INTERCONNECT PRODUCT FORUM Thursday 3 rd February 2011 www.btwholesale.com.

Slides:



Advertisements
Similar presentations
The following 5 questions are about VOLTAGE DIVIDERS. You have 20 seconds for each question What is the voltage at the point X ? A9v B5v C0v D10v Question.
Advertisements

John Williams LAPSI/EVPSI 10 July 2012 Standardisation of Licensing – the UK Example.
Market Reform Forum Andy Brookes, MRPO Roy Laker, ACORD 29 March 2007.
With LMG Secretariat LMG Forum October 2010 Christopher Croft, LMGS Rob Gillies, LMA Tim Carroll, Chaucer.
With Market Reform Office Market Reform Forum Whats new this month? Updates on: Aon and Ri3K; endorsements Andy Brookes, MRO Ian Summers, Director of Change,
Presentation of the proposed Annex 19 – Safety Management
1 Linked List Demo Node third = new Node(); third.item = "Carol"; third.next = null; Node second = new Node(); second.item = "Bob"; second.next = third;
Interconnect Policy & Contract HL SAN + 1 Month (Max), unless extension requested by Operator,and agreed by BT, due to insufficient.
11 Ofcom Consumer Switching final statement Next steps for BT Bev Bytheway-Jackson WBC Product Manager 10 th February 2014.
Wholesale Line Rental Consumer Issues Task Group 5 August 2002.
Enterprise and Industry Agenda Item Game Consoles Product Group 'Sound and Audio Equipment' Consultation Forum 9 October 2012 Ecodesign Directive 2009/125/EC.
Draft Framework Guidelines on Capacity Allocation Mechanisms for the European Gas Transmission Network Benoît Esnault, CRE Presentation Workshop Ljubljana,
Standard Contract Forum 6 July Customer Suite, BT Centre, London.
STANDARD CONTRACT FORUM MONDAY 13 TH DECEMBER 2004 AT CUSTOMER SUITE, BT CENTRE 81 NEWGATE STREET LONDON EC1A 7AJ KEITH MITCHINSON.
2012 JANUARY Sun Mon Tue Wed Thu Fri Sat
Standard Contract Forum 24 April Customer Suite, BT Centre, London.
Standard Contract Forum 04 December Customer Suite, BT Centre, London.
Standard Contract Forum 31 January Customer Suite, BT Centre, London.
STANDARD CONTRACT FORUM THURSDAY 28 TH OCTOBER 2004 AT CUSTOMER SUITE, BT CENTRE 81 NEWGATE STREET LONDON EC1A 7AJ KEITH MITCHINSON.
PPC Industry Forum, 5 March Managed Bandwidth Services BTW Products and Strategy Disclaimer BT has taken reasonable care to check that the information.
Standard Contract Forum 24 January Customer Suite, BT Centre, London.
Consult21 Information is subject to change and is for discussion purposes only. Any dates/timings are the current anticipated timescales and may be subject.
Standard Contract Forum 26 March am Customer Suite, BT Centre, London.
Standard Contract Forum 12 February Customer Suite, BT Centre, London.
STANDARD INTERCONNECT AGREEMENT REFERENCE OFFER (DECEMBER 2003) 29 th January 2004.
Standard Contract Forum 22 July Customer Suite, BT Centre, London.
Energy for the Future Belene Nuclear Power Plant Project Status.
Interconnect Product Forum 21 st October STANDARD CONTRACT FORUM SESSION 21 October 2009 Keith Mitchinson.
WORD JUMBLE. Months of the year Word in jumbled form e r r f b u y a Word in jumbled form e r r f b u y a february Click for the answer Next Question.
PPC Industry Forum, 4 December Managed Bandwidth Services BTW Products and Strategy Disclaimer BT has taken reasonable care to check that the information.
ONUS 3rd External Users Forum Oftel 17th June 2003.
Standard Contract Forum 2 September 2004 Charles Walker 2 September 04.
Implementation & Migration Working Group 18 th January 2006 Kevin Young Interconnect & Numbering Services The information in this presentation relates.
Interconnect Policy & Contract
Legal and Business Services Legal and Business Services Standard Contract Forum 29th January 2004 John Ewbank.
Partial Private Circuits Kalpesh Brahmbhatt 31 October 02.
Consult21 Information is subject to change and is for discussion purposes only. Any dates/timings are the current anticipated timescales and may be subject.
PPC Industry Meeting 8 th September Data & Connectivity Development. Wholesale Product Management (WPM) Disclaimer BT has taken reasonable care.
11 User Pays User Committee 14th September Agenda  Minutes & Actions from previous meeting  Agency Charging Statement Update  Change Management.
2011 Calendar Important Dates/Events/Homework. SunSatFriThursWedTuesMon January
Pathfinder Working Group BT Centre Showcase, Registration: 9.45 am Start time: am.
PN UNC Workgroup Invoicing 24 th October Objectives of the Workgroups To determine detailed business requirements Consider/review comments made.
APA CONTRACTS TO POST-2017 ALLOTTEES July 24 - Letter to all Allottees Inviting Comment August 10 - Allottee Response August 21 - Workshop August 28 –
STANDARD CONTRACT FORUM SESSION 2 February 2010 Keith Mitchinson.
Standard Contract Forum 24 May am Customer Suite, BT Centre, London.
July 2007 SundayMondayTuesdayWednesdayThursdayFridaySaturday
STANDARD CONTRACT FORUM CREDIT VETTING 24 MAY 2004.
Public Consultation Session: Consultation and Transparency Requirements for Offshore Petroleum Activities Francesca Astolfi A/g General Manager, Offshore.
ICT industry briefing Review of Procure IT v3.1 Customer Contract 16 February 2016.
PRESENTATION OF MONTENEGRO
Informal document GRE-77-18
Simplification of the UN Lighting and Light-signalling Regulations
IWVTA-GRPE Ambassador
Transmitted by the IWVTA Informal Group
CSS Update for CoMC 19th September 2018
Exit Capacity Substitution and Revision
Consideration of issues raised by UNC Modification Proposal 0244
UKL Committee - DN Interruption Update
CDSP Service Document amendment - high-level activity description*
Consideration of issues raised by UNC Modification Proposal 0244
Working Party on General Safety Provisions (GRSG) General information
Review of the 1958 Agreement
GRP Progress & Plans The GRP project was established to deliver an updated design utilising fully supported hardware and software for Gemini. GRP is replacing.
Implementation Approach Distribution Workgroup – June 2014
EU legislation on noise emission in the environment by equipment for use outdoors: latest developments September 2018 European.
Habitat Changes and Fish Migration
2015 January February March April May June July August September
Habitat Changes and Fish Migration
Working Party on Noise (GRB) General information and WP.29 highlights
Presentation transcript:

INTERCONNECT PRODUCT FORUM Thursday 3 rd February

Thursday 3 rd February Keith Mitchinson Head of Carrier Contracts

Standard Contract Forum Session AIT New AIT Regime launched 1 March SIA General Contract Review proposed changes to notification by fax – investigations ongoing An AIT Contract Review is scheduled for March will generally follow contract review process agreed as part of 2010 SIA General Contract Review discussions i.e. Step 1 BT invites CPs to identify AIT review issues Step 2 CPs submit AIT review issues Step 3 BT consolidates, and adds it issues Step 4 Initial meeting Target to complete in 3 months [Note: BT committed to AIT Report to Ofcom August 2011 Thursday 3 rd February

Standard Contract Forum Session - continued BTW CREDIT VET POLICY General BTW policy – not SIA or PPCs New draft policy circulated informally for comment October 2010 (Draft issue 9 - Briefing Reference ) Single CP responded – essentially repeat of earlier issues/discussions Minor changes to draft: Commitment to inform of product changes Interest on deposits increased to Bank of England rate Appendix - listing of products – separated to ease addition of new products BTW Credit Vet Policy Issue 9 notified 2 February 2011 – to be effective 1 May 2011 Thursday 3 rd February

Standard Contract Forum Session – continued SIA General Contract Review CP/BT issues collected and circulated June 2010 – that was the last general briefing to wider industry Participants: Everyone Everywhere, C&W, Verizon, Three, Gamma, VirginMedia, Colt, Carphone Warehouse Negotiation meetings held July, August, November, January Time to review progress, and re-brief wider industry Progress Thursday 3 rd February

Standard Contract Forum Session – continued SIA General Contract Review reftitleprogress C1Inequitable notice periodsPURSUE VIA IPF: CPs want BT to increase notice from 28 to 56 days; BT say would consider if 90 days reduced to 56 – some CP support. Propose discussion informally with Ofcom – Gamma to lead C2Right for operators to reject BTs NCCNs for non- regulated services DEADLOCK CPs want right to reject BTs unregulated NCCNs; BT does not agree (note C1 would impact situation) Thursday 3 rd February

Standard Contract Forum Session – continued SIA General Contract Review refissueprogress C3Obligation on BT to accept operators OCCNs for regulated services PURSUE VIA IPF: Agreed in principle for price control services – definition of scope and process to be developed/agreed C4RetrospectionDEADLOCK – REVIEW AT IPF CP s want favourable determinations to be automatically applied in transit situations. BT consider to be unreasonable and impractical. [BT looking for pre-agreement for more granular discussion ] Thursday 3 rd February

Standard Contract Forum Session – continued SIA General Contract Review refissueprogress C5Retrospective rate changes relating to Third Party Operators or Overseas Systems DEADLOCK CPs want to limit BTs ability to increase prices retrospectively to be limited to regulated or determined prices. BT considers to be unnecessary, unreasonable and impractical C6Alignment of Interest RatesDEADLOCK CPs want to raise Oftel Interest Rate to match Default Interest Rate. BT considers unreasonable. Thursday 3 rd February

Standard Contract Forum Session – continued SIA General Contract Review refissueprogress C7Administrative burden of faxes for submitting AIT claims PURSUE VIA SUB-GROUP – MIGRATE TO 2011 AIT CONTRACT REVIEW C8OCP-specific transit charges DEADLOCK WITH VIRGIN MEDIA VM want to allow operator specific charges only to be implemented with agreement of originator. BT considers unreasonable and impractical C9Liability cap levelNOT PURSUED BY INDUSTRY GROUP Thursday 3 rd February

Standard Contract Forum Session – continued SIA General Contract Review refissueprogress B1Contract Review processAGREED as amended B2Update Annex AAGREED as amended B3Change charge notification period for IDD AGREED as amended B4Consolidate all contracts to latest Reference Offer TBA Thursday 3 rd February