Justin Tippy, Transit Manager Texas A&M Transportation Services

Slides:



Advertisements
Similar presentations
Mass Transit OSullivan Chapter 11. Outline of the Chapter Analyze some empirical facts about public transit in the United States Analyze the commuters.
Advertisements

Transport.tamu.edu Proposed Bus Route Changes for Fall 2014 Open Forum Monday, November 25, 2013 Aggie Spirit.
Presentation to the AMP Leadership Team Moving forward. April 17, 2013.
New Shuttle Routes. Current Health Sciences Shuttles – Four (4) different primary routes with excessive stops – A few single purpose routes – “Concierge”
Cheryl Thole, Jennifer Flynn CUTR/NBRTI, Senior Research Associates Transit in GIS Conference September 14, 2011 St. Petersburg, Florida.
South/West Corridor Improvements Service and Facility Alternatives September 9, 2014 Planning & Project Development Committee March 3, 2015.
South/West Corridor Transit Improvements PRIMO & ENHANCED AMENITIES PLANNING PHASE September 9, 2014 Planning & Project Development Committee August 11,
Siskiyou County Short Range Transit Plan Draft Final Report Presentation to the Steering Committee LSC Transportation Consultants.
Transport.tamu.edu Proposed Changes for Spring and Fall 2015.
Transport.tamu.edu Fall 2016 Proposed Route Changes.
Materials developed by K. Watkins, J. LaMondia and C. Brakewood Frequency Determination Unit 5: Staff & Fleet Scheduling.
Express/Rapid Bus Opportunities for Priority Bus Transit in the Washington Region Sponsored by National Capital Region Transportation Planning Board Chun.
Transit Choices BaltimoreLink Ad-hoc Committee Meeting January 12, 2016.
Walk Statistics.  The question has been asked: “Is Lomas a better BRT corridor than Central?”  The purpose of this analysis is to compare the two corridors.
GRTC Bus Rapid Transit Project July 17, Agenda 1.BRT Concept 2.Project Goals 3.Project Benefits 4.Project Corridor 5.Proposed Multimodal Access.
Transportation Fee FY2016 January 16, Services Provided by Transportation Stinger Buses - Three routes with 10 buses operating weekdays and two.
2   Provides On And Off-Campus Shuttles   Increases Parking Availability   Reduces Traffic Congestion   Reduces Car Trips to Campus and Supports.
Proposed Route Modifications
Transportation Survey General Information
Multi Agency Exchange May 16, 2017.
Integrating Transit and Highway Solutions In High Volume Corridors
Cache County School District Pupil Transportation
APTA Sustainability and Public Transportation Workshop Benjamin Smith
Move New Haven CEC Meeting #2:
City Bus Information.
CET Service Proposal.
US 36 BRT/ Flatiron Flyer Proposed Service Plan
About Texas A&M College Station, Texas
Transportation Summit
City of Beaumont SHORT RANGE TRANSIT PLAN FY 2014/15 - FY 2016/17
Budget Revenue Permit and housing permit revenue based on headcount
Capital Metro Long-Range Financial Forecast ( )
Service Routes and Community Transit Hubs: Right Sizing Transit
Campus Services.
Propose March 2018 Service Improvements
Propose March 2018 Service Improvements
Prince George Transit : Fall 2017 Expansion
D Line Station Plan Overview
Orange County Transportation Authority Micro-Transit Pilot Program
Insert image or graphic
Transportation and Parking Services
A&M Association of Commuter Transportation July 31, 2007
D Line Station Plan Overview
FUTURE SERVICE PLAN OPTIONS COMMUNITY FORUM FEBRUARY 6, 2010
D Line Station Plan Overview
D Line Station Plan Overview
D Line Station Plan Overview
different Approaches different generations
SERRA CATHOLIC SCHOOL – SOUTH BUS ROUTE
Bus Rapid Transit Study
PARTNERSHIPS An experiment! Public Private Partnership
A B A B C D C D A B A B C D C D A B A B C D C D A B A B C D C D
LRT, GRT, PRT Comparison Peter Muller, PE Ingmar Andreasson, Ph. D.
Adam Parast Kendra Hartstrom April Pust Sean Liner
D Line Project Overview
Justin Tippy, Transit Manager Texas A&M Transportation Services
Proposed Service Changes 2018
WELCOMES YOU TO THE COMMUNITY OPEN HOUSE OCTOBER 2018.
CRENSHAW CORRIDOR SHUTTLE PLAN
1. Where should buses run and with what frequency?
AC Transit Proposed Fare Structure Revision & Pricing Changes
RTC RIDE Service Improvement Recommendations
Central Avenue Rapid Transit
Comparative Visualization
Travel Case Study 2018 Andrew Broadbent
Reimagine RTS Public Hearing
Transportation Study Newark BOE 5/6/2019.
Draft Fiscal Year Bus Service Plan
City of Bishop 2nd Annual Town Hall
Putnam County Transportation 2019 Report
Presentation transcript:

Justin Tippy, Transit Manager Texas A&M Transportation Services Transit Fall 2019 Changes Justin Tippy, Transit Manager Texas A&M Transportation Services

Current Route 34 Services South College Station around Frat Row and the Park and Ride at First Baptist Church 2 buses on route with 18 minute headways Route 34 ridership places it in the bottom 3 among off campus routes

Current Route 34 Want to preserve highest ridership stops and maximize efficiency for entire route Compared to Route 22, Route 34 carries about 1800 passengers/day with 3 buses while Route 34 carries about 850 with 2 buses By adding The Barracks stop to Route 34, we can maximize efficiency and provide more timely service to all riders

Current Route 40S Services The Barracks in south College Station 2 buses on route with 22 minute headways Route 40S ridership places it in the bottom 3 among off campus routes

Proposed Route 34 Combine Routes 34 and 40S 3 buses on route with 15 minute headways Reduces number of buses used and provides more frequent and efficient service Moves current stops along Navarro to Welsh, resulting in .4 mile walk to new stop

Current Route 03 Services areas between MSC and White Creek Apartments 3 buses on route with 7 minute headways

Current Route 09 Services areas between the MSC and Vet School 2 buses on route all day with 3rd bus running from 10a - 3p 10 and 7 minute headways

Proposed Route 03 Combine Routes 03 and 09 into one route 5 buses on route all day, with a 6th bus between 10a and 3p 6 minute headways with 5 buses and 5 minute headways from 10a - 3p Service all areas with greater frequency and more capacity