NEW COMPLIANCE REGULATIONS

Slides:



Advertisements
Similar presentations
Underground Storage Tanks at Duke Duke Medical Center –8 permitted USTs located on medical campus –Range in size from 2,000 gallons to 30,000 gallons Proper.
Advertisements

Preferred Utilities Manufacturing Corp.
Spill Prevention Control & Countermeasures Compliance and Planning.
Preferred Utilities Manufacturing Corp South Street Danbury CT Fuel Oil Handling Systems Tank Gauges and Leak Detection.
Spill and Overfill Prevention
Passive Leak Detection Operation Training October 2014.
Southwest District Storage Tanks Program presented by Leslie Pedigo Southwest District Storage Tanks Program presented by Leslie Pedigo.
1 MASSACHUSETTS UNDERGROUND STORAGE TANK (UST) PROGRAM Baseline Compliance Assessment 1 MassDEP 8/2/2011.
ACCA Legislative Conference Underground Storage Tank Compliance
PRODUCT LINE LEAK DETECTION Katie Seaborn AMERICAN CONTAINMENT SERVICES, INC. ® Annual GTEC Underground Storage Tank Management & Compliance Seminar -
Diesel Generator Reliability: Lessons Learned from Storms
Dennis Sabre Fire Appliances
5.1.2 Student Book © 2005 Propane Education & Research CouncilPage 1 NFPA 58, LP-Gas Code, sets out the minimum valve and fitting requirements for propane.
3.4.2 Student Book © 2004 Propane Education & Research CouncilPage Types and Functions of Valves and Fittings Used in Bulk Plant Containers and.
OPERATOR, Tester & INSTALLER Licensing WWQRR, Chapter 17, Part L
Overview of the 1.
Release Reporting. Lesson #17 - Release Reporting How Do I Know If I Have a Leak in My UST System?
NFPA 31 Standard for the installation of Oil- Burning Equipment
Staying in Compliance Dispensing Equipment Spill/Overfill Presented by B. J. Benton United Pump and Controls, Inc.
Release Detection for Piping Spring Types of Piping Safe Suction “Unsafe” Suction Pressurized.
EVAPORATIVE EMISSION CONTROL SYSTEMS
Spill and Overfill Prevention Alaska Spring 2004.
TRENTON Casing Filler Presentation
Student Book © 2004 Propane Education & Research CouncilPage Reducing Cargo Tank Vapor Pressure Using a Plant Compressor In order to use.
March Why is MassDEP proposing new UST regulations? DFS’s regulation: standards for tanks construction, installation, O&M, decommissioning and.
MassDEP Underground Storage Tank Program Program Requirements for Owners and Operators Winter 2015 Workshops 1.
Backflow Prevention for Fire Sprinkler Systems State of Illinois Plumbing Code.
Section 4 Ancillary Equipment Section 4 Ancillary Equipment Definition Dispensers & Under Dispenser Containment Vapor Recovery Drop Tube & Fill Port.
Getting The Most Out Of Release Detection Testing National Tanks Conference 2015 Phoenix, Arizona September 15,
PRODUCT LINE LEAK DETECTION (including a summary of the 2015 UST regulations) Katie Seaborn AMERICAN CONTAINMENT SERVICES, INC. ® Annual GTEC Underground.
Workshop on Permanent Closure of Single-Walled USTs and Funding Opportunities For Closure and Cleanup.
Staying in Compliance Inventory Control Bill Greer GTEC.
BY: Winston G. Smith Environmental Engineer UST/PCB & OPA Enforcement & Compliance Section EPA Region 4.
Joe Stapinski Senior UST Inspector (317)
Staying in Compliance Dispensing Equipment Spill/Overfill Presented by Travis Benton United Pump and Controls, Inc.
1 1 Staying in Compliance: Spill and Overfill Presented by: Brent Roth OPW Retail Fueling IPECA UST Seminar 2015.
Release Reporting. How Do I Know If I Have a Leak in My UST System? 1. Unusual operating conditions; such as, erratic behavior of the dispensing pump.
1 Final Rulemaking - Chapter 245, Administration of the Storage Tank and Spill Prevention Program (Subchapters A-H) Environmental Quality Board Meeting.
PREFERRED UTILITIES MFG CORP South St. Danbury CT T: (203) F: (203) www. PREFERRED-MFG.com.
Veeder-Root Company Presents: EPA Compliance Basics Presenters: Bill Tobias, Director of Sales, Veeder-Root Carlton Knowles, Territory Sales Manager, Veeder-Root.
Leak Detection Equipment Tank Tightness Testing Overview Presented by C.J. Schultz Tanknology Inc.
Briefing on Proposed Amendments to Rules for Underground Storage Tank Management, Chapter August 1, 2017.
Edward S. Kubinsky Jr. CROMPCO, LLC
UST Inspection Program
Advanced Environmental Management (AEM) Training Phase I
PRODUCT PIPE LEAK DETECTION
14 Refrigerant Recovery, Recycling, and Recharging.
United Pump and Controls, Inc.
Release Reporting Lesson 17 covers the subject of Release Reporting. You will learn how you know when you have a leak and what leaks require reporting.
Underground Storage Tanks New Federal 2015 Requirements
EVAPORATIVE EMISSION CONTROL SYSTEMS
PRODUCT PIPE LEAK DETECTION
Petroleum Storage Tanks – Program Updates
Staying in Compliance: Spill and Overfill
New Install Proposed rule changes
GTEC 2017 Annual UST Management & Compliance Assistance Seminar
COMPLIANCE CHALLENGES FACING OWNERS OF UNDERGROUND STORAGE TANKS
Alabama Tools Seminars
Introduction to Overfill Prevention for USTs
Overfill Prevention Technology and Maintenance
Presenter : Lee James Girard Interstitial Monitoring
Changes to Chapter , Florida Administrative Code Underground Storage Tank Systems (USTs) Effective – 1/11/2017.
EPA Corrosion Study
TRENTON Casing Filler Presentation
COMPLIANCE VIOLATIONS FOUND DURING INSPECTIONS
Air and Water Management Association Regulatory Conference Symposium
TCEQ’s PST Rulemaking: Adopted Rule Changes
Petroleum Storage Tank Rule Updates Complying with the new PST rules and changes to the PST Compliance Notebook Trade Fair 2018 Rebekah Stanush Compliance.
Petroleum Storage Tanks – Program Updates
Compliance Assistance Specialist
Presentation transcript:

NEW COMPLIANCE REGULATIONS Office of Land Resources Regulated Storage Tanks

Date of inspection (mm/dd/yy) Facility Name: Facility ID Number: Facility Address: Phone Number: Initial each column below the date of inspection to indicate that the device/system was inspected and found to be satisfactory on that date. For those items not applicable for this facility, please indicate “N/A”. Keep this record for no less than one (1) year. Date of inspection (mm/dd/yy) REQUIRED EVERY 30 DAYS Visually check spill prevention equipment for damage. Remove any liquid and/or debris. Check release detection equipment to ensure it is operating with no alarms or unusual operating conditions present. For double-walled spill prevention equipment with interstitial monitoring, check for a leak in the interstitial area. Check for and remove obstructions in the fill pipe. Check the fill cap to make sure it is securely on the fill pipe. Ensure release detection records are reviewed and current. REQUIRED ANNUALLY For double-walled containment sumps with interstitial monitoring, check for leaks in the interstitial area. Visually check containment sumps for damage and leaks to the containment area or a release to the environment. Remove any liquid or debris from containment sumps. Check hand-held release detection equipment, such as groundwater bailers and tank gauge sticks, for operability and serviceability.

30-Day Walk-through Inspection Required every 30 days Visually check spill prevention equipment for damage and remove any liquid and/or debris Check release detection equipment to ensure it is operating with no alarms or unusual operating conditions present

30-Day Walk-through Inspection For double-walled spill prevention equipment with interstitial monitoring, check for a leak in the interstitial area Check for and remove obstructions in the fill pipe Check the fill cap to make sure it is securely on the fill pipe Ensure release detection records are reviewed and current

Annual Requirement For double-walled containment sumps with interstitial monitoring, check for leaks in the interstitial area Visually check containment sumps for damage and leaks to the containment area or a release to the environment Remove any liquid or debris from containment sumps

Keep this record for no less than one (1) year Check hand-held release detection equipment, such as groundwater bailers and tank gauge sticks, for operability and serviceability Additional visual inspection not on the check list: dispenser hoses, nozzles, damage to vent pipes Keep this record for no less than one (1) year

Annual Release Detection Equipment Testing Automatic tank gauge and other controllers Test the alarm Verify the system configuration Test the battery backup Probes and sensors Inspect for residual buildup Ensure any floats move freely Annual Release Detection and Over-fill Prevention Equipment Testing

Annual Release Detection Equipment Testing Ensure shafts are not damaged Ensure the cables are free of kinks and breaks Test the alarm operability and communication with the controller Ensure probes and sensors are positioned properly Annual Release Detection and Over-fill Prevention Equipment Testing

Annual Release Detection Equipment Testing Automatic line leak detector Test operation to ensure the device activates (alarms, restricts flow, or shuts off flow) within an hour when simulating a release to 3 gallons per hour at 10 pounds per square inch (psi) Annual Release Detection and Over-fill Prevention Equipment Testing

Annual Release Detection Equipment Testing Vacuum pumps and pressure gauges Ensure there is proper communication with sensors and the controller Hand-held electronic sampling equipment associated with groundwater and vapor monitoring Ensure the device is calibrated and operates properly Annual Release Detection and Over-fill Prevention Equipment Testing

Over-fill Prevention Equipment Testing Ball float valves Check for presence of ball Overflow prevention valves (flapper valves) Overfill alarm system Test lights and alarm

Spill Bucket and Sump Testing Three Year Spill Bucket Testing STP Sumps, and Dispenser Sumps Testing Installed after July 1, 2007 Used for release detection monitoring Must be hydrostatic tested every three years Water from testing can be reused several times before being disposed of at a recycling facility All spill buckets, along with STP sumps and dispenser sumps installed after July 2007 and used for release detection monitoring, must be hydrostatic tested every three years. Water from the testing can be reused several times before it is disposed of at a recycling facility.

Spill Bucket and Sump Testing Visual examination Water test Fill port cap is tight Use plumbers plug to prevent water entry Fill spill bucket 1½ inches from the top Fill sumps four inches above the highest penetration or seam Measure Visual Examination – Look for any damage, remove or liquid and debris. Fill with water – Before filling spill bucket make sure fill port cap is tight or use a plumber’s plug to prevent water from getting in tank. Fill spill bucket one and a half inches from the top. Sumps will need to be filled four inches above the highest penetration or seam. 3. Measure – Measure to nearest 1/16th inch. Wait 1 hour and measure again. Pass = Less than 1/8 inch change Fail = 1/8 inch or greater change

Spill Bucket and Sump Testing Measure To nearest 1/16 inch Wait one hour Measure again Pass = Less than 1/8 inch change Fail = 1/8 inch or greater change Visual Examination – Look for any damage, remove or liquid and debris. Fill with water – Before filling spill bucket make sure fill port cap is tight or use a plumber’s plug to prevent water from getting in tank. Fill spill bucket one and a half inches from the top. Sumps will need to be filled four inches above the highest penetration or seam. 3. Measure – Measure to nearest 1/16th inch. Wait 1 hour and measure again. Pass = Less than 1/8 inch change Fail = 1/8 inch or greater change

Additional Topics Removal of regulatory deferral of release detection for Emergency Generator USTs New AST registration options 50 percent pipe run replacement rule

Contacts Robert Morgan Sam McDuffie Inspector Supervisor Office of Land Resources Regulated Storage Tanks 501.682.0980 501.682.0973 morganr@adeq.state.ar.us smcduffie@adeq.state.ar.us