Risk Management and Optimal Contract Structures for the CCS-EOR* Value Chain Anna Agarwal, John E. Parsons Center for Energy and Environmental Policy Research.

Slides:



Advertisements
Similar presentations
TWO STEP EQUATIONS 1. SOLVE FOR X 2. DO THE ADDITION STEP FIRST
Advertisements

EcoTherm Plus WGB-K 20 E 4,5 – 20 kW.
Números.
C) between 18 and 27. D) between 27 and 50.
AGVISE Laboratories %Zone or Grid Samples – Northwood laboratory
Chapter 10 Learning Objectives
Fill in missing numbers or operations
Enterprise Risk Management & Capital Budgeting under Dependent Risks: An Integrated Framework Tianyang Wang, Colorado State University (with Jing Ai, The.
Copyright McGraw-Hill/Irwin, 2002 Significance of Resource Pricing Marginal Productivity Theory of Resource Demand MRP as a Demand Schedule Determinants.
Enron Broadband Services
EuroCondens SGB E.
Objectives Know why companies use distribution channels and understand the functions that these channels perform. Learn how channel members interact and.
Carbon Dioxide Emissions Costs and Electricity Resource Planning New Mexico Public Regulation Commission Case No UT March 28, 2007 Presented.
This presentation includes forward-looking statements. Actual future conditions (including economic conditions, energy demand, and energy supply) could.
Joe Chaisson April 21, Integrated Coal Gasification Combined Cycle (IGCC) Power Plants and Geologic Carbon Sequestration Joe Chaisson.
CALENDAR.
Copyright 2008 The McGraw-Hill Companies 20-1 Economic Costs Profits Compared Short-Run Production Relationships Law of Diminishing Returns Short-Run Production.
0 - 0.
1 1  1 =.
1  1 =.
DIVIDING INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
Addition Facts
1 Options. 2 Options Financial Options There are Options and Options - Financial options - Real options.
Change Sust Dev Comm 6 Nov Carbon capture and geological storage for Scotland Stuart Haszeldine University of Edinburgh.
ZMQS ZMQS
Questions and Problems
MA Metal Finishing Forum Tools and Techniques for Optimizing Metal Finishing Process/Environmental MA Metal Finishing Forum Kevin L. Klink, P.E.
The basics for simulations
SB 192 – Oil and Gas Production Tax Rate/Credit Sponsored by Senator Bert Stedman Senate Resources April 9, 2014 SB 192 Senate Resources Presentation by.
Hedging Strategies Using Futures
SPE The Potential For Additional Carbon Dioxide Flooding Projects in the United States SPE April 23, 2008 Hitesh Mohan – INTEK, Inc. Marshall.
Standard Market Design (SMD) in New England Federal Energy Regulation Commission Conference on Standard Market Design January 22, 2002 David LaPlante Vice.
Strategic Meetings Management 101
McGraw-Hill/Irwin Copyright © 2009 by The McGraw-Hill Companies, Inc. All rights reserved.
A Tale of Two Futures: $ versus ¥ Nikkei 225 Index Futures
Chapter 10 Project Cash Flows and Risk
Product and Service Design
Capacity Planning For Products and Services
Transform PV to Load Capacity Status by Coupling PV Plants to CAES Plants James Mason Renewable Energy Research Institute ASES Forum on Solar and the Grid.
Technologies for CCS on Natural Gas Power Systems Satish Reddy April 2104.
Regression with Panel Data
Effects on UK of Eustatic sea Level rise GIS is used to evaluate flood risk. Insurance companies use GIS models to assess likely impact and consequently.
Basis and Price Formation. Basis Basis is the difference between a cash price at a specific location and the price of a particular futures contract. The.
Cost of Capital Chapter 13.
TCCI Barometer March “Establishing a reliable tool for monitoring the financial, business and social activity in the Prefecture of Thessaloniki”
First Solar FuelSmart™: Powering Energy Security
Total Utility Management Services, LLC is committed to helping your organization make the best informed energy decisions with decades of cost-proven results.
Risk Management & Real Options IX. Flexibility in Contracts Stefan Scholtes Judge Institute of Management University of Cambridge MPhil Course
Charging at 120 and 240 Volts 120-Volt Portable Vehicle Charge Cord 240-Volt Home Charge Unit.
Chapter Organisation 6.1 Bond Valuation 6.2 Common Stock Valuation
2011 WINNISQUAM COMMUNITY SURVEY YOUTH RISK BEHAVIOR GRADES 9-12 STUDENTS=1021.
Before Between After.
2011 FRANKLIN COMMUNITY SURVEY YOUTH RISK BEHAVIOR GRADES 9-12 STUDENTS=332.
Market4RES –the policy framework
Addition 1’s to 20.
25 seconds left…...
Week 1.
Number bonds to 10,
Chapter 10 Dealing with Uncertainty Introduction ---exacerbated by regulatory & environmental uncertainty Restructuring of the electric industry,
Static Equilibrium; Elasticity and Fracture
Congestion Management Settlement Credits December, 2002.
A Data Warehouse Mining Tool Stephen Turner Chris Frala
Some Lessons from Capital Market History
Energy Year 2014 Electricity Finnish Energy Industries.
1. 2 Introduction Industry trends Engagement models Governance Innovation Case Study Summary & Wrap Up Agenda.
Financing model for power plants with CCS Carbon Capture and Storage: Perspectives for the Southern Africa Region Johannesburg May 31-June 1, 2011 Nataliya.
Challenges to the Development and Commercialization of CCS Cheyenne A. Alabanzas 2009 ASME Intern University of Alaska – Anchorage.
1 Xi Liang, David Reiner Judge Business School University of Cambridge International Conference on Climate Change Hong Kong May 29 th – 31 st 2007 Financing.
CCS Roadmap People’s Republic of China: The business model for early stage demonstration projects Tony Wood International Team Leader Roadmap for CCS demonstration.
Viability of Carbon Capture and Sequestration Retrofits for Existing Coal- fired Power Plants under an Emission Trading Scheme CEDM Annual Meeting May.
Presentation transcript:

Risk Management and Optimal Contract Structures for the CCS-EOR* Value Chain Anna Agarwal, John E. Parsons Center for Energy and Environmental Policy Research Massachusetts Institute of Technology October 10, 2011 *CCS-EOR stands for Carbon Capture and Storage-Enhanced Oil Recovery

CCS (carbon capture and storage) value chain consists of three key components Capturing CO 2 (at large stationary CO 2 source such as coal-fired power plant) Transporting CO 2 (by pipeline) Storing CO 2 (in geological formations – in oil fields for enhanced oil recovery (EOR)) Source: Bellona Foundation Source: IPCC Report on CCSSource: IEAGHG Weyburn-Midale Project Update 2

CCS is pure cost, enabling financial value captured elsewhere in the value chain. Commercial deployment would require enabling commercial structuring of the value chain. Our Focus: Contract structures to distribute profits and allocate risks among the involved entities. Optimal contract structures maximize the overall project value. Motivation 3

4 We develop a cash-flow model for a prototype CCS-EOR project. Project involves collaboration between two entities: power plant company and oil field company (pipeline jointly owned) Analyze impact of market risks on the CCS-EOR project and evaluate optimal contingent decisions. Evaluate risk-sharing offered by standard contract structures and resulting incentives for optimal decision-making. Approach Coal-fired Power Plant 500MW IGCC with 90% CO 2 Capture Pipeline (dedicated) 50 mile Oil Field 190 million bbl of recoverable oil

Project Risk Exposure (if market risk factors changed 3 years after start of operations) Volatility in oil price is the dominant risk factor. 5

Optimal Contingent Decision-Making example of re-optimizing CO 2 capture rate contingent on oil price Re-optimizing CO 2 capture rate leads to financial gains of $130 million at $30/bbl, and $247 million at $20/bbl. 6 90% at $70/bbl 70% at $50/bbl 60% at $30/bbl No capture below $20/bbl

Key Questions Who bears the different risks along the value chain? Are the ex ante negotiated contract terms still profitable ex post? Are the profit maximizing contingent decisions for the individual entity aligned with the overall project? 7 Lets look at two standard contract structures Fixed price CO 2 contracts Ex ante range of profitable contract prices (per ton CO 2 ): $62 - $ 76 Indexed price CO 2 contracts – indexed to oil price Ex ante range of profitable contract prices (per ton CO 2 ) : 82% - 101% of oil price

Fixed Price ContractsIndexed Price Contracts Risk-Sharing and Incentives - Evaluating Financial Gain by Optimizing CO 2 Capture Rate Fixed price contracts result in conflict of interests, as the power plant company has no incentive to adjust the CO 2 capture rate. Risk-sharing offered by indexed price contracts incentivizes optimal decision-making and creates alignment of interests. 8

Risk-Sharing and Ex post Insolvencies - Evaluating Resulting Ex-post NPV 9 Fixed Price Contracts 90% CO 2 Capture Indexed Price Contracts Optimal CO 2 Capture High risk of ex post insolvency in fixed price contracts can lead to inefficient investment decisions. Risk-sharing through indexed price contracts not only maximizes the project value, it also minimizes the insolvency risks.

Summary 10 Market risks are significant in a CCS-EOR project. Choice of contract determines : Who bears the risks? What incentives does the risk allocation produce? Standard contracts have weaknesses in terms of ex post insolvencies and poor incentive structures that result in sub-optimal project value. Future Work Extend analysis to technical risks such as uncertainty in CO 2 storage operations. Analyze how contracts would evolve as the CCS industry matures.

Thank you 11

Extra Slides 12

Power Plant Overnight Cost$/kW 6,900 Fixed O&M Cost$/kW/year 50 Variable O&M Costmills/kWh 9 Price of Coal$/MMBtu 2 Penalty for CO 2 Emissions$/ton 5 Wholesale Electricity Pricecents/kWh 10 Oil Field Capital Investment$/bbl 5 O&M Cost$/bbl 10 CO 2 Recycle Cost$/ton 30 Price of Oil Recovered$/bbl 75 Royalty Payment (% of oil production value) 12.5% Pipeline Capital Investment$million/mile 1.7 O&M Costs$/ton Project Timeline

14 68% conf. int.95% conf. int.99% conf. int. VolatilityBase caseHighLowHighLowHighLow Oil Price ($/bbl)21% Wholesale Price of Electricity ( ¢ /kWh) 10% Coal Price ($/MMBtu)9% CO 2 Emission Penalty ($/ton CO 2 )47% Ex-post Risk Factor Values

Sensitivity of ex-ante negotiable contract prices Depending on the overnight cost – minimum negotiable price can vary from $11-$73 per ton CO 2. 15

16

17

18 Contractual Profit-Sharing Negotiable Contract Terms $62-$76 per ton CO 2 delivered (for indexed price contracts: 82%-101% of oil price)