Maintenance at ALBA facility: Strategy for the conventional services

Slides:



Advertisements
Similar presentations
Data Center Design Issues Bill Tschudi, LBNL
Advertisements

1 Procuring a Design Project engineers perspective on starting the design process and establishing the A/E scope of work Frank C. Quigley General Engineer.
1 Optimizing the Efficiency of the NCAR-Wyoming Supercomputing Center Ademola Olarinde Team Member: Theophile Nsengimana Mentor: Aaron Andersen August.
Tas seminar/demonstration on Part L 2006 of the Building Regulations Presented by Alan Jones EDSL February
Controlling Sutardja Dai Hall Andrew Krioukov Stephen Dawson-Haggerty, Jay Taneja David Culler.
André Augustinus 16 June 2003 DCS Workshop Safety.
HVAC: heating, ventilating, and air conditioning this is a thermostat: it sends signals to the heating/cooling system.
Engineering Department EN Cooling and Ventilation issues 1 FUTURE EXPLOITATION OF THE EAST AREA EN-CV Michel OBRECHT.
BRE Energy Efficient Office of the Future
The students: Mohammad Shabaro ( ) Mahmoud Mousa ( ) Yosri Asfour ( ) Supervisor: Dr. Iyad Assaf 1.
FACILITIES AND PROPERTY MANAGEMENT – BEMS Plant and Equipment Operating Hours.
September 18, 2009 Critical Facilities Round Table 1 Introducing the Heat Wheel to the Data Center Robert (Dr. Bob) Sullivan, Ph.D. Data Center Infrastructure.
 Install new air cooled high efficiency screw chiller (variable speed)  Install new fan coils with ECM motors and low temperature heating coils and proper.
Lecture Objectives: Model HVAC Systems –HW3 Asignemnet Learn about eQUEST software –How to conduct parametric analysis of building envelope.
ILC Mechanical & Electrical Review Conventional Electrical System Americas Region Design Summary March 21, 2012 Randy Wielgos, FNAL Parsons Electrical.
Central Region Discussion Power and Cooling GDE Beijing-CFS.
31, May 2007 ILC DESY 07 1 Surface Building Design Development Tom Lackowski GDE.
CV activities on LHC complex during the long shutdown Serge Deleval Thanks to M. Nonis, Y. Body, G. Peon, S. Moccia, M. Obrecht Chamonix 2011.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS – II EFAC Review Conventional Facilities Briefing Marty Fallier Director for Conventional Facilities National Synchrotron.
Lecture Objectives: Finish with HVAC Systems Discuss Final Project.
LCC Linear Collider Collaboratio ILC - CFS 12 November 2013 LCWS13 Tokyo University 1 Site-specific CF design from TDR LCWS13, 12 November 2013 Atsushi.
Global Design Effort - CFS Baseline Assessment Workshop 2 - SLAC Positron Source Relocation 1 BASELINE ASSESSMENT WORKSHOP 2 CONVENTIONAL FACILITIES.
Lecture Objectives: Specify Exam Time Finish with HVAC systems –HW3 Introduce Projects 1 & 2 –eQUEST –other options.
Drugs Addicts Rehabilitation Center
Accelerators for ADS March 2014 CERN Approach for a reliable cryogenic system T. Junquera (ACS) *Work supported by the EU, FP7 MAX contract number.
Design of HVAC systems for bld 3862 – LHCb control room and for bld 2885 – LHCb new workshop.
Infrastructure Improvements 2010 – November 4 th – Hepix – Ithaca (NY)
Global Design Effort1 September 20-22, 2006 MAC Review Power and Water breakout (mixed results) Marc Ross GDE.
Architectural Engineering Senior Thesis Mechanical System Redesign Saint Joseph Medical Center Chris Nicolais.
Lecture Objectives: Clarify issues related to eQUEST –for midterm project Learn more about various HVAC - economizer - heat recovery Discuss about the.
Nikhef/(SARA) tier-1 data center infrastructure
COOLING & VENTILATION FOR THE DRIVE BEAM TUNNEL M Nonis – EN/CV – 16/9/2009 CLIC TWO BEAM MODULES REVIEW
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS – II CFAC Review Conventional Facilities Briefing Chilled Water and Temperature Stability Chris Channing Sr. Project.
Building Systems Integration - Energy and Cost Analysis The Milton Hershey School New Supply Center Justin Bem AE Senior Thesis – Spring 2007 Mechanical.
Overview of the main events related to TS equipment during 2007 Definition Number and category of the events Events and measures taken for each machine.
2005/06/22 ALBA Building Project David Carles Engineering Services Division - CELLS.
Jesse A. Fisher Mechanical Option Spring 2005 Riverpark Corporate Center, Phase 1 Salt Lake City, Utah.
Lecture Objectives: Differences in Conduction Calculation in Various Energy Simulation Programs Modeling of HVAC Systems.
Design considerations for the FCC electrical network architecture FCC week 2016, Rome, April 2016 Davide Bozzini - CERN/EN/EL With the contribution.
COOLING & VENTILATION PLANTS M. Nonis – CERN EN Department / CV Group Annual Meeting of the FCC study – Rome 14 th April 2016.
ESS Cooling System - Interface with DTL 1 John Jurns Cooling System Engineer.
5-year operation experience with the 1.8 K refrigeration units of the LHC cryogenic system G. Ferlin, CERN Technology department Presented at CEC 2015.
ESS Cooling System - Interface with RFQ 1 John Jurns Cooling System Engineer.
Technical Review EHN1 Extension Cooling Systems and Pipework Jérôme Rodary / EN-CV.
West Cambridge Data Centre Ian Tasker Information Services.
CV works in the non- LHC accelerator complex during 2008 and plans for 2009 ATOP days 2009.
CV Activities for PSB-LIU POPS-B (new MPS for the PSB-LIU) B 245 PSB Demi water cooling plant Stefano Moccia, EN-CV Meeting 07/03/16.
FCC Infrastructure & Operation Update on the cryogenics study Laurent Tavian CERN, TE-CRG 28 October 2015.
Infrastructure status and plans at CERN 1) W. Weingarten/CERN TTC Milano 28 February - 3 March W. Weingarten/CERN 1)Most of the slides are based.
Update on the PSB Cooling and Ventilation Systems
SNS COLLEGE OF ENGINEERING Coimbatore-107 Subject: Thermal Engineering
SNS COLLEGE OF ENGINEERING Coimbatore-107 Subject: Thermal Engineering
Review of the International Linear Collider (ILC) Electrical and Mechanical System Design to be held at CERN on 21 March, 2012 The purpose of the Review.
The Data Center Challenge
ARAC/H/F Air-cooled water chillers, free-cooling chillers and heat pumps Range: kW.
Internship final presentation
CERN Data Centre ‘Building 513 on the Meyrin Site’
SPS cryogenic proximity equipment and SM18 validation
HVAC Basics Arkan Arzesh HVAC – Heating, Ventilation, Air-conditioning.
Luigi SCIBILE on behalf of the CERN SMB-SE group
HVAC SYSTEM DESIGN ALMAQASED HOSPITAL
Cooling systems for HL-LHC (WP17.3)
CEPC Cryogenic System Jianqin Zhang, Shaopeng Li
COOLING & VENTILATION INFRASTRUCTURE
Installation XFEL Tunnel WP 34
EN-CV: P8 systems and Detector Cooling
INNOVATION lab MEP MECHANICAL/ELECTRICAL/PLUMBING :
NEW ARISTON STORAGE BOILERS March, 2009.
Heating, Ventilation and Air Conditioning HVAC
‘‘ BUILDING AUTOMATION’’
Presentation transcript:

Maintenance at ALBA facility: Strategy for the conventional services

Contents: 2 1. Overall Layout 1.1 Electrical supplies 1.2 Water supplies 1.3 HVAC distribution 2. Strategy 2.1 Assets 2.2 Workers 2.3 Maintenance 2.3.1 Internal Orders 2.3.2 CMMS Software 3. Conclusions

1. Overall Layout 1.1 Electrical supplies 3 1.1 Electrical supplies ALBA is directly connected to 220kV of the high voltage net, Through a 20 MVA transformer the voltage is reduced to 220/25 kV and transmited to ALBA ALBA has 25kV redundancy through the nearby congeneration plant. Finally, the voltage is reduced from high to low voltage 25/0,4 KV.

1. Overall Layout 1.1 Electrical supplies S.E. CODONYERS 220/25 KV ST4 2 X 25KV 2 X 25KV ST4 COGENERATION PLANT ALBA 1,8 Km 1,8 Km 25KV 0,7 Km

1. Overall Layout 5 1.1 Electrical supplies: ALBA Block Diagram and type of supplies Non Preferential: lighting, air conditioning…(Network) Preferential: lifts, hydraulic circuits, part of the lighting (Network + Diesel generators) Critical: CPD, control room, Beam lines, etc (Network + UPS + Diesel generators) Clean: magnets, RF plants or cooling inside tunnel(Network + Dynamic UPS)

1. Overall Layout 1.2 Water Supplies: in two ways 6 1.2 Water Supplies: in two ways External: Cogeneration plant also supplies CW between 4 to 9ºC with about 4000 kW of cooling power for DW and CW (up to 6,2MW of cooling capacity), and HW up to 90ºC with 110 kW of heating power. Internal: 4 chillers, 2 of 1,3MW and 2 o 2,9MW in different combination, depending on the loads; and two boilers of almost 700kW heating capacity. From technical building using heat exchangers: CW is supplied to HVAC at 7ºC and returns at 12ºC, 4 rings and distribution to the Workshop HW is supplied to HVAC at 60ºC and returns at 45ºC, 2 rings and distribution to the Workshop DW is supplied to magnets and other equipment at 23ºC and returns at 27ºC by using 4 rings: Service Area, Booster, Storage and Experimental Hall with a common return.

1. Overall Layout 1.2 Water Supplies: Cold Water Deionized Water 7 1.2 Water Supplies: Cold Water Deionized Water Hot Water Cooling Tower

1. Overall Layout 1.3 HVAC distribution: 8 1.3 HVAC distribution: Tunel: Four units to keep 23ºC±0,2 for all the tunnel and one unit dedicated to the LINAC. Relative humidity at 49-50% Tunnel: available power 45,5 kW each unit with an air flow of 15.500 m3/h LINAC: available power 17,6 kW with an air flow of 6.000 m3/h. Each quadrant has 7 temperature sensors to control the stability required inside the tunnel

1. Overall Layout 1.3 HVAC distribution: 9 1.3 HVAC distribution: Beam Lines: each BL has the possibility to keep a comfortable temperature inside the Control Hutch by using a simple fan coil (old BL’s) or a dedicated unit (MIRAS) The available power for each Beam Line is around 7 kW, only for the Control Hutch. MIRAS has a maximum of 23,4 kW of power for all the line (Optical Hutch, Control hutch and a Meeting Room)

1. Overall Layout 1.3 HVAC distribution: 10 1.3 HVAC distribution: Experimental Hall: six units dedicated to the EH and two more only to cool down during the summer warm conditions. EH is divided in six section, every section has six main temperature-humidity sensors and six extra contiguous sensors (three per side) to control the temperature. Data for CL11: Air flow: 40.000 m3/h CW power 135 kW HW power 94 kW Data for CL12: Air flow: 12.000 m3/h CW power 175 kW

1. Overall Layout 1.3 HVAC distribution: Office Air conditioned unit 11 1.3 HVAC distribution: Offices and other uses: depending on the occupancy, the number of units has been increasing during the 10 years of operation. In other spaces, like the RF lab, Electronic Lab or UPS rooms, a dedicated unit to control the temperature Office Air conditioned unit SA UPS room RF Lab:

2. Strategy 12 Few years ago, in AMMW2013… Objective, main target: – Maximum reliability at minimum cost. Strategy: – Keep in-house all knowledge necessary to operate and maintain the facility. – In-house management of the whole maintenance of the facility. – Optimize the maintenance cost related to personnel, spares and reposition.

2. Strategy 13 2.1 Assets Electrical assets: 3 electrical transformers rooms, 4 dinamic UPS, static UPS, 100 electrical cabinets… Pumps: CW, HW and DW, almost 60 units 3 Air compressors 57 AHU’s 2 Boilers 7 chillers 14 Heat exchangers 2 Cranes 37 Toilets units 500 doors… 3 lift Probes: temperature, pressure, conductivity, etc Almost 3800 assets with some kind of maintenace, but not each asset has its work procedure

2. Strategy 2.2 Workers Constantly 1 Electrical technician 14 2.2 Workers Constantly 1 Electrical technician 1+3 mechanical technician 10 cleaning people 10 security people Temporaly Almost 70 external suppliers depending on their work

2. Strategy 15 2.3 Maintenance 2.3.1 Internal Orders between 2010 to 2011: COFELY CMMS Prisma Planing to infrastructures Internal order to workshop Work done Final report from COFELY

2. Strategy 2.3 Maintenance 2.3.2 CMMS Software from March 2012: ALBA 16 2.3 Maintenance 2.3.2 CMMS Software from March 2012: ALBA CMMS Prisma Planing executed by infrastructures engineers Direct Work Order to technitians Work done Knowledge of the installtion, control of critical spare parts

2. Strategy 2.3 Maintenance 2.3.2 CMMS Software 17 2.3 Maintenance Facility 2.3.2 CMMS Software PRISMA3 (Sisteplant), use of excel to do the massive loads Building Zone Prisma Users Workers Installation Asset Calendars Planings Element Masurements Analysis

Intervention date/week 2. Strategy 18 2.3 Maintenance Calendar Asset Work Procedure Intervention date/week Period

2. Strategy 2.3 Maintenance Work Order WO number Applicant Asset 19 2.3 Maintenance Work Order WO number Applicant Asset Type of work

2. Strategy 2.3 Maintenance Planing: Internal workers External Workers 20 2.3 Maintenance Planing: Internal workers External Workers External companies Worker 1 Internal Calendar Worker 1 Worker 3

2. Strategy 2.3 Maintenance Number of WO in Prisma3 during the years 21 2.3 Maintenance Number of WO in Prisma3 during the years 2012 2013 2014 2015 2016 2017 Preventive WO 2857 3040 3602 3738 4095 4273 Corrective WO 161 656 469 569 622 447

2. Strategy 2.3 Maintenance Reported time in Prisma3 during the years 22 2.3 Maintenance Reported time in Prisma3 during the years 2012 2013 2014 2015 2016 2017 Preventive hours 3914 4406 5296 5483 5684 6009 Corrective hours 409 1776 1988 3235 2802 2752

2. Strategy 23 2.3 Maintenance WO numbers vs reported time for 2018

2. Strategy 2.3 Maintenance WO numbers vs reported time for 2018 24 2.3 Maintenance WO numbers vs reported time for 2018 WO number vs hours Number Hours Internal preventive 3015 3829 External preventive 77 167 Conductive 443 295 Predictive 10 22,5 New installation 37 383 Improvements 35 507 Corrective 310 1444

3. Conclusions 25 Does the infrastructure section for the conventional equipment keep the knowledge in-house to maintain and operate the facility? Yes, they do. Just see the organization changes between 2011 and 2012. Does the Infrastructure section have the management of the conventional equipment? Yes, and the number of assets with some kind of maintenance has raised during these years . Is the cost related to personnel, spares and reposition optimized? Yes, the more preventive we plan, the less corrective should be done. But the preventive planed by date has to be moved to a preventive by parameter maintenance and increase the predictive maintenance.

3. Conclusions Anual cost: 2018 2019 (Prevision) People Mechanical 26 Anual cost: 2018 2019 (Prevision) People Mechanical 164.533 € 135.162 € 166.433 € 3 external Electrical 262.153 € 277.806 € Facility Services 696.765 € 20 external Total 1.289.884 € 1.276.166 € 23 external

27 Questions? Jordi Iglesias: jiglesias@cells.es