Presentation by: Tshewang Gyeltshen. The SBD is prepared in line with the PRR 2009 & SBD Large Works General principals of procurement to be applied prescribed.

Slides:



Advertisements
Similar presentations
1 CLIENT CONSULTANT AGREEMENT. 2 Negotiations Types of Consulting Contracts Standard Form of Contract Form of Contract General Conditions Special Conditions.
Advertisements

Construction Contracting
1 Florida Gulf Coast University Small Business Development Center (SBDC) Procurement Technical Assistance Center (PTAC) Reading Solicitations.
STANDARD BIDDING DOCUMENT PROCUREMENT OF GOODS (FOR VALUE UP TO NU.0.25 MILLION) Presentation by: Tshewang Gyeltshen.
COMPULSORY BRIEFING SESSION Office Space for the RAF Johannesburg branch RAF /2014/00029 Date: 21 November 2014 Time: 11:00.
Bidding Requirements ACT 380. Objective Provide an overview of the bidding process, including documents included in the bidding requirements.
Tendering Procedures in Lagos State under the Public Procurement Law 2011 Presented By Engr. Akin Onimole | February 13, 2013 GM/CEO, Public Procurement.
Prequalification Process / Subcontract Lisa Conomy Construction Counsel, OSU Lane Beougher State Architect.
INTRODUCTION TO PUBLIC PROCUREMENT
ROAD ACCIDENT FUND NON COMPULSORY BRIEFING SESSION RFP /2013/00021 Date: 22 July 2013 Time: 11:00.
1 1 Module II. Bidding and Evaluation Process I.Bidding documents (Stages of bidding & preparation of bidding document) II.Bid evaluation methods (principles.
Module 10 Organizing Procurement Session 10.7 Procurement of Goods:
1 Training on Procurement Procedure 23 rd Review Meeting of State FCs- Bhopal ( ) Annexure ‘W’
Construction: Legal Issues. Legal Issues In the Bidding Process Timing of various activities has legal implications. During the bidding process: –A bid.
Nabil dmaidi1 Bid Submission Documents A LATE BID IS NO BID.
Conditions and Peculiarities of Submission of Complaints in Ukraine. Typical Errors/Infringements Relating to Submission of Complaints Kyiv, April.
Transparency International-National Accountability Bureau-World Bank
1 PRESENTATION ON TENDERING REQUIREMENTS Presented by Kenya National Highways Authority (KeNHA) Team.
ROAD ACCIDENT FUND VENDOR BRIEFING SESSION RAF/ 2012 /00028 Date: 12 November 2012 Time: 11:00.
Key Provisions in Standard Contract Conditions Presented by Simeon A. Sahaydachny Kyiv, 20 April
Compensation events and claims Presented by Prof. Khem Dallakoti.
Public Procurement Procedure – Bidding Documents
RPA1 Standard Bidding Documents for the Supply and Installation of Information Systems Walkthrough February 27 – Mar 3, 2006, Zagreb, ECA.
YUSUF OZ FATIH BOLUKBAS HUSEYIN ANIL KARABULUT. A contract is a legally binding agreement between two or more parties.
General Condition THE EMPLOYER Construction Law Supervised By : Dr. Kamalain Shaath Prepared By : Eng. Fawzy El.farra.
CONSTRUCTION CONTRACTS DOCUEMENTS
Conditions of the Contract ACT Objective To provide an overview of the Conditions of the Contract, their purpose, content, and relationship to.
RPA1 Standard Bidding Documents for the Supply and Installation of Information Systems General Conditions of Contract and Special Conditions of Contract.
UNDP Bangladesh Procurement Fair Objectives of the Fair; - UNDP Procurement principles; - Procurement plan ; - UNDP Procurement Roadmap;
Generic Documents for the Design, Build, Operate Contract for a Solid Waste Facility.
1 Instructions to bidders  Eligibility  Procedure for clarifications  Bid preparation - form  Number of copies, addressee  Language  Pricing and.
ROAD ACCIDENT FUND VENDOR BRIEFING SESSION RAF/ 2012 /00029 Date: 07 December 2012 Time: 11:00.
Elevating the Quality of Life in the District Contracting and Procurement Division Information Session 2 Request for Proposal November 5, 2015.
1 CONTRACTING. 2 WHAT IS CONTRACTING ? CONTRACTING IS BASICALLY AN AGREEMENT BETWEEN TWO PARTIES, ONE CALLED THE CONTRACTING PARTY AND THE OTHER THE CONTRACTED.
Procurement in Projects Financed by Islamic Development Bank Presented during Project Start-up Workshop September 2015, Jakarta, Republic of Indonesia.
INVITATION TO TENDER PROCEDURE INVITATION TO TENDER PROCEDURE IT–4144/SMB/HL-LHC (Point 1) IT-4155/SMB/HL-LHC (Point 5)
RPA1 Standard Bidding Documents for the Supply and Installation of Information Systems Invitation to Bids (ITB) and Bid Data Sheet (BDS) February 27- Mar.
PRE-BID MEETING CONSTRUCTION OF THE MEDUPI-BORUTHO TRANSMISSION LINE PRE-BID MEETING WORLD BANK GUIDELINES Presented by: Brendah Shange.
BOS 1 Procurement of Goods and Works Asian Development Bank Business Opportunities.
Building Capacity of SMEs for Participation in Public Procurement Draft Presentation for Training of Trainers June 2014.
Building Capacity of SMEs for Participation in Public Procurement Draft Presentation for Training of Trainers June 2014.
Assessment of the Bidding Process in Construction Project ABDULLAH H. ABU ZANT. AYMAN K. ILAIWI. MOHAMMED FADEL. SODQI M. ALHNAINI. AN-NAJAH NATIONAL UNIVERSITY.
FIDIC Tendering Procedures
ROAD ACCIDENT FUND VENDOR BRIEFING SESSION RAF/ 2012 /00032
Ajay Kumar Mull Senior Divisional Engineer Department of Roads
Procurement & Strategic Sourcing
ROAD ACCIDENT FUND VENDOR BRIEFING SESSION RAF/ 2012 /00028
Tender Evaluation and Award Process
ROAD ACCIDENT FUND VENDOR BRIEFING SESSION RAF/ 2013 /00009
Administration of a FIDIC Contract - Project Control
ROAD ACCIDENT FUND NON COMPULSORY BRIEFING SESSION RFP /2013/00021
Administration of a FIDIC Contract - Commencement Date to + 28 Days -
Content of Tender Dossier - Instructions to Tenderers - Tenders
Content of Tender Dossier Instructions to Tenderers
Particular Conditions of Contract & Appendix to Tender
WORLD BANK Harmonized SBD-Works
Procurement & Strategic Sourcing Charter Bus Transportation Services
Evaluation Grids Evaluation Grids.
Administration of a FIDIC Contract - Award to Commencement -
- Period before Tenders Submission –
International Open Procedure (1) – PRAG 4.3
ROAD ACCIDENT FUND VENDOR BRIEFING SESSION RAF/ 2012 /00029
Particular Conditions of Contract & Appendix to Tender
BIDDING AND STANDARD BIDDING DOCUMENTS (SBDs)
Bid Evaluation and Award
Training on Dr. Sudhir Kumar Grid Connected Rooftop PV Systems
Procurement Workshop APT MDP Hyderabad
BIDDING DOCUMENTS AND MAIN FEATURES
Enhancing Procurement Efficiency: Litigation Issues, Standard Bidding Documents and eGP Shakti Prasad Shrestha March 21, 2018.
BRP – Pre-bid Meeting Bridge Reconstruction Project 16th December 2015
Presentation transcript:

Presentation by: Tshewang Gyeltshen

The SBD is prepared in line with the PRR 2009 & SBD Large Works General principals of procurement to be applied prescribed in the PRR and SBD Large Works Guidance notes are provided which should be removed while preparing the bidding document. The SBD should be used for procurement up to Nu. 4.0 million

The main objectives for the SBDs are: To have a uniform procurement system throughout the country Simplify procurement of smaller works

Modifications for specific Project needs should be provided only in the Bidding Data Sheet and the Special Conditions of Contract, as amendments to the Instructions to Bidders and the General Conditions of Contract respectively. The notes inside boxes, foot notes as well as others intended as guidance for the Employer, are not part of the text, but rather contain instructions for the user. They should not be incorporated in the Bidding Documents.

Generally provides information on the requirement of bidders to fulfill the project requirements. Scope of tender Corrupt, Fraudulent, Collusive or Coercive Practices Legal status – Required Site Visit

Section 1.Instructions to Bidders (ITB) Section 2.Bidding Data Sheet (BDS) Section 3.Evaluation and Qualification Criteria Section 4.Bidding forms Section 5.General Conditions of Contract (GCC) Section 6.Special Conditions of Contract (SCC) Section 7.Contract Forms Section 8. Bill of Quantities Section 9.Drawings Clarification of Bidding Documents Amendment of Bidding Documents

One Bid per Bidder Bid Preparation Costs Language of Bid Documents comprising the Bid (original and copies should contain the bid form, license and certificate, bid security & priced bill of quantities). Letter of Bid and Schedule: should be prepared as per forms of bid, & qualification information. Alternative Bid Bid Price and Discount

Currencies of Bid and Payment Documents comprising the Technical Proposal (WP) Documents establishing the Qualification of the Bidder Bid Validity Bid Security Format and Signing of Bid (O & C, signed by duly authorized person, initialed)

Sealing and Marking of Bids Bid Submission Deadline Late Bids Modification, Substitution or Withdrawal of Bids Bid Opening

Confidentiality Clarification (arithmetical, not change of price or substance) Bidder: Contacting the Employer Determination of Responsiveness (material deviation, reservation & omission) Non Conformities, Errors and Omissions Evaluation and Comparison of Tenders (no. & words, unit price & line item total) Employers Right to Accept or Reject any or all

Award Criteria Notification of Award complaints

This Section consists of provisions that are specific to each object of procurement and that supplements the information or requirements included in Section 1: Instructions to Bidders.

The criteria that the Employer shall use to evaluate bids and qualify Bidders if the bidding was not preceded by a prequalification exercise and post qualifications are applied. No other methods, criteria and factors shall be used. The Bidder shall provide all the information requested in the forms included in Section 4 (Bidding Forms).

This Section provides the standard format for the Bid Form and Bid Security if required, that are to be submitted by the Bidder. This Section also contains the form of the Notification of Award (Form-2) and the Contract Agreement (Form-3) which, when completed, incorporates any corrections or modifications to the accepted Bidder relating to amendments permitted by the ITB, GCC and SCC. The forms for Performance Security (Form-5) and Advance Payment Security (Form-6), when required, are to be completed by the successful Bidder after Contract award.

Interpretation & Documents forming the Contract the signed Contract Agreement. the letter of Notification of Award. the completed Bid form as submitted by the Bidder. the Special Conditions of Contract. the General Conditions of Contract. Specifications the Drawings

Corrupt, Fraudulent, Collusive or Coercive Practices Governing Language and Law Engineers Decision Delegation Communications and Notices (writing, effective when delivered or effective date, which ever is later) Sub- Contracting Contractors Personnel Welfare of Labourers & Child Labour

Safety, Security and Protection of the Environment Access to the site Documents, Information (contractor shall furnish to engineer all information, schedules, calculations & documents requested by engineer) Property (termination) Insurance (as per SCC before start date, employer may effect) Possession of the Site

Commencement of Works Completion of Works Programme of Works Early Warning Compensation Events Non-Scheduled Items of Works Schedule of Works Payment Certificates

Payments and Currency Retention Liquidated Damages Performance Security Price Adjustment Completion Correction of Defects Taking Over (7 days after completion certificate)

Final Account (certify in 21 days, payment within 30 days) Termination (30 days notice) Payment upon Termination Release from Performance (frustrated by war or uncontrollable situation) Force Majeure (war, terrorism, earthquake) Settlement of Disputes

This Section provides clauses specific to the Special Conditions to a particular Contract. This can be modified according to requirements specific to the contract.

This section contains forms which, once completed, will form part of the Contract. The forms for Performance Security and Advance Payment Security, when required, shall only be completed by the successful Bidder after Contract award Contract Forms Form -1: Notification of Award Form -2: Contract Agreement Form -3: Bank Guarantee for Performance Security Form -4:Bank Guarantee for Advance Payment

The documents forming the Contract shall be interpreted in the following order of priority: The signed Contract Agreement; The letter of Acceptance; The completed Bid form as submitted by the Bidder; The Special Conditions of Contract; The General Conditions of Contract; Specifications The Drawings; and Any other document listed in the SCC as forming part of the Contract..

This Section provides the items and estimated quantities of Works and Related Services to be performed, as well as the detailed Technical Specifications that describe the Works to be procured and must be carefully prepared by a Procuring Agency for each object of procurement.

This Section contains any Drawings that supplement the Schedule of Works including Specifications for the Works and Related Services to be procured.

Thank you and Tashi Dekek