St. Joseph’s House of Hospitality

Slides:



Advertisements
Similar presentations
Kick Off WB assignment Measurement and Dimensions.
Advertisements

DESIGN OF A HOUSE A Presentation by: Ar. Anuja Gopal
IIT – Bailey Hall – Graduate Student Housing – Existing Conditions
Yellow Team Project Mockups Living and Working in Constrained Space.
My House. The Style of my Home The style of my home is called French Country.
FLOOR COLLAPSE PROP. COMPLETE FLOOR COLLAPSE PROP DIMENSIONS: 48” W, 48” H, AND 8’ L. CONSTRUCTED OF PALLETS, 2X4s, AND PLYWOOD WE ARE GOING TO MAKE ANOTHER.
Squidget Pop Top (PT) Tiny Travel Trailer
Sleeping Area and Bath Facilities
Here is an office or den.. You see a desk with computer on top and a big chair.
Table Table Table Table Table Table Table Table
Stair Design Weekend Cabin Retreat Project
Drafting symbols and lines
Birdcage Dome On A Mesa Chicken wire stretched over an interwoven hemispherical matrix of painted steel rebar forms a dome home. Between the chicken wire.
Competency: Design and draw interior elevations for kitchens and baths Objective: Explain the elements of kitchen and bath design.
Patient Handling Equipment From Low Tech to High What to Consider Lynn LaSalle, MOT Ergonomist MultiCare Health System.
The CKOV support By P Lau. Hall space available to the Ckov & TOF 0 Beam line 3.
1 Status of infrastructure MICE Video Conference, August 17, 2005 Yury Ivanyushenkov Applied Science Division, Engineering and Instrumentation Department.
FLOORSFLATSTOTAL AREA FIRST SECOND THIRD ST, 2 ND & 3 RD FLOOR PLAN FLOOR PLAN OF 2 BHK LUX. APARTMENT ON PLOT NO.
FOR SALE Napier Avenue Blackpool FY4 1PA Large Garage and patio garden PVCu Double Glazing & Gas Central Heating No Chain & close to the Promenade Large.
Lifting Hazards and some ideas on how to reduce your risk of lifting injury.
The new room. why a new room? did not satisfy the needs of consumer: adequate sleeping area independent work space (differentiated from sleeping area)
Practice House 1. Make a rectangular foundation 2. Put an interior wall in the middle. 3. Add an exterior door, interior door and at least one window on.
Housing I 7.04 Storage References: Homes & Interiors, p Lois Webber WSFC Public Schools.
Planning Back- of-House Support Areas Chapter 4 (c) 2014 by John Wiley & Sons, Inc.
Upgraded Injector Test Facility 2015 Users Group Board of Directors Update Akers/Experimental Nuclear PhysicsJanuary 13, 2015.
Supervisor: Dr. Mahmoud Dweikat.. Outline: 1. Introduction. 2. Static design 3. dynamic design 4. Conclusion.
Building Codes Intended to protect the public by establishing minimum standards of building safety.
Stackable Cots St. Joseph’s House of Hospitality Rochester, NY.
1. IS MY HOME BUILT ON A RAISED FOUNDATION? IF YOUR HOUSE IS NOT BUILT ON A CONCRETE SLAB, CHANCES ARE IT'S BUILT ON A RAISED FOUNDATION – THESE HOMES.
Tiny House Marcia Morrison. House layout Loft areaMain floor.
1 Mechanical for Oil Heat Mechanical codes. 2 Every state has codes. They may be the same in some states, but different in other states. Always have a.
THINKING INSIDE THE BOX CHAD HENNING, EFP ASSISTANT DIRECTOR, HOUSING PENN STATE UNIVERSITY.
CLEANING GUEST ROOM Pertemuan 5
House Bath CribHigh Chair Stroller Walker
GLAST LAT ProjectMarch 08, 2004 Page 1 ACD Installation, Post LAT CDR Response to GLAST LAT CDR RFA Number 13: MGSE Detailed Dimension Study [for ACD Installation]
1 Alwest Seating & Sleeping Accommodations Most Alcan/Alwest boats, at this point in their lives, have undergone some level of interior renovation.
LIVING AREAS. Living area Part of the house that friends and guest see. It is usually a place of show, recreation and entertainment. It roughly consumes.
GLAST LAT Project Page 1 ACD Installation, Post LAT CDR Response to GLAST LAT CDR RFA Number 13: MGSE Detailed Dimension Study [for ACD Installation] –A)
Floor Plan Sketch on 17” x 22” Graph Paper  Rough Scale Drawing  Room dimensions  Room Names  Basic House Characteristics AutoCAD floor plan including:
RENO IDEAS.
RENO IDEAS. LIVING ROOM LIVING ROOM EG. 1 Features: Track lights Featured wall (brick style) Wood flooring ceiling fan.
LAT Environmental Test PDR1 GLAST LAT Project3-4 May 2005 LAT Environmental Test Planning and Design Review 3-4 May 2005 Operations and Logistics LAT Environmental.
 Where the family sleeps, rests, and bathes  Takes up about 1/3 of the house  Should be in the quietest part of the house  Should be on the south.
Engineering Analysis ME 4182 Submitted 6/28/06 Yuki Miyasaka, Anthony Palladino, David Price, Whitney Price, Ricky Sandhu.
Exercise #2 (part 2) Based on what you read in Chapter 4, determine if the corridors and exit doors meet the requirements for egress width, according to.
Unit 3 Storage This unit is designed to give you an introduction to the concept of storage as it relates to the logistical handling of materials. Well-planned.
1 Three Basic Areas of a Residence Sleeping Area – Where the family sleeps and rests. Living Area – Where the family relaxes, dines, entertains guests,
LBNE Remote Handling Layout Options Adam Carroll Van Graves Tom Burgess FNAL/ORNL Videoconference March 11, 2010.
TPC Support Installation 26 Apr 2016Dan Wenman Mechanical Engineer1 Overview Installation of the support rails Details of the rail from the SAS to the.
Technology and Engineering
8 people per table, 10 tables in room plus head table
Housing I 7.04 Storage References: Homes & Interiors, p
(843) | Agent Open House Thursday, September 1st from 11:30-1:30 Light Lunch Catered by Hamby's 10 Fort Royal.
Traffic Patterns and Clearances
AS/RS (Automated Storage/Retrieval System)
8 people per table, 10 tables in room plus head table
Amazing Natural Light & Great Outdoor Living
Closet and Mattress Storage Improvements
Open Doors – Storage Committee
Designing the tiny house
HOSPITAL BED STORAGE manufactured by.
8 people per table, 10 tables in room plus head table
8 people per table, 10 tables in room plus head table
8 people per table, 10 tables in room plus head table
Traffic Patterns and Clearances
Concept Features Bus entry, exit and drive are separate from visitor and parent entry and drive Additional area behind building for bus traffic and turn-around;
Can I Help You? Can I help you? Can I help you?
Building standards Mr. Da Silva.
St. Joseph’s House of Hospitality Improvements
SC1R COLD BOX PLATFORM DESIGN LOADS: 150 PSF LIVE LOAD
Presentation transcript:

St. Joseph’s House of Hospitality Detailed Design Gate Review (Part 2)

Engineering Requirements Time to set up sleeping material Vertical distance to move sleeping material Time to clean up sleeping material Mattress dimensions Number of guests to accommodate Number of staff to set-up/clean-up Floor space occupied by the system Number of staff required to retrieve a guest’s belonging Volume of storage space per guest Total weight the system can support Bed Bug Resistance** Weight of guest’s belongings the system can support Time to retrieve personal storage Vertical distance from floor for overhead storage Horizontal distance to move sleeping material Safety Factor Sharon

Morphological Chart Steel Beams Ceiling Mount Extended Loft Platform Fork Lift to Loft Garage Door Lift to Loft Bunk Beds Cabinets Regular Cabinets Sharon

Pugh’s Table Ezra

Benchmarking- Sleeping Material Storage Connor Horizontal - 30 inches in kitchen. (maybe 3 and 7) Hospitality room - have the vertical on the right side.

Feasibility Storage Cabinets Storage Carts Space Utilization - see following slides Hospitality Room Kitchen Room Weight Capacity Storage Carts Casters rated for 500 lbs. Plywood rated for ~800 lbs. Assuming average tote weighs 30 lbs Total weight on cart will be 30 lbs *6 = 180 lbs Tipping Point Narrow side: 11.2° Wide side: 15.1° Connor Tipping Point feasibility notes: worried about any lips or tiles that have a gap/bump.

Bill of Materials Storage Cabinets Storage Carts Ezra

Design/Drawing Package Storage Cart Ken Have a 2 and 1 cart for the rooms. 2 bins per person - no more canvas bags They can just wash the bedding without the bags.

Design/Drawing Package Kitchen Room Cabinet Ken

Design/Drawing Package Hospitality Room Cabinet Ken

Combined External View Ken

Risk Assessment Removed two risks that were related to the aerial platform. The wiring of the system is infeasible Sleeping material platform falling Updated the actions to minimize risk to fit with the current concept. Sharon Add mice to list of pests

Problem Tracker Sharon Take weight of totes in the storage closet

Updated Plan Sharon Shelter ends in the middle of april.