FOREN 14-15 June 2012, Hotel Intercontinental Bucharest, The basic contractual structure of a non recourse project financed for renewable projects using.

Slides:



Advertisements
Similar presentations
SALIENT FEATURES OF ISLAMIC FINANCIAL LEASE
Advertisements

1 CLIENT CONSULTANT AGREEMENT. 2 Negotiations Types of Consulting Contracts Standard Form of Contract Form of Contract General Conditions Special Conditions.
ISTISNA AS MODE OF FINANCE
Financing Wind Transactions Financing Wind Power The Future of Energy IPED Conference July 25-27, 2007.
1 CRITICAL TAX ISSUES IN TODAYS HOUSING TAX CREDIT TRANSACTIONS: DEFERRED DEVELOPMENT FEES San Francisco, California July 24-25, 2008 Molly R. Bryson.
Indian Institute of Management, Ahmedabad
Financing Essentials for Public-Private Partnerships United Nations SU/SSC Training Course September 19, 2006.
The three most important considerations for development of wind farms are: LAND with good to excellent wind resource CONTRACT to sell electricity produced.
Energy Service Fossil Product Portfolio
African Legal Support Facility/Pan-African Lawyers Union (ALSF/PALU)
Bank Guarantees and Indemnities 26 th August 2013 Abdul Yassim Vice President Trade and Working Capital 1 Absa presentation title Date of presentation.
Nabil dmaidi1 Miller Act H Enacted in 1935 H Federal Contracts over $25,000 H Contractor shall provide Bonds H Performance Bonds in the amount to protect.
AN OVERVIEW OF PROJECT FINANCE IN PRIVATE-PUBLIC PARTNERSHIPS FINANCE 101 T ERRI S MALINSKY Managing Director B.C.
Risk Identification, Mitigation and Key Documents in Infrastructure Projects. Presentation by Mohit Saraf Partner Luthra & Luthra Law Offices May 01,
Simon Par Keeling, Société Générale Paris
FINANCING LNG PROJECTS. Contracting for and financing LNG assets April 2006.
EPC & EPCM contracting.
MBA (Trimester) Term V Module Title : Project Finance and Management
Module five: Session Two M5S21. Training objective To review the various financing options available to road contractors M5S22.
Energy Performance Contracting Approach David Birr President Synchronous Energy Solutions.
1 Extended Duration Warranties, Performance Warranties, and Liquidated Damages in Construction Contracts – What are the Risks? Presented by: Gene Rash.
 Fifth Third Bank | All Rights Reserved Vessel Financing Choices for Ferry Operators.
Experience with PPP projects in Europe Vilnius 22 th November 2006 Dr. Christian Kummert, DEPFA BANK plc.
Small Farm Profitability: Is Wind Energy the Answer? 1
Wind Turbine Lease Considerations for Landowners Dwight Aakre Ron Haugen February 2010.
ACTION PROPOSAL FOR FLYWHEEL ENERGY TECHNOLOGY Enhance future grid reliability, interoperability, & extreme event protection In 20 years, the flywheel.
INVESTMENT AND FINANCING OF RENEWABLE ENERGY PROJECTS
OPPORTUNITIES AND CHALLENGES PRESENTED BY FEEDSTOCK IN THE FINANCING OF BIOREFINERY, BIOCHEMICAL AND BIOBASED PRODUCT MANUFACTURING PROJECTS John Kirkwood.
Technical Due Diligence Renewable Energy We build with Passion!
Overview of Legal Issues in Renewable Energy Projects Renewable Energy Summit 2009 Ainsley Heffernan Partner, Beauchamps Solicitors. Dundalk, 21 st January.
Boreal Renewable Energy Development Ferriter Scobbo & Rodophele PC Outback Engineering Richard C. Gross, Inc. March 12, 2009 Notus Clean Energy LLC Wind.
4/2/08Version Adapted for use by ASFMRA 1 of 28 Ag Land Management Business Ownership Structure.
Financing of Infrastructure Projects:
Construction Contracts and Project Delivery Methods
Development and Construction of On- Shore Windfarms Andrew Aveyard Green Cat Renewables Jim Wilkinson CA Blackwells.
The project finance termsheet Broad characteristics: 12 mln USD for expansion of power plant. Two year grace (construction) period, reimbursement over.
Session 3: Project Development Agenda The Voice of a Technologist Utility Project Development Reliability Concepts Residential Project Development Homework.
CONSTRUCTION CONTRACTS PRIME CONTRACTS Format and Major Components CHAPTER - 4.
Energy for the Future Belene Nuclear Power Plant Project Status.
Joint Venture Agreements. Joint Ventures Joint Venture (JV) : Two or more construction contractors jointly competing for a particular project pooling.
Riga 4th December 2008 Renewable energy: is there a Latvian masterplan? Ieva Indriksone Riga Graduate School of Law.
Counter trade. Counter trade means exchanging goods or services which are paid for, in whole or part, with other goods or services, rather than with money.
1 Experience from Finland Christian Llull, Ho Chi Minh City, 23rd November 2015 ? Cooperation & Partnership in Wind Project Development.
Briefing to the Portfolio Committee on the Comparison on Procurement Methodologies 6 June 2006.
Chapter 11 Contingency. Contingent 1.concept: past transactions or events of a situation, the results by the occurrence of uncertain future events occur.
By Khalil T. Hasan Construction Solutions ( Joint Operation/Administration of multiple FIDIC Forms – A Case Study.
Session 22 (R) Utility Scale Solar Development Power Purchase Agreements (PPAs) April 04, 2016.
HOW TO PROTECT YOUR INTEREST IN A SALE CONTRACT Focus on what you “get” when you sign!
Wind Prospect Experience and Practicalities of Wind Energy International Cooperation Forum for Energy Service Companies (ESCO’s) - Opportunities in China.
Ratio Analysis…. Types of ratios…  Performance Ratios: Return on capital employed. (Income Statement and Balance Sheet) Gross profit margin (Income Statement)
Building Capacity of SMEs for Participation in Public Procurement Draft Presentation for Training of Trainers June 2014.
ROMANIA NATIONAL NATURAL GAS REGULATORY AUTHORITY Public Service Obligations in Romanian Gas Sector Ligia Medrea General Manager – Authorizing, Licensing,
Lecture 11: Methods of Payments p. 2 Bank Guarantees
Planning and Realisation of Wind Farms
What Small and Emerging Contractors Need to Know Understanding the Basics of Contract Surety Bonds © Copyright 2016 NASBP.
Introduction to FIDIC - Manuals
EPC Contracts and Project Finance in Power & Water Projects The perspective of the sponsors … and lenders Sebastien BERNARD General Counsel, Middle East.
Administration of a FIDIC Contract - Project Control
Financing projects on maritime domain
Particular Conditions of Contract & Appendix to Tender
Particular Conditions of Contract & Appendix to Tender
Understanding Bonding Requirements
LEASING.
ESCL – ANNUAL CONFERENCE 25 OCTOBER 2018 EDWINA UDRESCU, FCIArb Lawyer
Infrastructure Development in India: Opportunities for Co-operation with Europe Presentation by Mohit Saraf Partner Luthra & Luthra Law Offices.
“Bankable” Construction Contracts
How Small Developers and EPC Contractors Can Add PPA Financing to their Arsenals John Langhus, VP Business Development Midwest Solar Expo 2019 New Energy.
Luxembourg Workshop on Space and Satellite Communication Law,
Funder Preferred Risk Allocation
National Waterways Conference
Presentation transcript:

FOREN June 2012, Hotel Intercontinental Bucharest, The basic contractual structure of a non recourse project financed for renewable projects using an EPC contract. Robert Ghelasi Director of Energy Department Capital Partners

The following diagram illustrates the basic contractual structure of a non recourse project financed wind farm project using an EPC contract.

Project Company (SPV) Project Company (SPV) Sponsors Local Public Authorities Financial Institutions EPC Contractor EPC Contractor O&M Contractor O&M Contractor Network Distributor Network Distributor O&M Contracts Connection Agreement PPA + GCPA Financing and Security Agreements Concession Agreement Equity Support Agreement EPC Contract Power Offtaker Green Certificates Offtaker Sub-contractor Consultants/Advisers Superficies Agreement Tripartite Agreements Partner 1 Partner 2 Other equity investors Technical Advisor Sponsor decision – wind farms needed to be located on sites that have with adjacent land uses Sponsor decision – wind farms needed to be located on sites that have with adjacent land uses Community acceptance and compatibility with adjacent land uses strong, steady winds throughout the year, including extreme wind conditions. Romania has one of the Europes best wind resources especially along the Black Sea Coast. good road access with adequate capacity to serve the wind plant (distance to publicly accessible areas) and spacing between turbines Seismic activity, noise constraints, altitude, corrosion, and extreme temperatures Environmental impact, including avian, bat and other biological considerations proximity to the electricity grid. Operation services Control room operation (24h/7d) Remote monitoring Call centers Metering Energy management & automation Maintenance services Field services Preventive & corrective maintenance Repairs Emergency response Inspection Spare part management

The recourse is limited both in terms of when it can occur and how much the sponsors are forced to contribute. In practice, true non-recourse financing is rare. In most projects the sponsors are obliged to contribute additional equity in certain defined situations. Project financing is a generic term that refers to financing secured only by the assets of the project itself. Therefore, the revenue generated by the project must be sufficient to support the financing. Project financing can be non-recourse financing or limited recourse financing.

A construction contract for a wind farm includes various elements, from manufacture of the blades and towers and assembly of the nacelles and hubs and construction of the balance of the plant comprising civil and electrical works. There are a number of contractual approaches that can be taken to construct a wind farm. An EPC contract is one approach. A construction contract for a wind farm includes various elements, from manufacture of the blades and towers and assembly of the nacelles and hubs and construction of the balance of the plant comprising civil and electrical works. There are a number of contractual approaches that can be taken to construct a wind farm. An EPC contract is one approach. Another option is to have three separate contracts: Wind Turbine Generator (WTC) supply contract; Balance of Plant (BOP) contract; Warranty Operating and Maintenance Agreement (WOM). Balance of Plant (BOP) is the infrastructure of a wind farm project, in other words all elements of the wind farm, excluding the turbines. Includes civil works, SCADA and internal electrical system. It may also include elements of the grid connection. Another option is to have three separate contracts: Wind Turbine Generator (WTC) supply contract; Balance of Plant (BOP) contract; Warranty Operating and Maintenance Agreement (WOM). Balance of Plant (BOP) is the infrastructure of a wind farm project, in other words all elements of the wind farm, excluding the turbines. Includes civil works, SCADA and internal electrical system. It may also include elements of the grid connection.

Interestingly, on large project financed wind farm projects the contractor is increasingly becoming one of the sponsors, ie an equity participant in the project company. Contractors will ordinarily sell down their interest after financial close because, generally speaking, contractors will not wish to tie up their capital in operating projects. Interestingly, on large project financed wind farm projects the contractor is increasingly becoming one of the sponsors, ie an equity participant in the project company. Contractors will ordinarily sell down their interest after financial close because, generally speaking, contractors will not wish to tie up their capital in operating projects. The choice of contracting approach will depend on number of factors including: the time available the lender requirements the identity of the contractor(s). The major advantage of the EPC contract over the other possible approaches is that it provides for a single point of responsibility. The choice of contracting approach will depend on number of factors including: the time available the lender requirements the identity of the contractor(s). The major advantage of the EPC contract over the other possible approaches is that it provides for a single point of responsibility.

In assessing bankability, lenders will look at a range of factors and assess a contract as a whole. Restrictions on the ability of the contractor to claim extension of time and additional costs; A fixed completion date; A fixed completion price; No or limited technology risk; Output guarantees; Liquidated damages for both delay and performance ; Security from the contractor and/or its parent; Large caps on liability (ideally, there would be no caps on liability, however, given the nature of EPC contracting and the risks to the contractors involved there are almost always caps on liability);

This is one of the major reasons why they are the predominant form of construction contract used on large-scale project financed power and infrastructure projects. An EPC contract delivers all of the requirements listed above in one integrated package, being designed to satisfy the lenders requirements for bankability.

E E C C C C P P Engineering Applying acquired knowledge and experience to efficiently Design The wind farm according to requirements Engineering Applying acquired knowledge and experience to efficiently Design The wind farm according to requirements Procurement Supplying of equipment at the best possible cost to meet the needs of the project in terms of quality, quantity time and location Procurement Supplying of equipment at the best possible cost to meet the needs of the project in terms of quality, quantity time and location Construction Building and assemblying the ifrastructure and the equipment. Requires competive costs, carefull planning of works and materials, QHSE awareness, etc Construction Building and assemblying the ifrastructure and the equipment. Requires competive costs, carefull planning of works and materials, QHSE awareness, etc Contract EPC Contracting - Abbreviation

Supplier EPC Technical Advisor EPC Contracting – Scenarios The sponsor and lenders sign separate contracts with the EPC contractor (BoP) and the Equipment supplier; An Interface Table regulates the responsibilities between the involved parties; The supplier warranties the equipment and optionally, maintains theequipment under a long term contract; The EPC Contractor warranties the infrastructure; The sponsor and lenders sign separate contracts with the EPC contractor (BoP) and the Equipment supplier; An Interface Table regulates the responsibilities between the involved parties; The supplier warranties the equipment and optionally, maintains theequipment under a long term contract; The EPC Contractor warranties the infrastructure; Scenario 1 Project Company Financing

The Sponsor and the Lenders sign one contract with the EPC Contractor ; The Supplier sign also a contract with the EPC Contractor ; The Interface Table regulates the responsibilities between the involved parties. The EPC Contractor warranties the project; Optionally the Supplier maintains the equipment under a long term contract; The Sponsor and the Lenders sign one contract with the EPC Contractor ; The Supplier sign also a contract with the EPC Contractor ; The Interface Table regulates the responsibilities between the involved parties. The EPC Contractor warranties the project; Optionally the Supplier maintains the equipment under a long term contract; Scenario 2 Supplier EPC Technical Advisor Project Company Financing

Professional liability insurance (PLI), also commonly known as errors & omissions (E&O) in the US, is a form of liability insurance that helps protect the professional advice and service by EPC contractor from bearing the full cost of remedying works because of fault design. EPC Contracting – Project Insurance Coverage FIDIC is acronym for the International Federation of Consulting Engineers. The FIDIC forms are the most widely used forms of contract internationally, including by the World Bank for its projects. EPC Contracting – FIDIC Contract form It is best known for its range of standard conditions of contract for: Conditions of Short Form of Contract (the Green Book). Conditions of Contract for Construction for Building and Engineering Works Designed by the Employer (Red Book); Conditions of Contract for Plant and Design-Build (Yellow Book); Conditions of Contract for EPC/Turnkey Projects (Silver Book)

The contractor is responsible for all design, engineering, procurement, construction, commissioning and testing activities. Therefore, if any problems occur the project company need only look to one party – the contractor – to both fix the problem and provide compensation. As a result, if the contractor is a consortium comprising several entities, the EPC contract must state that those entities are jointly and severally liable to the project company. A single point of responsibility. Risk of cost overruns and the benefit of any cost savings are to the contractor s account. The contractor usually has a limited ability to claim additional money, which is limited to circumstances A fixed contract price EPC contracts include a guaranteed completion date that is either a fixed date or a fixed period after the commencement of the EPC contract. If this date is not met the contractor is liable for Delay Liquidated Damages (DLDs). DLDs are designed to compensate the project company for loss and damage suffered as a result of late completion of the wind farm. A fixed completion date

The project companys revenue will be earned by operating the wind farm. Therefore, it is vital that the wind farm performs as required in terms of output and reliability. Therefore, EPC contracts contain performance guarantees, payable by the contractor if it fails to meet the performance guarantees. These performance guarantees usually comprise a guaranteed power curve and an availability guarantee guaranteeing the level of generation of electricity Performance guarantees Most EPC contractors will not, as a matter of company policy, enter into contracts with unlimited liability. Therefore, EPC contracts for power projects cap the contractors liability at a percentage of the contract price. This varies from project to project. Caps on liability.

It is standard for the contractor to provide performance security to protect the project company if the contractor does not comply with its obligations under the EPC contract. The security takes a number of forms including: Security A bank performance guarantee for a percentage, normally in the range of 5–15%, of the contract price. The actual percentage will depend on a number of factors including: Retention Money Guarantee, ie withholding a percentage (usually 5%–10%) of each payment. Advance payment guarantee, if an advance payment is made A parent company guarantee - this is a guarantee from the ultimate parent (or other suitable related entity) of the contractor, which provides that it will perform the contractor s obligations if, for whatever reason, the contractor does not perform the other security available to the project company; the payment schedule (because the greater the percentage of the contract price unpaid by the project company, the smaller the bank guarantee can be); the identity of the contractor and the risk of it not properly performing its obligations; the price of the bank guarantee and the extent of the technology risk;

Vă mulţumesc, Robert Ghelasi Director Energy Department Capital Partners Mobil: