8:16 SB 25ns dumped by RF; integrated lumi 0.6 nb-1. 9:14 BIC problem in TI8 and CMS recovering their tracker 10:09 Abort gap cleaning commissioning. 16:29.
Advertisements

LHC progress Thursday 30 th April 2015 Coordination: Mike Lamont, Wolfgang Hofle.
Tuesday 10 th April - morning Access for:  point 3 Jerome Landaro TCSG one jaw didn't move  point 5 Qps expert on RPMBB.UJ56.RCBXH1.R5  point 6 TCDQ.
Monday h00: End of fill #1640: 3.7 pb h14: RB S12 and S23 tripped before loading rampdown table, active filter. MPE piquet. Fip_Com_Lost.
LHC Progress Friday 30 th October 2015 Coordination Week 44: Massimo Giovannozzi, Wolfgang Hofle, Jorg Wenninger.
LHC Progress Thursday 29 th October 2015 Coordination Week 44: Massimo Giovannozzi, Wolfgang Hofle, Jorg Wenninger.
LHC progress Sunday 3rd May 2015 Coordination: Mike Lamont, Wolfgang Hofle.
Thursday 20 th April 01:53 RCBV17.R7B2 tripped as happened few days ago: SIS intercepted. 05:54 Stable beams, 1380b, still RF problems B1, abort gap cleaning.
Monday – Morning L. Drosdal: Injection line TI8: IQC threshold for BPM H from 2mm to 2.5mm to avoid unnecessary latches due to variations.
Wednesday 8.9 External crossing angles:
Saturday Coordinators weekend: Mike Lamont, Eva Barbara Holzer
Wednesday :06 Dump fill 3533: interlock BPMS in IP6
Monday Recover after trip of RB.A81  Cause of the trip not clear. MP3? 09:00-13:00 Re-inject and Injection verification. In parallel investigations on.
-9:00: Test IP transverse adjustment (CMS) and optics verification.
Wednesday September 14th
Monday h00: Ramp 10 A/s (chromaticity, crossing angle non-closure, beta-beating): At 7m and 3.5m, put in one by one crossing angles, calculated.
Friday 07:00 Power glitch on the EDF network. Point 8 affected.
Monday 14th March Second fill with pilot + 3 nominal bunches
Thursday 09:30 VdM scan for CMS, standard ADT gain.
02/08/ :35: Lost access chain in point 2 (PX24 PAD)  Dump after ~14.5 hours ~100 nb-1.
Week 46 Week 46: Machine coordinators: Roger Bailey – Gianluigi Arduini Main aims of the week: Stable beams with ions Scheduled stop for ion source refill.
Monday morning 08:30 Start of rephasing MD. Dry tests in the morning.
Wednesday /Thursday 09-11:00 Verification of the LSS6 interlocked BPMs: took longer to fill due to some problems with RF cavities in the PS. In the mean.
LHC Morning Meeting - G. Arduini
Barbara Holzer, Jorg Wenninger
LHC operation in week 42 Coordination:, Malika Meddahi, Joerg Wenninger Thanks to OP crews, HW and SW teams + experiments Aims for the week Cure aperture.
Lost at 12:05 to power converter (RTQX2.R1) problem
Friday 31st August & night
Thursday 10th May - morning
Saturday 2/4/ :00-09:00 Problems with SPS:
Friday March 4th 08h32: Access for beam dump system.
Week 35 – Technical Stop and Restart
Monday Morning – recovery from cryo.
Monday February 28th 8h00: Injection
04-05/08/2010 End of physics at ~11:00 after 18.5 hours ~120 nb-1.
Friday morning 10:30 Optics measurements and corrections.
Friday Morning 7:30 injection for fill 2908
Friday AM Some oscillations of the cryo conditions in MSR8 perturbed the setup for injection. RF frequency interlock fixed – required a reset of RF controls.
Friday 16/3 08:30 – 10:15 Access for QPS and EPC (BI in point 4)
Summary Thursday h21: Stable beams fill #1303.
Sunday/Monday & :30 Stable beams. Fill #1851.
Summary of week 19 Machine Coordinators: G. Arduini, M. Lamont Main aim: Luminosity production.
Aims for the week Recover from technical stop and precycle at 10A/s
Wednesday 10:00 test of the un-squeeze to 90 m at 4 TeV.
LHC Morning Meeting - G. Arduini
Thursday 04/11 - Morning Access until ~13:00 Pre-cycle Proton checks:
Summary week 18 Intensity ramp up & production
Saturday Nov Stop proton operation. Switch back to ions
Tue/Wed 12/ :00 Probe beam back again
Programme for Friday 9 July
Friday 8/10/10 - Morning Planned to keep fill until the afternoon
Summary for LPC (March 7th, Ralph Assmann)
Saturday 12 March Morning: problem on RSD1.A12B2 – flow rate problem on the cooling water for the converter. 14:00: Loss map -500 Hz (positive energy offset)
Sat 18/3 - Ramp to 4 TeV Again glitch on the safe beam flag for beam 2. Cause identified: noise on BCT2B giving values above the safe beam limit (2.4×1010.
LHC commissioning Week 27
Thu 04:00 Fill #2729 Stable Beams. Initial lumi 6.5e33 cm-2 s-1.
Summary Tuesday h23: Machine closed. Precycle started.
Tuesday 20 September 2011.
Wednesday 23/2 Thanks CRYO!!!.
Thursday
Coordination: Eva Barbara Holzer, Mike Lamont
Wednesday h18: 228b fill lost just before start of ramp.
Monday 26th September 7:30 Beam dump, QSP on RQX.R1, lost cryo in ITR1, 91 pb-1. Cryo recovery, needed about 1.5 h. Setting of TI2 collimators to 5 sigma.
Friday 15th February - morning
Monday 27th August & night
Wednesday 26 October 2011.
Saturday 26 November 2011.
Tuesday
Saturday Morning used to complete the loss maps and asynch dumps (with RPs). All loss maps OK (B. Salvachua), but the off-p cleaning for B1 (Lead) was.
Monday 5 July Morning: Continued with the Physics fill, 7b x 7b, 1e11/bunch Stable beams from 2:30 am to 13:30 : 11 hours.
Presentation transcript:

Programme for Saturday 10 July Understand the RF problems affecting LHC Filling for Physics fill with single10b_4_2_4_rot EOF - ADT feedback Injection studies Physics fill with single9b_6_6_6

Saturday 10 July Morning: 8:00 -12:00 Filling for Physics fill with single10b_4_2_4_rot Injected O.K. 10 bunches of beam 1 and 9 bunches of beam 2 On the request of the 10th bunch of beam 2: LHC-RF got de-synchronised – as last night. Experts investigating. Meanwhile, RF noise on Beam 1 appeared again, creating beam 1 de-bunching (~1e10p in the abort gap). Total losses from the buckets: ~2.5 e11p 12:00 : dump beams (after cleaning some of the beam in the abort gap)

Saturday 10 July

Saturday 10 July RF problems with single10b_4_2_4_rot on bucket number 29700 Philippe and Frederic Request bucket number 29700 Processing of this value: an offset is added and then number cast in a short integer. For value above 29625 there is an overflow and the most significant digit is disregarded resulting in a number which is too small for the bucket selector  common frequency generator is stopped. SPS is locked on the LHC and without this common frequency it will not even take beam from the PS. Fri-Sat night: SPS switched back to its local clock, and beam was re-established in the SPS. LHC RF problem was then solved by sending manually a "NEXT INJECTION RF BUCKET“, which un-blocked the common frequency generator but … did not solve the problem.

Saturday 10 July Saturday morning : Again we logically requested bucket number 29700. Same effects are observed  bucket selector stopped! Had to switch off/on the synchro-crate which hosts this board in SR4 Dry test done with bucket 1  O.K. Test with bucket 29700  same problem. And therefore investigated and understood the problem DO NOT USE bucket number above 29626 Will be fixed on Monday (not needed in this fill)

Saturday 10 July B1 RF noise problems: Philippe and Frederic While investigating, observed big de-bunching on beam 1 with signature similar to last Sunday  RF noise The clock generator module in SR 4 produces the clock used by the RF demodulators. One of this clock (380 MHz) is produced by a Phase Lock Loop which was not locking anymore on beam 1, generating bursts of noise in the loop. Re-tuned it to put it back in the middle of the range. The effects is not caused by temperature but probably humidity. To be monitored periodically. The same module has been in operation in UX45 since Oct. 2008 and showed small drift.

Saturday 10 July 13:30 : Refilling with the single9b_6_6_6, without this 29700 bucket number At the end of injection  beam dump by an electrical glitch caught by the FMCM in IP6 14:30 : re-starting the injection, single9b_6_6_6. 18:30 : at 3.5 TeV, squeezed, right before collapsing the separation bumps, got hit by another electrical glitch on the network which was caught by the FMCM in Pt 1 and 5 and dumped the beams 18:30 : Ramp down combo 20:00 : Towards the end of ramp-down combo, got hit again by an electrical glitch which tripped S67-78. Later on, got hit again by cryo-maintain in S67 (spike in the pressure sensor) 20:00 – 22:00 : Pre-cycle sectors 67 and 78

Saturday 11 to Sunday 12 July 00:30 Injected 9+9 nominal bunches – TI 2 TL and protection device setting-up of Friday successful : IQC does not latched anymore for B1. Ramped and started to squeeze. Orbit feedback was not on and the orbit drifted until the beams were dumped at 2:45 before getting to the 7 m stop point. At about 4 am lost CM in 56 and 67 - this was quickly solved by the cryo piquet and operator so that at 6 am the conditions were already back. 4:15 - 8:00 : WorldFIP communication problem affecting cells 15R4 to 8R4: access in pt 4 – repeater changed. Pre-cycling and preparing LHC for 450 GeV injection

Programme for Sunday 12 July ~11:00 – 23:00 : Injection studies pending readiness of the LINAC source (control problems) Overnight : Physics fill

To Be Done Establish absolute reference orbit with stable beam configuration – Joerg Wenninger EOF: ADT with colliding beams – Wolfgang Hofle Octupoles to zero WS (vs. BLM threshold, also during the ramp) – Bernd Dehning Loss maps – Ralph Assmann Beam time requests: Hump measurements – Gianluigi – 450 GeV, 1.5h Optics measurements – Rogelio Tomas, 450 GeV (8hr) and 3.5 TeV (8h) Beam-beam studies – Werner Herr (few shifts) High/Low gain sensitivity switch (mostly parasitically) ADT: 450 GeV, 8 hrs, to check the noise improvement after going to the high intensity settings, complete the set-up of one missing pick-up

Pending Requests FMCM : re-visit / tests whether the threshold can be relaxed? Access requests: Wire scanner B2: electronics board to change – Anna Guerrero TCLA.B5L3.B2 collimator (during next TS) – Alessandro Masi Check Clock Gen. in Faraday Cage (SR4) – Philippe Baudrenghien In investigation: RSS.A34B1 S34 : No PM by detector due to the low current level in the circuit --> no trigger. PM however from switch confirming self opening (both flags change state). 1st event of this kind in LHC to be studied by EE experts once back from holidays. But tripped again 2 other times