Ultrasonic In-line Inspection Technology and Fitness-For-Service Assessment for Non-Traditional Pipeline Inspection Applications Dan Revelle.

Slides:



Advertisements
Similar presentations
Different solutions to inspect platform risers By: Robert van Agthoven (Part I) Manager Marketing & Sales PS-PIT Rotterdam, The Netherlands Charles Lawther.
Advertisements

1 Perspectives from Operating a Large Scale Website Dennis Lee VP Technical Operations, Marchex.
 Established in 1995  Located in Wilmington, NC with a 40,000 Sqft facility.  Specializes in the design and manufacturing of connection solutions. 
HP Quality Center Overview.
REMOTE MEASUREMENT OF STRESS IN FERROMAGNETIC PIPELINES Motivation Ageing global pipeline infrastructure Non-invasive, remote, pipeline integrity assessment.
Materials and Joining March 2005 R&D Forum David Horsley TransCanada Pipelines Limited.
Pigs Unlimited, Inc. Introduces….
PORTABLE TEMPORARY PIG LAUNCHER thomas cornthwaite
TransCanada Corporation (TSX/NYSE: TRP)
Lean Operations for Water and Wasterwater Controlling Cost While Improving Efficiency… A Real World View.
1 Software Testing and Quality Assurance Lecture 30 – Testing Systems.
 MODERN DATABASE MANAGEMENT SYSTEMS OVERVIEW BY ENGINEER BILAL AHMAD
StaffCV Recruitment Management Solution A New Paradigm In Recruiting StaffCV Recruitment Management Solution A New Paradigm In Recruiting.
3P Services, Germany Basil Hostage
1 Philip Sher Connecticut Department of Public Utility Control Gas Pipeline Safety Unit RepresentingNAPSR National Association of Pipeline Safety Representatives.
Achieving Better Reliability With Software Reliability Engineering Russel D’Souza Russel D’Souza.
Teezle TMatics M2M Platform & Solutions Overview January 28 th, 2014.
Engineering Doctorate – Nuclear Materials Development of Advanced Defect Assessment Methods Involving Weld Residual Stresses If using an image in the.
PIPELINE ENGINEERING Multi-Diameter Pigging – Factors affecting the design and selection of pigging tools for multi-diameter.
Teaching material for a course in Software Project Management & Software Engineering – part II.
VisiMix Pipe Line VisiMix Ltd, PO Box 45170, Jerusalem, 91450, Israel Tel: Fax:
High strength materials are being increasingly used in designing critical components to save weight or meet difficult service conditions. Unfortunately.
OBTAINING QUALITY MILL PERFORMANCE Dan Miller
ICDA of Gas Transmission, Gathering & Storage Systems GOAL: Develop a protocol for Validation of dry gas ICDA method: –Identify data needs –Develop procedures.
RADIATION SOURCE Design Review Dmitry Gudkov BE-BI-ML.
Can Technology Save Us? R&D efforts to advance inspection technology Bruce Nestleroth Research Leader
HCAs & Pipeline Assessment Intervals Is There a Need for Change? Richard B. Kuprewicz President, Accufacts Inc. For Pipeline Safety Trust New Orleans Conference.
March 2004 At A Glance autoProducts is an automated flight dynamics product generation system. It provides a mission flight operations team with the capability.
Ensuring Success in Integrity Management Marty Matheson American Petroleum Institute July 24, 2002.
METAL LOSS IN-LINE INSPECTION SURVEYS LIMITS AND INACCURACIES.
A Framework for Your Pipeline Integrity Program. 2 A Few Thoughts Before Beginning l This rule is new to the pipeline industry although many of the concepts.
Mechanical Properties of Materials
William Prosser April 15, Introduction to Probability of Detection (POD) for Nondestructive Evaluation (NDE) This briefing is for status only and.
Mechanical Engineering - Design, Drafting & 3D Modeling Mechanical 3D Modelling | Voice: What is.
4/28/2017 Stress Corrosion Cracking Assessment in Pipeline Mohammed Abu Four October 11, 2010.
Creo Spec-Driven Piping
CONSISTENCY - RELIABILITY - EXCELLENT WORKMANSHIP
AXUG Partner Showcase – Introducing Preactor
Claims Leakage Control
CONSISTENCY - RELIABILITY - EXCELLENT WORKMANSHIP
CONSISTENCY - RELIABILITY - EXCELLENT WORKMANSHIP
CASING.
An oil company in Canada
What is it ? …all via a single, proven Platform-as-a-Service.
Creo Spec-Driven Piping
CONSISTENCY - RELIABILITY - EXCELLENT WORKMANSHIP
CIM Modeling for E&U - (Short Version)
March 9th, 2015 Maxime Lapalme Nazim Ould-Brahim
CONSISTENCY - RELIABILITY - EXCELLENT WORKMANSHIP
OVERVIEW Impact of Modelling and simulation in Mechatronics system
CONSISTENCY - RELIABILITY - EXCELLENT WORKMANSHIP
Manufacturing system design (MSD)
Mobile workforce management solution
Maximize the value of your cloud
Johanna Rothman Create Technical Excellence Chapter 9
Smarter Analytics An oil and gas producer in Canada improves safety and reliability with insights into equipment failure and preventive maintenance USD478,000.
326MAE (Stress and Dynamic Analysis) 340MAE (Extended Stress and Dynamic Analysis)
TransCAD Vehicle Routing 2018/11/29.
Single Event Violations
“Are Intelligent Pigs Intelligent enough?” PSC th March 2018
TRENTON Casing Filler Presentation
ME 535 Final Project Proposal
CONSISTENCY - RELIABILITY - EXCELLENT WORKMANSHIP
Knowing When to Stop: An Examination of Methods to Minimize the False Negative Risk of Automated Abort Triggers RAM XI Training Summit October 2018 Patrick.
Applying Use Cases (Chapters 25,26)
CONSISTENCY - RELIABILITY - EXCELLENT WORKMANSHIP
Biological Science Applications in Agriculture
GATORADE MX Production
Pipeline Integrity Management Programs
Gas Transmission Pipelines
Presentation transcript:

Ultrasonic In-line Inspection Technology and Fitness-For-Service Assessment for Non-Traditional Pipeline Inspection Applications Dan Revelle

Unpiggable Pipelines1 Small Diameter Bore Restrictions Small Radius Bends Back-to-Back Bends Mitered bends Unbarred Tees Y Connections Diameter Changes No Launcher or Receiver Steep and Vertical Sections Thick or Thin Walled Pipe Deadlegs, crossovers and laterals 1Unpiggable Pipelines presented by Shie, Koch and Bubenik at PPIM 2010

Unpiggable Options Direct Assessment (includes guided wave and localized UT) Guided wave is a screening tool with limited range. Not suitable for assessment of defects that exist in the line. In-line inspection can gather many more readings and localized UT or other point measurements. Hydrostatic Testing Achieves regulatory compliance, but does not assess features are not at pressure failure threshold. Pinhole leaks Dents, gouges, blisters, sloping laminations Defects with burst pressures above hydrotest pressure Modifying Line Still have to run inspection. Integrity management program still benefits from high resolution dataset. Excavations are expensive, so cost can limit the amount/quality of external inspection data

Ease of Inspection How to get the best assessment of the integrity of the pipeline? Evaluate entire project Line modifications and setup Operational complexity during inspection Launch, receive, pumping requirements, HS&E Which anomalies are and are not detectable Inspection data validation Precision and detail of pipeline features Timing and flexibility of entire process Does action need to be taken while the pipeline is out of service?

High Resolution Data Set Integrated Level 2 assessment for maximum utilization of high resolution ultrasonic dataset Ultrasonic data is very well suited to Level 2 effective area assessment Can run an automated effective area assessment independent of any flaw boxing Does not reduce a complex corrosion area to just the two parameters of depth and length. Measured Wall Thickness Calculated Remaining Strength Factor (RSF)

Interaction of Corrosion Areas Accurate profiling of corrosion allows for accurate assessment both individual defects and of defect interaction. Corrosion modeling can be applied to the individual defect profiles. Effective area calculation quantifies load carrying capacity of the specific section of pipe. Interaction between defects is calculated according to the individual profile of all defects involved. Interacting flaw screen shot from actual 12” InVista inspection data (Red Line)

What is Conservative? The relationship between the cost of achieving nearly 100% reliability and knowledge about the condition of the pipeline [2]. The hypothetical (and unachievable) extreme of “perfect knowledge” corresponds to the case where the operator knows the precise time and location of each future failure, and remediates immediately before each incident. The opposite extreme corresponds to the case where the operator knows nothing about the condition of the pipe and whose integrity management program consists of random digs. The traditional so-called conservative assessment leads to a significant number of false positives, which consume the integrity budget without achieving the desired level of reliability. When applying more accurate advanced models, a high level of reliability can be achieved at a lower cost. Hydrotest does not address: Ongoing corrosion – does not provide information about defects that do not fail. Through-wall leak – small areas of corrosion may not fail, even if almost already through-wall. Dents - fail due to cyclic loading Cracks – hydrotest can worsen existing cracks that are not yet large enough to cause a failure. Perfect regulatory compliance does not guarantee conservatism. Hydrotest gives regulatory compliance, but does not give information beyond ability to hold pressure at a single point in time.

Conservative Integrity Management Repairing all anomalies to an arbitrary threshold uses finite resources that could be more effectively spent on other parts of an integrity management program High resolution data can lead to more accurate assessment results and prioritization. Rapid data analysis and assessment can lead to cost savings in remediation of line while it is still out of service. Are pipelines not inspected because there is not capacity to perform all of the potential repairs that might be necessary? What data can be fed back into risk models to help quantify risk across an entire pipeline system?

Why is Accuracy Important? Critical flaw size estimated from simplified analysis. Hydrostatic testing has traditionally been used to “detect” cracks. A simplified fracture mechanics analysis is typically used to estimate the largest flaw that survived the test. However, the simplified analysis usually underestimates the critical flaw size. Thus significantly larger-than-expected flaws survive the test. Critical flaw size @ test pressure. One might ask: “Is the 3D FEA just for show, or does it add real value?” The pipeline industry has traditionally relied on back-of-the-envelop fracture mechanics models. For example, the NG-18 approach was developed by Keiffner and is based on 1970s technology. These simplified models are generally “conservative” in that they underestimate burst pressure and critical crack size. However, these so-called conservative models actually work in the other direction when used to predict the maximum flaw size that survives a hydrotest. By underestimating the critical flaw size to fail a hydrotest, much larger than expected flaws are left in the pipe following the test. Flaws identified by hydrotest. Flaws that unexpectedly survive the hydrotest, based on the simplified analysis.

Case Study - 1: Dual Diameter Dual diameter pipeline (6inch/8inch) in a major metropolitan area. Small radius bends Multiple diameter changes. Need to inspect both diameters of pipe in single run Using frequent hydrotests to achieve regulatory compliance. Only provide a snapshot of pipeline integrity Not useful for dents of near through-wall failures Over 50 km of pipeline. Desirable to inspect in product with standard operational pumps. Excavations very expensive – not practical for direct assessment

Case Study - 1: Results Worked with operator during planning stages to ensure that tool could navigate with their specific pumping configuration Collected analyzed and performed a full Fitness-For-Service Assessment on nearly 9 GB of data Customized reporting to fit client requirements including piping station locations Critical defects such as this 6% topside dent were found that would not have been detectable by a hydrotest and could have led to a costly in-service failure

Case Study - 1: Blisters Inspection also revealed the presence of large blisters and laminations Not visible from an external examination of the pipe. Would not have failed a hydrotest. Blisters able to be distinguished from dents by profile of defect as well as presence of laminations in surrounding pipe. Treatment of blisters is not proscribed in regulations. Evaluation is helped by detailed profiling data

Case Study - 2: Parallel Lines Multiple 12inch parallel pipelines that run under a short span of water. No existing launcher or receiver facilities Previously had used guided wave ultrasonic inspection (GUL) but wanted more detailed information than GUL was able to deliver. Guided wave better suited as a screening tool. ILI allows for direct anomaly sizing and assessment. Considered using a tethered ILI tool, but ease of operation led to free swimming ultrasonic tool. Ease of launch and receive of tool was important because there was not a lot of available workspace on either end. Bidirectional capability allowed for majority of the work to be done on one side Flexibility of tool operation saved operator complexity and cost on the project. Inspection performed with temporary launch/receive trap, Gauge plate pig, and pipeline cleaning performed as turnkey service

Case Study - 2: Setup Greater operational flexibility. Inspector and operator collaborated on overall project plan. Used a single launch and receive location. Used a single launch/receive barrel during the inspection of four parallel lines. Barrel was switched between lines. Able to inspect more than one line per day including cleaning. Entire project completed in under one week.

Case Study - 2: Results Quantified external corrosion Identified defects in areas that would have been difficult to access for manual inspection Full Level 2 assessment done on entire line. Engineering Fitness-For-Service assessment delivered using 100% of the data Both Fitness-For-Service report and standard ILI spreadsheet in client format included as part of the final report.

Case Study 3 – South America Three (3) consecutive inspections: 8inch - ID restrictions block MFL Crude line running from a platform to shore. Measured the minimum internal diameter (ID) at 6.77” (172mm). Surprisingly- ID a 1.5m section where a sleeve had been used for repair. The ID expanded from 8.03” (204mm) to 9.25” (235mm) which would have stalled out most ILI tools. 6inch - Riser and the main pipeline connected with 6inch flexible hose Gas lift line running parallel to the previous 8inch. Onboard firewater pumps provided the medium without modifications to the line. Found eight (8) ID reductions > 8% OD. Reduced at its maximum by 11.9%, the nominal ID was 6.07” (154.1mm) was measured down to 5.2” (132.1mm). 8inch – Low pressure was insufficient for conventional ILI tools (116 psi – 8 bar) Crude oil connector line running between two platforms. Located a 15% reduction of the riser pipe including wall loss of 88%

Feedback Client Summary: There was no heavy lifting involved for the operators or bulky transport by boat or chopper. Hand carried all tools and crew to platforms via helicopter. Time for tool set-up and launch was less than 15 minutes. Tool was accommodated in existing cleaning pig traps. Data presentation within hours after the inspection the client was presented a site completion report indicating data quality, if the pipeline was clean and where the debris was located. Inspection covered the complete pipeline including the riser. Riser: Heavier wall pipe and various metallic features like attached clamps were not an issue. Appreciated that we had quoted a complete package, coordinating a realistic inspection schedule, and the flexibility of deployment of the tool (reruns could be performed within the hour if needed). Team was responsive…

Flex-Hose Deformation Measurement

Effective Area Assessment –Independent of Flaw Boxing Validated Wall Thickness is used in API 579 FFS Assessment Minimum MAOPr value for external corrosion region

Strain Calculations High resolution geometry data now allows for more advanced strain calculations for better prioritization of anomalies Level 2 – Stress Concentration Factors and Code Calculations Level 3 – Finite Element Analysis

Conclusions Inspection options do exist – often without extensive pipeline modifications Unpiggable lines offer unique challenges and can benefit from creative solutions. Operator and inspection company should work together to help solve a complex inspection puzzle. Operator understands pipeline configuration Inspection company understands tool performance and capabilities Inspection is just one piece of the overall integrity management project High resolution datasets can be used more efficiently for integrity management. Want to maximize benefit of inspection data to gain more information than a single pass/fail snapshot at a single point in time Dual Diameter Bidirectional Runs Loop lines together Temporary traps No launcher or receiver – insert/remove tool at flange Multiple inspection runs in one mobilization Confidence in passing unknown fittings

Gracias Preguntas?