QUALITY ASSURANCE FOR CONTRACTED MAINTENANCE IN ONTARIO, CANADA

Slides:



Advertisements
Similar presentations
Who Wants To Be A Millionaire?
Advertisements

Welcome to Who Wants to be a Millionaire
Operations Management Maintenance and Reliability Chapter 17
Inter-Agency Procurement Technical Module. What is Inter-Agency Procurement? Collaborative procurement by participating UN Agencies for commonly required.
County of Fairfax, Virginia 1 Department of Transportation Bus Stop Improvement Program Fairfax County Department of Transportation Transit Services Division.
Independent Advisory Panel Presentation to the MWAA Board of Directors March 16, 2011 Brenda Bohlke Adrian Ciolko Walt Mergelsberg Rich Redmond Piet Van.
1 Beth McKillop, The British Library Library contacts with Korea.
Threshold System Presented by Jan Stanley, State Title I Director Office of Assessment and Accountability Fall Title I Directors Conference October 23-25,
State Aid Programs Legislative Issues - Bonding Local Bridge Replacement Program Local Road Improvement Township Sign Replacement Program.
$1 Million $500,000 $250,000 $125,000 $64,000 $32,000 $16,000 $8,000 $4,000 $2,000 $1,000 $500 $300 $200 $100 Welcome.
$1 Million $500,000 $250,000 $125,000 $64,000 $32,000 $16,000 $8,000 $4,000 $2,000 $1,000 $500 $300 $200 $100 Welcome.
Welcome to Who Wants to be a Millionaire
£1 Million £500,000 £250,000 £125,000 £64,000 £32,000 £16,000 £8,000 £4,000 £2,000 £1,000 £500 £300 £200 £100 Welcome.
Welcome to Who Wants to be a Millionaire
Welcome to Who Wants to be a Millionaire
Construction Engineering 221
September 28, 2013 Greg Duncan, Assistant Chief Engineer of Operations Anaheim, CA Performance Based Maintenance Contracting in Tennessee (Experience One.
Unit 11 Insurance North Carolina Driver and Traffic Safety Education Association 1 INSURANCE UNIT 11.
Highway Maintenance and Preservation Needs
Output & Performance based Road Contracts (OPRC)
HUMPPA Program Managed Performance Based Maintenance Contract Espoo Pilot Project 2014 – 2019 Katja Levola, Pirkanmaan ELY-Centre International Partnership.
Houston ISD Board Workshop March 29, 2012 Performance Audit Report- Contract Recommendation Awards Process Presented by:
Dimming Lights have a Bright Future South Ayrshire Council SUMMARY Advances in modern lighting technology, along with changes in regulations, mean that.
Managing Capacity.
City of Monroe Department of Public Services Budget Presentation Prepared by the City of Monroe Department of Public Services Patrick M. Lewis, P.E., Director.
Airport Obstruction Issues GAA Workshop March 14 th, 2014 Presented by: Alan Hood, Georgia Department of Transportation Airport Safety Data Program Manager.
Current Status of Japanese Road Bridges and Future Perspective
$1 Million $500,000 $250,000 $125,000 $64,000 $32,000 $16,000 $8,000 $4,000 $2,000 $1,000 $500 $300 $200 $100 Welcome.
The Ohio Department of Transportation 1 I-280 Trench Project Public Meeting Monday, October 20, 2008 Ted Strickland, Ohio Governor James Beasley, P.E./P.S.
CMGC Contracting at UDOT Program, Projects & Lessons Learned
1 MW - Sonet Partners virtual session 12 th of October, 2009 Financial Issues.
$1 Million $500,000 $250,000 $125,000 $64,000 $32,000 $16,000 $8,000 $4,000 $2,000 $1,000 $500 $300 $200 $100 Welcome.
HOW WELL DO YOU KNOW THE COLLEGE’S PAPERWORK FLOW ? COLLEGE DOCUMENTS & SUPPORT THRESHOLD LIMITATIONS SERVICES REQUIRED EQUIPMENT VS NON-CAPITAL EQUIPMENT.
Environment Department Management Branch Pat Smyth Assistant Highway Engineer Hampshire Highways East Highway Maintenance.
Wisconsin Transportation Finance and Policy Commission Freight Rail Day 2012 October 26, 2012.
Winter Operations Overview Maryland Transportation Commission January 7, 2015 Russ Yurek, Director Office of Maintenance (410)
European Asphalt Pavement Warranties Scan September 14-28, 2002.
SIXTH ANNUAL AMOTIA CONFERENCE Asset Maintenance in Louisiana Rhett A. Desselle, P.E. 10/03/2014.
PUBLIC WORKS OPERATIONS: TRANSPORTATION Steve Hansen, PE Director of Public Works – Liberty, MO APWA PW Institute April 8, 2014.
Experiences of Winter Maintenance with Focus on Contract Maintenance Eugen Õis Director of Viru Road Office Estonian Road Administration.
Impacts of “MAP-21”on the National Bridge Inspection Program Tribal Government Coordination Meeting Date August 7, 2014 Presented by: Gary Moss, P.E. Acting.
On-Call Signal Contract Options for Discussion March 13, 2015 Cape Cod Joint Transportation Committee.
DEPARTMENT OF TRANSPORTATION. Mission Statement Plan, Design, Construct, Operate and Maintain the roadway system under the jurisdiction of Lee County.
OH 2-1 Agenda Sign in for all classes to earn credit for class Sign up for Presentations A test final test question will come from each of the group presentations.
Mark Shoenfelder, District Planner (507)
Highway Maintenance in Ontario Area Maintenance Contracts AASHTO Subcommittee on Maintenance Contract Management and Operations Branch Contract Management.
1 Maintenance Contracts for Rural Roads International Road Federation (IRF) German Agency for Technical Cooperation (GTZ) ) Economic Commission for Latin.
Bridge Engineering Section Bridge Rehabilitation.
1 Cutting Cost and Improving Quality through Performance Specified Road Maintenance Contracts International Road Federation (IRF) German Agency for Technical.
JOB ORDER CONTRACTING CONSTRUCTION SERVICES FOR FACILITIES MAINTENANCE AND OPERATIONS April 26, 2014 Presentation for Presented by Troy Alexander Project.
Hertfordshire Highways Overview & Scrutiny Committee Briefing 24 November 2011 Danny Kyan St Albans District Manager.
Highway Operations Section Technical Standards Branch Section overview.
New York State Department of Transportation I-190 and NY Route 265 Over the New York Power Authority Reservoir (BINS & ) PIN , Contract.
Circuit Rider Training Program (CRTP) Circuit Rider Professional Association Annual General Meeting and Conference August 30, 2012.
1 PS&E Plans, Specifications and Estimate. 2 Contract Letting Plans-Show what is being built Plans-Show what is being built Specification-Show how project.
1 Bridge Inspection Program Department of Transportation Legislative Audit Bureau September 2007.
Roads and Transport Limpopo 02 August Infrastructure Budget allocation for 2011/12 Upgrading of roads=R770,273m Preventative maintenance= R375,
1 PS&E Plans, Specifications and Estimate. 2 Contract Letting Plans-Show what is being built Plans-Show what is being built Specifications-Show how project.
September 28, 2015 PUBLIC WORKS 101. sandyspringsga.gov Adopted City Priorities – FY
MDT’s Pavement Marking Program Mike Bousliman Montana DOT MQA Peer Exchange October 12, 2004 Madison Wisconsin “Ensuring a consistent level of retro- reflectivity.
The Highway Fund – Planning, Measuring, and Reporting Mike Holder, PE, Chief Engineer 2015 CAPA / DOT Workshop February 24, 2015.
Region’s Core Services 202/17/2014 Integrity ∙ Excellence ∙ Respect Provide leadership, administrative support, procurement and budgetary and financial.
May 12, 2006 District Engineer Presentation1 Signing Performance Measures Report 2005 Data.
Road Maintenance in Estonia
2013 Roads and Sidewalk Capital Programs Roads and Parks Maintenance Department Development & Infrastructure Division December 2, 2013.
Public Works Roads Operations
European Asphalt Pavement Warranties Scan
Looking for best Landscape Design London Ontario service -
Road Maintenance and digitalization
Commission Agenda Item #2
Presentation transcript:

QUALITY ASSURANCE FOR CONTRACTED MAINTENANCE IN ONTARIO, CANADA Prepared for MQA Peer Exchange, Madison Wisconsin - Oct. 11/04

Overview Ontario Provincial Statistics Definition of ‘Maintenance’ in Ontario Maintenance Contract Types Maintenance Standards Quality Assurance Sanctions Challenges Questions/Contact Information

Ontario - Provincial Statistics 1 Million sq km (412,000 sq miles) and 10 million people Climate varies north to south, with south similar to Niagara Falls or Buffalo NY The Ministry of Transportation (MTO) is responsible for 16,500 centreline-kms (10,250 miles) and 2500 bridges 2 tunnels 29 remote airports 8 ferry services Contracted Maintenance Expenditures are about $200M CAD All MTO’s expenditures are only 1.5% of provincial government budget.

‘MAINTENANCE’ IN ONTARIO Routine Maintenance Pothole repair Shoulder grading Repair guide rail and fences Sweeping and debris removal Traffic signal and illumination- scheduled maintenance and repair Tunnel Maintenance Bridge cleaning, scheduled maintenance (lift bridges) and minor repair Sign replacement Grass cutting and weed control Winter Maintenance Plowing, liquids, sanding and salting Patrolling Visual Inspection At Least Daily in Winter Emergency Response to collisions, spills This answers the question “What is Maintenance?” Highlight the differences between maintenance and capital work – OFTEN CONFUSED BY THE PUBLIC AND IN SPEAKING WITH OTHER JURISDICTIONS. Capital ‘Construction’ contracts - bid by ‘item’ NOT INCLUDED Resurfacing Rebuilding

MAINTENANCE CONTRACT TYPES Area Maintenance Contracts (60% of Hwys.) Management and work by Contractor Vast Majority of work is Lump Sum Contracts contain a count of inventory, and a 3-year history of work performed 7-9 Year durations Proposal quality factor applied to price Managed Outsourcing Contracts (40% of Hwys.) Managed by MTO Staff, all work by Contractors Usually at a bid price per day with risk sharing on annual quantity Mostly Functional Contracts Mostly 5 Year durations

MAINTENANCE STANDARDS The Maintenance Quality Standards (MQS) set out maintenance requirements Many are time-based, such as x days to fix a given-size pothole or to repair collision damage to guide rail Mandatory patrolling frequencies are key to detection of defects At a minimum, maintenance contract requirements meet the MQS Bidding Methods – Looking for efficiencies in matching risk with the parties that can manage it. Labour relations issues Number of bidders, remote areas

QUALITY ASSURANCE Front line field staff include Superintendents who have several Coordinators, about one per 300 2-lane km, totalling 167 provincially Key program development in concert with the Maintenance Superintendents Committee Monitoring Manual sets out key requirements for each contract requirement Contractors also propose quality control procedures that are marked as part of proposal scoring. Bidding Methods – Looking for efficiencies in matching risk with the parties that can manage it. Labour relations issues Number of bidders, remote areas

SANCTIONS Non-performance for key items identified in contract leads to the issuance of a “Demerit Point” Thresholds of Demerit Points per year and overall can lead to loss of the contract Process has been extremely effective, contractors take demerits much more seriously than the associated financial penalties. Bidding Methods – Looking for efficiencies in matching risk with the parties that can manage it. Labour relations issues Number of bidders, remote areas

CHALLENGES Ability (and need?) to express and summarize performance quantitatively Time-based standards Change in a large and proud organization, particularly with contracts working well Bidding Methods – Looking for efficiencies in matching risk with the parties that can manage it. Labour relations issues Number of bidders, remote areas

FURTHER INFORMATION AVAILABLE AND SHARING WELCOMED Sonya Skinner, P.Eng. Head, Maintenance Contracts Ministry of Transportation of Ontario 905 704 2975 sonya.skinner@mto.gov.on.ca