RPC SYSTEM LAYOUT and DIMENSIONS

Slides:



Advertisements
Similar presentations
Tagger and Vacuum Chamber Assembly Procedure. Outline. Assembly procedure for tagger and vacuum chamber. Support stands. Alignment.
Advertisements

Frame design Status TB-SWG May 2005 Presented by K. Ioki Prepared by M. Morimoto VV and Blanket Division, ITER Garching ITER.
Supermicro © 2009Confidential MCP N installation guide Rech Weng.
Stable Rise –Pull and Swivel Top Installation and Set Up Guide Jaymil Ergo & Office Solutions 150 Dow Street, Tower 4, Manchester, NH
CM30 University of Oxford Engineering session Peter Ford Tim Hayler Eddie Holtom Roy Preece Jason Tarrant Steve Virostek.
AMS-02 tracker mechanics status of assembly and integration at UniGe Outer planes: - Tests of evaporator (cooling loop) integration - Tools to develop.
MICE Installation and Commissioning meeting RAL, 12 June 2007 Diffuser Oxford University.
Tracker Refurbishment. What was done… Over the past 3-4 months Trackers 1 and 2 have been refurbished. What does this mean? The trackers were removed.
1 Telecom Cabling Ladder racks systems and relay racks Ladder racks systems and relay racks.
PCB layout issues PCB alignment and spacing MMM meeting, 22/01/2014G. Sekhniaidze/ J. Wotschack1.
Mechanical Work Plan Discussion Bill Cooper Fermilab.
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Document: LAT-PR-0XXXX Section 5.1 Grid Box Design 1 GLAST Large Area Telescope:
Ron Madaras, LBL U.S. Pixel Meeting, SCIPP, July 9-10, 2003 Patch Panel 1 (PP1) Brief Review Cost and Effort Estimate.
1 Belle II IR 2 Shuji Tanaka KEK Joint Belle II & superB Background meeting 2012//Feb/ 8-9th 1.
CMS Muon Chambers Long term studies at GIF++ Andrey Marinov On Behalf of Long Term Studies of the CMS Muon Detectors 1.
News on PANDA ToF from ITEP (new mechanic design for DRPC based system) ITEP Russia-Panda meeting — April 26-28, 2010, ITEP(Moscow) Alexander Akindinov.
Tariq J. Solaija, NCP Forward RPC EDR, Tariq Solaija Forward RPC EDR The Standard RPC for low  regions Tariq J. Solaija National Centre for.
Barrel Endcap The RPC System Baseline Six stations in the Barrel Four station in the Endcap up to  = 2.1 Baseline Six stations in the Barrel Four station.
Production of Forward RPC Gaps CMS Forward RPC EDR (10/10/2002 – 11/10/2002) Seong Jong Hong KODEL, Korea University.
NSQP X-1 ASSEMBLY Lessons learned Sébastien MICHAL January 30 rd 2012.
 YE+4 disks = 2 Nos. (12 Sectors each)  Support Structures = 2Nos.  AISI 1045 steel bar = 1 No. for checking dimension of 680 mm (0/-0.5)  Fasteners.
G. Pugliese RPC requests for GIF++ G.Pugliese, N. Zaganidis and I. Pedraza on behalf of the RPC group 1.
W.Van Doninck Re-scope TDR August 2008 The forward RPC system (TDR) China Korea Pakistan Gap production Korea Gap production Korea Front-end electronics.
Total Cross Section, Elastic Scattering and Diffraction Dissociation at the LHC January 17, 2003TOTEM plenary meeting -Marco Bozzo1 CSC detectors for T1.
7 November 2003 Status of CNGS NBI presented by K. Elsener 1 Status of CNGS Konrad Elsener CERN – Accelerators+Beams Division.
1 Al Moretti, APC, Fermilab MAP- Winter Meeting February 28 - March 4, 2011 TJNAF Newport News, VA.
1 G. Aielli for the RPC community. General information  BOE to be delivered in September  Detector design is over  Production facility reviewd and.
High Voltage Cards & 2000 Electronic/Thermal Model. CMS ECAL End Cap Meeting CERN 19 June to 23 June 2000A.B.Lodge - RAL -1 ECAL End Cap 1 EE End Cap Engineering.
CAD MODELS FOR MPGD CHAMBERS 24/06/20111II MPGD WORKSHOP Antonio Conde, PH-CMX.
H. Katajisto RE EDR 10/10/02 Enclosures for the RPC Link Boards Outline Introduction Periphery General Services Components, materials Manufacture, Assembly.
W.Van Doninck February 2010 The CMS muon upscope Restore the TDR version of CMS  ME4 CSC’s and RE4 RPC’s on Yoke YE3  When ? During first long shutdown.
Chamber mechanics Chamber mechanics Production in China Peking University Group – 20 Aug
G.Barber: Summary of Mice Fibre Tracker Meeting FermiLab 8-12 March Developments during Tracker workshop Contents:- Revised Fibre Pitch Fibre Optic.
MICE Coupling Coil Fabrication Steps to Complete Allan DeMello Lawrence Berkeley National Laboratory Coupling Coil Working Group January 28, 2014 January.
The Phase-1 Extension of the CMS Endcap RPC System Michael Tytgat on behalf of the CMS Collaboration Outline :  Introduction  RPC Upgrade  Simulation.
SVD Docks Markus Friedl (HEPHY Vienna) B2GM, 23 July 2012.
Resistive Plate Chambers for CMS and INO
EC: 7 DISK concept Preliminary considerations
VIEW SERIES with Sliding Door
User Operation Presentation
RE 4/3 RPC Pre-assembly manual 1. HCP case preparation
University of Wisconsin
Mock-up and integration status
CMS GEM services: Cooling
Integration and Services RE3/1 and RE4/1
Update on Pavia MM mechanical prototype
Integration and Services RE3/1 and RE4/1
Gas Detectors (GEM) The 6th Egyptian school for high energy physics
Methods for Mounting LCD Displays
YE2 – YE3 distance Manual measurements
Endcap shielding senarios:
T1 status (a selection from EDR presentations)
LHC Experimental Vacuum Systems Status October ‘07
A. Mikhailichenko, D. Rubin
Additional muon stations for the Upgrade of the Elevator Regions in the ATLAS Muon Spectrometer. Integration issues Denis Diyakov, Alexander Seletskiy,
GRPC activity for EuDHCAL in IHEP-Protvino
for the transition region on behalf of the RPC upgrade group
Chamber Design and Integration RE3/1 and RE4/1
Update on Junction Box Design
HPL DG d=1.4mm/e= mm.
Installation plans from mid 2005
Coordinate system for the GIF as defined for CMS RPCs
Tagger Microscope Mounting, Shielding & Cooling
RPC Readiness for installation
MUC simulation and reconstruction
A # Gasket spacing between flanges are not included in dimensions.
Area: Area of a parallelogram
CSC Electronics Installation and Commissioning Oct ‘06
RE3/1 & RE4/1 Parameter Space Services
Presentation transcript:

RPC SYSTEM LAYOUT and DIMENSIONS M. Shariq Khan National Center for Physics Quaid-e-Azam University, Islamabad PAKISTAN

CONTENTS Geometrical Layout of CMS End Cap RPCs Chamber Sizes Patch panel Mountings FEB cooling & gas circuit on RE 2/2 Summary

GEOMETRICAL LAYOUT OF CMS END CAP RPCs Chamber Data Chamber Geometrical Data Gaps Details Strips Geometry for  segment for a,b,c,d

No. of channels/chamber CHAMBER DATA   RE 1/1 1/2 1/3 RE 2/1 RE 2/2 RE 2/3 RE 3/1 RE 3/2 RE 3/3 4/1 4/2 4/3 (Plus & Minus Z) 36*2 18*2  Segments 4 3 2  Coverage, deg. 10 20 Strips/ Segment 32 64 No. of channels/chamber 128 96 256 192 No. of chambers

Chamber Geometrical data No. of chambers

Gap Geometrical data No. of chambers

Strip data No. of chambers

RE 1/1 Mounting

RE 1/1 Mounting

RE 1/1 Mounting

RE 1/2 Mounting

RE 1/2 Mounting

RE 2 Mounting

RE 2 Mounting

RE 4/1 Mounting

Patch Panel

FEB Cooling

ANALYSIS 1

ANALYSIS 2

ANALYSIS 3

ANALYSIS 4

ANALYSIS 5

ANALYSIS 6

ANALYSIS 7

ANALYSIS 8

Summary Gaps with the specified geometrical dimensions have already been built and tested. Holes for RE 1/1 rails and mounting brackets already drilled on HE back flange (- side ). Rails have been installed. Mounting holes for RPCs on YE1 & YE3 have been drilled for stations 2 & 3. RE 1/2 are attached to CSCs, RPC staggering follows CSCs. RE 1/3 mounted under CSCs, 110 mm off YE1 to accommodate cable trays. Position of RE 4 mounting holes on shielding wall determined.