Build - Role of Consulting Engineers in the Tender Process Tse Yau Shing.
The Importance of the Qualifications Based Selection (QBS) Process
Honoraria for Design Build Projects Methodology Assessment Matrix.
P ROJECT D ELIVERY M ETHODS. EFCA … is the sole association representing the engineering consultancy and related services industry in Europe represents.
Managing Fast – Tracked Projects: A Review of ECI Report Dr
ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria ARC 807: Professional Practice.
Construction Contracts and Project Delivery Methods
TOPIC-9- PROJECT ORGANIZATION
Risk Management in the Built Environment Management of Risk in Construction By Professor Simon Burtonshaw-Gunn – licensed under the Creative Commons Attribution.
Changing Role Of HRM.
Risk Assignment in The Delivery of a Project  RISK! –Construction projects have lot of it –Contractors manage it –Owners pay for it.
Northwest ASSIST How to obtain maximum value from consultants 3 rd April 2008 Nadine Fry Julian Todd.
Dr. Jana Jagodick Polytechnic of Namibia, 2012 Project Management Chapter 2 Project Management Cycle.
© OECD A joint initiative of the OECD and the European Union, principally financed by the EU Ensuring Good Quality PPP Projects Martin Darcy United Kingdom.
1 PreFair Added value through partnership right from the start.
In the name of Allah the Most Gracious the Most Merciful.
Do you have what it takes to win the next P3 or D-B Project? Steven Kramer, PE Vice President Jacobs.
Role of PM in Airport Projects.  What constitutes a Successful Airport Implementation Programme?  Should the Process of Design and Construction of Airports.
Chapter 6 Organisation and procurement. Learning objectives compare and contrast different organisational structures and their impact on projects discuss.
Unit – I Presentation. Unit – 1 (Introduction to Software Project management) Definition:-  Software project management is the art and science of planning.
Common failures in PPP process management Maarten Groothuis.
The Design/Build Contract. What Is A Design/Build Contract? Contract that combines design & construction into one agreement The design/build team provides.
What you need to know about handling major school works 5 th July 2013.
CDM Construction Design and Management
Edexcel BTEC Level 2 Diploma in Construction Members of the Construction Team Unit 1 Structure of the Construction Industry.
by Awad S. Hanna, Ph. D., P. E. The University of Wisconsin, Madison
The Design Team Carl James.
Profession Practices (ECIV-5105)
Reconstruction site Investigation, Planning, Scheduling, Estimating and Design Eng. Fahmi Tarazi.
Temporary Works Co-ordination
Overview of Project Management
Pre-contract Planning and Practice
PROJECT DELIVERY METHODS
Norfolk Constructing Excellence Awards 2016
Types of Cost Forecasting
Overview of Project Management
Effective Construction Safety Management
Presentation transcript:

Vergabeformen Building Procurement – Contract strategy Procurement Systems – an initial overview Proper choice of delivery system can help to reduce conflicts on construction projects Judit Gyulay

Building Procurement – Contract strategy Budapest University of Technology and EconomicsJudit Gyulay Budapest University of Technology and EconomicsJudit Gyulay Department of Construction Technology and Management Department of Construction Technology and Management Right Building Right Building Right Time Right Time Right Place Right Place Successful Investment

Building Procurement – Contract strategy Budapest University of Technology and EconomicsJudit Gyulay Budapest University of Technology and EconomicsJudit Gyulay Department of Construction Technology and Management Department of Construction Technology and Management Participants of a construction project have different interests Participants of a construction project have different interests Claims and litigations Claims and litigations How to reduce conflicts/risk of construction projects How to reduce conflicts/risk of construction projects One area, generate conflicts: Procurement system (project delivery system) One area, generate conflicts: Procurement system (project delivery system) Possibilities Possibilities Consequences Consequences Contents Of choice the procurement system

Building Procurement – Contract strategy Budapest University of Technology and EconomicsJudit Gyulay Budapest University of Technology and EconomicsJudit Gyulay Department of Construction Technology and Management Department of Construction Technology and Management Civil Engineer/Architect is involved the process in different phases in different phases in different roles in different roles Idea Idea Area Area Money Money Investment Process Initiation Hand-over and use

Building Procurement – Contract strategy Budapest University of Technology and EconomicsJudit Gyulay Budapest University of Technology and EconomicsJudit Gyulay Department of Construction Technology and Management Department of Construction Technology and Management Common goal of participants to perform a building Meeting the clients requirements, ensuring completion On time On time Within cost Within cost To required quality standards To required quality standards

Building Procurement – Contract strategy Budapest University of Technology and EconomicsJudit Gyulay Budapest University of Technology and EconomicsJudit Gyulay Department of Construction Technology and Management Department of Construction Technology and Management (The incompatibility of cost, quality and time) (Kharbanda et al ) Cost Cheapest Economical Reasonable Quality Best Adequate Time Fastest In addition: participants individual interest In addition: participants individual interest

Building Procurement – Contract strategy Budapest University of Technology and EconomicsJudit Gyulay Budapest University of Technology and EconomicsJudit Gyulay Department of Construction Technology and Management Department of Construction Technology and Management Directly involvedclient, designer, contractor Directly involvedclient, designer, contractor Indirectly involvedadvisor, project manager, supervisor Indirectly involvedadvisor, project manager, supervisor Externalbank, authority Externalbank, authority Participants of a construction project

Building Procurement – Contract strategy Budapest University of Technology and EconomicsJudit Gyulay Budapest University of Technology and EconomicsJudit Gyulay Department of Construction Technology and Management Department of Construction Technology and Management Participants – common goal Conflicts, claims and litigation seems to be inevitable part of construction projects Areas generate conflicts One-sided contract (Client drafted contract) One-sided contract (Client drafted contract) Procurement system (project delivery system) Procurement system (project delivery system) Site conditions Site conditions Site services, etc. Site services, etc. But

Building Procurement – Contract strategy Budapest University of Technology and EconomicsJudit Gyulay Budapest University of Technology and EconomicsJudit Gyulay Department of Construction Technology and Management Department of Construction Technology and Management Analysis Not clear understanding peculiarities of that specific procurement and contracting system Not clear understanding peculiarities of that specific procurement and contracting system Responsible parties Responsible parties Does not recognise or Does not want to accept Lack of identification of own interest leads to one-sided contract responsibility

Building Procurement – Contract strategy Budapest University of Technology and EconomicsJudit Gyulay Budapest University of Technology and EconomicsJudit Gyulay Department of Construction Technology and Management Department of Construction Technology and Management The Client Shares: activities Shares: activities responsibilities with the partners risks Will choose procurement system and contract form Will choose procurement system and contract form

Building Procurement – Contract strategy Budapest University of Technology and EconomicsJudit Gyulay Budapest University of Technology and EconomicsJudit Gyulay Department of Construction Technology and Management Department of Construction Technology and Management Procurement: Total management process used when obtaining a building Total management process used when obtaining a building System of contracting among client, designer, and contractor System of contracting among client, designer, and contractor Idea Hand-over and use

Building Procurement – Contract strategy Budapest University of Technology and EconomicsJudit Gyulay Budapest University of Technology and EconomicsJudit Gyulay Department of Construction Technology and Management Department of Construction Technology and Management Planning Planning Organising Organising Leading Leading Commanding Commanding Controlling Controlling P r o j e c tP r o j e c tP r o j e c tP r o j e c t Has to be managed Who will manage? In which system ? To produce /create/perform a building a bridge a road

Building Procurement – Contract strategy Budapest University of Technology and EconomicsJudit Gyulay Budapest University of Technology and EconomicsJudit Gyulay Department of Construction Technology and Management Department of Construction Technology and Management Typical management structure with project manager Typical management structure with project manager Client Project manager Quantity surveyor EngineerArchitectContractor(s) Project co-ordinator (Roger Waterhouse) Typical management structure with project coordinator Typical management structure with project coordinator Client Quantity surveyor EngineerArchitectContractor(s)

Building Procurement – Contract strategy Budapest University of Technology and EconomicsJudit Gyulay Budapest University of Technology and EconomicsJudit Gyulay Department of Construction Technology and Management Department of Construction Technology and Management Clients main decisions: In-house project manager In-house project manager In-house and external project management team In-house and external project management team External project management External project management (Help: principal adviser) Organisation for the Management of the Project Organisation for Design and Construction Traditional Design and build Turnkey Package deal Management Construction Management Management Contracting Others

Building Procurement – Contract strategy Budapest University of Technology and EconomicsJudit Gyulay Budapest University of Technology and EconomicsJudit Gyulay Department of Construction Technology and Management Department of Construction Technology and Management Need of change in procurement methods Traditional Project Management More complex projects Lack of time Client Designer Contractor Client Project Management Preparation Design Tender/bidding Construction Designer Contractor PreparationDesign Tender/bidding Construction

Building Procurement – Contract strategy Budapest University of Technology and EconomicsJudit Gyulay Budapest University of Technology and EconomicsJudit Gyulay Department of Construction Technology and Management Department of Construction Technology and Management Procurement/project delivery system Improper choice or misunderstanding generate conflicts Traditional procurement system Traditional procurement system Design and build, turnkey or others Design and build, turnkey or others Management type Management type

Building Procurement – Contract strategy Budapest University of Technology and EconomicsJudit Gyulay Budapest University of Technology and EconomicsJudit Gyulay Department of Construction Technology and Management Department of Construction Technology and Management Traditional procurement system characteristics Long construction period Long construction period Consecutive organisation Consecutive organisation Clear contracting relations Clear contracting relations

Building Procurement – Contract strategy Budapest University of Technology and EconomicsJudit Gyulay Budapest University of Technology and EconomicsJudit Gyulay Department of Construction Technology and Management Department of Construction Technology and Management Innovative Project delivery systems Construction management Construction management Management contracting Management contracting Project or management service contract and other variations Project or management service contract and other variations General characteristics An organisation is employed to manage the project the construction An organisation is employed to manage the project the construction To coordinate the design with construction To coordinate the design with construction Overlapping between design and construction Overlapping between design and construction Series of tenders: work packages Series of tenders: work packages

Building Procurement – Contract strategy Budapest University of Technology and EconomicsJudit Gyulay Budapest University of Technology and EconomicsJudit Gyulay Department of Construction Technology and Management Department of Construction Technology and Management Client needs representation/protection by neutral expert Traditional deliveryDesign and build systemTurnkey, Package deal Client Designer Contractor Client Designer Contractor Inspector Supervisor Q.S. Inspector Supervisor Subcontractors

Building Procurement – Contract strategy Budapest University of Technology and EconomicsJudit Gyulay Budapest University of Technology and EconomicsJudit Gyulay Department of Construction Technology and Management Department of Construction Technology and Management Design and build turnkey/package deal Characteristics Single point responsibility Single point responsibility Can be overlapped Can be overlapped Client can be sure of maximum cost before final commitment Client can be sure of maximum cost before final commitment Integrated design and construction Integrated design and construction –Improves buildability –Fits to constructors expertise, working condition, organisation PreparationDesign TenderContract Construction Cost costs should be lower shorter time on site Thus (Savings are not passed to the client in lower prices)

Building Procurement – Contract strategy Budapest University of Technology and EconomicsJudit Gyulay Budapest University of Technology and EconomicsJudit Gyulay Department of Construction Technology and Management Department of Construction Technology and Management Construction Management CM Management Contracting MC Client Designer Contractors Client Designer Inspector Supervisor Construction Manager Management Contractor Inspector Supervisor Contractors

Building Procurement – Contract strategy Budapest University of Technology and EconomicsJudit Gyulay Budapest University of Technology and EconomicsJudit Gyulay Department of Construction Technology and Management Department of Construction Technology and Management Management contracts (CM, MC…) Characteristics Management team is involved at early stage Management team is involved at early stage Design can be influenced (buildability) Design can be influenced (buildability) Claims can be solved, delays reduced Claims can be solved, delays reduced Save time – series of tenders, work packages Save time – series of tenders, work packages Flexibility in design to suit the client to suit the budget Flexibility in design to suit the client to suit the budget More risk in design – higher requirement in design More risk in design – higher requirement in design No assured final cost at the start of construction No assured final cost at the start of construction

Building Procurement – Contract strategy Budapest University of Technology and EconomicsJudit Gyulay Budapest University of Technology and EconomicsJudit Gyulay Department of Construction Technology and Management Department of Construction Technology and Management Comparison of procurement systems, source of risks and conflicts Responsibility for decision Responsibility for decision Constriction is started without knowing the construction costs PreparationDesign Tender Construction Cost Start Modern managerial typed system Construction is being started knowing the construction costs PreparationDesign Tender Construction Cost Start Traditional system

Building Procurement – Contract strategy Budapest University of Technology and EconomicsJudit Gyulay Budapest University of Technology and EconomicsJudit Gyulay Department of Construction Technology and Management Department of Construction Technology and Management Consequences Use of non-traditional delivery system can create greater risk of misunderstanding Scope of work / compensation are changing continuously Use of non-traditional delivery system can create greater risk of misunderstanding Scope of work / compensation are changing continuously Innovative project delivery systems can blur the traditional roles and responsibilities of participants Innovative project delivery systems can blur the traditional roles and responsibilities of participants

Building Procurement – Contract strategy Budapest University of Technology and EconomicsJudit Gyulay Budapest University of Technology and EconomicsJudit Gyulay Department of Construction Technology and Management Department of Construction Technology and Management One step towards a successful project To choose appropriate procurement system and appoint the manager as early possible for maximum benefit To choose appropriate procurement system and appoint the manager as early possible for maximum benefit Characteristics of the delivery system have to be understood by the participants Characteristics of the delivery system have to be understood by the participants Contract has to contain reasonable allocation of activities, responsibilities and risk Contract has to contain reasonable allocation of activities, responsibilities and risk All the participants have to recognise responsibilities, act in partnership

Building Procurement – Contract strategy Budapest University of Technology and EconomicsJudit Gyulay Budapest University of Technology and EconomicsJudit Gyulay Department of Construction Technology and Management Department of Construction Technology and Management Procurement Can help to reduce conflicts on construction projects Proper choice and fully understanding of delivery system