OUTSOURCING INDUSTRIAL WASTEWATER TREATMENT Jerzy Kołłajtis – Magda Trybuch –

Slides:



Advertisements
Similar presentations
CH 4: Finding Your Unique Selling Point 14 January 2014 Lectured by: OR Vitou.
Advertisements

Managing the Health and Safety of Contractors
A Joint Code of Practice Objectives and Summary Presentation
Organization of Primary Entities
Project Procurement Management
Fashion Businesses Fashion Marketing.
UMC for Consulting & Services. UMC UMC for Consulting & Services UMC Profile UMC Profile UMC Range of Consulting Services UMC Range of Consulting Services.
Design-Build: RISKS OR REWARDS for the Consulting Engineer?
Roadmap for Sourcing Decision Review Board (DRB)
Project Delivery Approaches for Wastewater Utilities in Minnesota June 24, 2008 Metropolitan Council Environment Committee.
Pre qualified Contractors or Professional Contractors: Role of BPP in stopping quackery in the Water Industry Presented by Engr. Emeka Ezeh OFR Director-General,
Governor’s Center for Efficient Government. Mission The mission of the Governor's Center for Efficient Government is to promote fair and transparent best.
1 Opportunities Related to EPC Initiatives Support Services Management - NWC.
UNRESTRICTED Infrastructure Assessment as Viewed by Technology Holders IAEA Technical Meeting December 10-12, 2008 R. Godden.
Module 11 Session 11.2 Visual 1 Module 11 Executing and Controlling the Work Session 11. 2: Managing Contracts.
Contractor Safety Management
Copyright Course Technology Chapter 11: Project Procurement Management.
Week 14 Project Procurement Management
Project Procurement Management
The Outsourcing Process
Chapter 12: Project Procurement Management
Presentation By: Chris Wade, P Eng. Finally … a best practice for selecting an engineering firm.
KING FAHD UNIVERSITY OF PETROLEUM AND MINERALS CEM-512 Value Engineering Think Value Engineering Prakash Acharya Charles Pfrommer Charles Zirbel JOURNAL.
IT Outsourcing Management
The Australian/New Zealand Standard on Risk Management
Month Year Working together to achieve your desired outcomes, by delivering service excellence. Building Engineering Solutions for the optimisation of.
The Analyst as a Project Manager
Lecture(3) Instructor : Dr. Abed Al-Majed Nassar
TRP Chapter Chapter 4.2 Waste minimisation.
“Specializing in Operational Excellence” Outsourcing Is it right for you? Texas Technology Showcase Houston, Texas March 18, 2003 Integrated Process Solutions.
Joint Business Plan Madhurjya K. Dutta 1mk_dutta Sept 2010.
Genesis Solar Module Brochure ™
FIDIC CONFERENCE 2005, BEIJING Workshop 13 Design & Build - Role of Consulting Engineers in the Tender Process Tse Yau Shing.
Construction Category Management Planning Version 1.1 (May 2015)
Honoraria for Design Build Projects Methodology Assessment Matrix.
U.S Conference of Mayors August 2004 Mayor’s ’04 Metro Agenda Bipartisan Priorities Statement Directed for candidates in Presidential and Congressional.
Sustainability and Total Cost of Ownership Strategies for Higher Education.
1.0 INTRODUCTION Seán Moran. SIMPLE? Commissioning is a complex issue requiring: Planning Leadership Teamwork Training Communications.
Division of Pollution Prevention and Environmental Assistance Industrial Assistance Section John Burke
Contractors & contracts
12-1 Project Management from Simple to Complex This work is licensed under the Creative Commons Attribution-Noncommercial-Share Alike 3.0 Unported.
Chapter 6 Sourcing. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Explain the difference between.
Chapter 13: Developing and Implementing Effective Accounting Information Systems
CERTIFICATION In the Electronics Recycling Industry © 2007 IAER Web Site - -
© 2008 IBM Corporation Challenges for Infrastructure Outsourcing July 29, 2011 Atul Gupta Vice President, Strategic Outsourcing, IBM.
QUALITY ASSURANCE MANAGEMENT CONTROLS Chapter 9. Quality Assurance (QA) Management is concerned with ensuring: 1) The information system produced by the.
Copyright 2009  Understand the importance of project procurement management and the increasing use of outsourcing for information technology projects.
Managing Your Energy Portfolio In A Greener World January 18 &19, 2007.
J.Kulp. 3/06 Why Outsource? A summary discussion of why companies decide to outsource. Simply stated, the decision to outsource is made to positively effect.
WSSB Capacity Enhancement Workshop1.  Definition: Public-Private Partnerships (PPPs) are a form of legally enforceable contracts between the public and.
Chapter 11: Project Procurement Management
January 14, The NAMC LCDP Will Provide A Proven Contractor Capacity Building Program For The Public and Private Sector.
Outsourcing/Offshoring. Outsourcing Act of transferring some recurring internal activities to outside providers, set in a contract Reasons / Benefits:
PRE-PLANNING FOR CONSTRUCTION PROJECTS. OVERVIEW ASSESSING OWNER CAPABILITIES ANALYSIS OF RESOURCES REGULATORY REQUIREMENTS SITE DEVELOPMENT REVIEWING.
1 Energy/Compost Facility Action Plan City Council Meeting July 2, 2012.
International Safety Rating System
I P M 1 City of Fort Worth City Council Presented by Doug Rademaker, Deputy Director, PMO Ken Hall, IPM Program Manager, CH2M HILL October 6, 2009 I n.
UTILITY PARTNERSHIP CITY OF STOCKTON & OMI / THAMES WATER SERVICE CONTRACT.
Systems Analysis and Design in a Changing World, 4th Edition
Planning for Information System
Reconstruction site Investigation, Planning, Scheduling, Estimating and Design Eng. Fahmi Tarazi.
Ch 11 - Procurement Management Learning Objectives
Outsourcing “A practice used by different companies to reduce costs by transferring portions of work to outside suppliers rather than completing it internally.”
Enterprise Content Management Owners Representative Contract Approval
PROJECT DELIVERY METHODS
Controlling Project Cost and Schedule
How Small Developers and EPC Contractors Can Add PPA Financing to their Arsenals John Langhus, VP Business Development Midwest Solar Expo 2019 New Energy.
Q2 Updates on 2019 Board Priorities
Q2 Updates on 2019 Board Priorities
Honoraria for Design Build Projects Methodology Assessment Matrix
Presentation transcript:

OUTSOURCING INDUSTRIAL WASTEWATER TREATMENT Jerzy Kołłajtis – Magda Trybuch – (+48 22) Bytomska 5A, Warszawa ADVENT-ENVIRON

WHAT IS OUTSOURCING? Replaces existing in-house function Contractor will reduce industry costs May provide better service Contractual arrangements are key Established in municipal market Growing trend in industrial market

WHAT CAN BE OUTSOURCED? Staff Services Programs Utilities (water, power, wastewater treatment, waste disposal) Equipment (i.e. leasing) All of the above

DEGREES OF OUTSOURCING Process & Detailed Design Engineering & Construction Startup Support & Operator Training Troubleshooting Problems Troubleshooting Problems Technical Support Technical Support Operations Labor Operations Labor Contract Management Contract Management Purchase Assets, i.e Own/Operate Traditional contract engineering services Applicable to new plant or upgrades Ensures smooth transition to client control Can help safeguard warranties Emergency response Not cost-effective if it becomes routine Identify and avoid/reduce problems Ranges from data review to operator direction Manpower service Client management remains in place Assume control of all labor, budget, reporting Establish performance criteria Can transfer more risk to operator Detailed contracts needed to address risk

REASONS TO OUTSOURCE Go to your core competencies Redirect management time Reduce operating costs Better performance Capital upgrades can be annualized Selling assets improves bottom line

POTENTIAL PROBLEMS Perceived loss of control Resistance from in-house staff Define performance specifications? Upfront additional effort Transfer of staff to contractor Contract can reduce flexibility

WHAT ABOUT COMPLIANCE? Industry must control this Contractor image versus yours Responsibility for any violations? Who is the permit owner/operator? Contractor has core competency More outside resources available

PATH TO OUTSOURCING Determination of Need Decide on How to Implement Due Diligence Business Proposal Confirm Final Scope Negotiate Contract Transition to Provider Clearly define corporate or site driving force Get preliminary buy-in from stakeholders What is the upper & lower limit for contractor scope Identify qualified contractors Open book or bid package Prepare responses to bidder questions Range on bids is proportional to info provided Normalize bids based on your priorities Scope is firmed up for contracting stage Confirm handling of development costs Formalize the risk/reward equation Very time consuming Provide qualified client liaison person Contractor A-team onsite for short term

TREATMENT PLANT BUDGET

CONTRACTS Payment terms Establishing performance criteria Extent of liabilities Share risk & savings Cost of termination Can lock out creativity

SUMMARY OF OUTSOURCING Focus on core competencies Lower operational costs Annualize future capital costs Contract is key Can increase industry overall control Needs commitment from all Assess contractor performance