GP Clinical System Migrations SCIMP Conference 2010 Louise McTaggart GG&C Contractor Services Manager Lyall Cameron A&A eHealth Facilitation Manager Dr.

Slides:



Advertisements
Similar presentations
Joint Portal USER CONFERENCE & SYMPOSIUM 2013 MASTERING HEALTHCARE STRATEGIES AUSTINTEXAS.
Advertisements

1 Contract Inactivation & Replacement Fly-in Action ( Continue to Page Down/Click on each page…) Electronic Document Access (EDA)
RiO R2 Enhancement overview. R2 changes and updates to Functionality Local System Administration New enhanced user administration screen with tab facilitates.
Whats wrong with a piece of paper? The Electronic Transfer of Care Princess of Wales Hospital Rowena Lewis.
EPS in Practice Manpreet Pujara GP National Clinical Lead & Clinical Director EPS.
Medical Informatics Assignment II I.T. in General Practice The Castle Surgery, Carrickfergus Leah Spence, Philip Anderson.
New Trials If you are seeking a collaboration with the UCL CCTU we require you to apply: At least 3 months before the application deadline By using the.
GP2GP Electronic health record transfer 1. What is GP2GP? GP2GP is a software application that can be used to transfer a patient’s electronic health record.
Design Review Welcome Bassam Sanadiki Sr. Engagement Leader.
+ HEALTH INSURANCE: UNDERSTANDING YOUR COVERAGE Navigator Name Blank County Extension UGA Health Navigators.
Next Throughout this demo, if nothing happens for a couple of seconds click ‘Next’ to continue … SCI Gateway Product Demonstration Updated next.
National Adult Clozapine Titration Chart
Sharing electronic records - Lessons from the Emergency Care Summary in Scotland Libby Morris, Clinical e health lead Scottish Government 2nd May 2012.
EMIS Web Sorting out RBAC.
SEVOCITY WELCOMES 1. AGENDA Introductions Key Responsibilities Review of Key Information Major Project Steps – Review 2.
Workflow Redesign for Behavioral Health Providers
EMIS Web Dispensing Overview from a Users perspective
EPharmacy Programme: the electronic Acute Medication Service (eAMS) ePharmacy Programme: the electronic Acute Medication Service (eAMS)
Electronic Prescription Service (EPS) Release 2 Avon Local Pharmaceutical Committee 26 th March 2014 Jane Schofield – Programme Manager.
A new approach: Extending the role of Pharmacy in Primary Care Workstream lead: Ramiz Bahnam.
Health Insights – Leeds 8 th October 2014 Dr Taz Aldawoud Digital Clinical Champion - NHS
The Royal Wolverhampton Hospitals NHS Trust Induction ELECTRONIC DISCHARGE NOTIFICATION Presented by: IT System Trainer.
Supporting people in Dorset to lead healthier lives Overview of EPS2 Release 2.
Emergency Care Summary Dunblane November hb2008. NHS in Scotland 14 Health Boards –Primary and Secondary Care 1030 Practices –GPASS, InPS, EMIS, Ascribe.
Why Practices need to change Paul Baughan GP Roslynne O’Connor Practice Manager.
Switching Clinical Systems Our GP Practice story: “A walk in the park” Alison Campbell Tweeddale Medical Practice Fort William Highland.
Complex Care Management In Practice Dunblane Tuesday 6 th November 2007.
07/07/15 Epic Combined EPAC: Key Takeaways For Executives/SMEs/Workgroups/Application Teams 1.
Coordinator University Clinical Research Pharmacy Investigational Drug Service (IDS) Marjorie Shaw Phillips, MS, RPh, FASHP Clinical Research Pharmacist.
28/08/2015Changing Clinical Software1 Dr Colin Brown General Practitioner SCIMP Director eRecords SCIMP Conference Dunblane 2007.
Linking EDT to RMS to Allow 2- Way Communication with GPs Martin Paxton IT Programme Manager Dudley Group NHS Foundation Trust.
Managing the Medico-Legal Risks of System Migration Liz Price Training and Consultancy Manager.
CHRONIC MEDICATION SERVICE Dawn Balfour Community Pharmacy IT Facilitator.
Background PM Challenge Fund Local General Practice EPiC Choice of pharmacy Workstreams.
LENGTH OF DELAYED DISCHARGE CAUSED BY GUARDIANSHIP AUDIT Dr Roger Cable Speciality Registrar Old age psychiatry.
IHS EHR Indian Health Service Electronic Health Record Pharmacy CDR Jim Gemelas, R.Ph. Clinical Applications Coordinator.
EPS Release 2 Rebecca Pierce & Bet Rudge. You are ready…. Do you have working smartcards? Are your nominations in a cupboard on paper – not on the spine?
Prescribing Errors in General Practice The PRACtICe Study (2012) GMC Investigating Prevalence and Causes.
A new approach: Extending the role of Pharmacy in Primary Care Workstream lead: Ramiz Bahnam.
Emergency Care Summary SCIMP Conference - Dunblane 7 th November 2007.
Carryduff: The Paperless Practice Use of Computers in General Practice Stewart Paul Jonathan Reaney.
Calculating Quality Reporting Service – an introduction Chris Brown CQRS Design, Build and Test Project Manager 05 September 2012.
Electronic Palliative Care Summary (ePCS) Dr Peter Kiehlmann GP, Aberdeen & National Clinical Lead Palliative Care eHealth
Pharmacy Services North Glasgow Trained Nurses Induction Talk.
Dr Libby Morris The Emergency Care Summary Dr Ian Kerr The Emergency Care Summary NMAHP Meeting 6 th March 2007 Dr Ian Kerr.
19/12/2015Changing Clinical Software1 Dr Colin Brown General Practitioner SCIMP Conference Dunblane 2006.
Camden Vision Agnès Rieu & Hasib Aftab Working with the people in Camden to achieve the best health for all.
March 24, 2010 Sunflower Project Monthly Conversion Meeting – March.
Preparing for EPS2 LPC Forum 8th May 2014
Agenda BupaPrivate and Confidential Implementing a training and accreditation scheme for TTA pre-pack dispensing R Betmouni, N Gillani Pharmacy Department,
Medway Care Home Team Dr Sanjay Suman – Consultant Geriatrician - Medway Foundation Trust Prina Sahdev – Care Homes Pharmacist - Medway CCG.
Patricia Alafaireet  Lecture 2 – Implementation and go-live strategies Data conversion Communication Planning Downtime.
NHS e-Referral Service Making paperless referrals a reality.
Moving from paper to electronic prescriptions. EPS in a nutshell EPS enables prescriptions to be sent electronically from the GP to the pharmacy ready.
Moving from paper to electronic prescriptions
Presenter: Igna Visser Date: Wednesday, 18 March 2015
The NHS Urgent Medicine Supply Advanced Service Pilot
Choice – 6 Steps, 6 Actions, 6 Weeks
MAINTAINING THE INVESTIGATOR’S SITE FILE
Electronic Repeat Dispensing (ERD)
Electronic Prescription Service
Electronic Prescription Service (EPS)
Special Topics in Vendor-Specific Systems
Extending the role of Pharmacy in Primary Care
Systems Thinking for Everyday Work (STEW) Worksheet
MAINTAINING THE INVESTIGATOR’S STUDY FILE
Background PM Challenge Fund Local General Practice EPiC
Health Care Information Systems
BNSSG STP Apprenticeships
Getting Started Checklist
Presentation transcript:

GP Clinical System Migrations SCIMP Conference 2010 Louise McTaggart GG&C Contractor Services Manager Lyall Cameron A&A eHealth Facilitation Manager Dr Jim Campbell GP & Clinical Director eHealth A&A

GPASS to EMIS Migrations Greater Glasgow & Clyde Louise McTaggart GG&C Contractor Services Manager

GPASS Replacement Background Scottish Government decision GPASS to be retired by Mar 2012 Local Specification of Requirements completed following national framework agreement Tender responses evaluated and scored and recommendation made LMC endorsed decision to award single supplier contract to EMIS in May 2010

GPASS Replacement Migration Process Approx 12 week process Key Events Practice agree to migrate and are scheduled Project Management visit completed by Mentors Uplift copy of backup for trial data conversion Trial data conversion carried out EMIS client installed on up to 3 PCs in practice – practices to consider which PCs to use to allow checking from GPASS to EMIS Practice trained how to check data Report inconsistencies Practice sign off data

GPASS Replacement Migration Process (cont) Key Events (Contd) Engineering commences Final (live) data conversion Pre Go Live Training Practice configuration – users, appointments, templates, etc Go Live Post Go Live Training – mop-up, qof, searches, recall, etc Practice Acceptance Sign Off

GPASS Replacement Key things during migraton period:- Trial Data Migration – Data Checking Practice need to clinically sign off data Project Board agreed a recommendation of a minimum of 50 patient records (can be as may as the practice feel comfortable with) Cross section of patient records – Diabetic, pts with long history, pts with lots of drugs, < 5s, etc Discussed with practices to consider resourcing this, time allocated, date for completion Tidy up of Practice Drugs and Allergy Read Codes Again resourcing this, highly recommended to do prior to final conversion

GPASS Replacement Week of Migration Monday – Friday process EMIS engineer arrives on Monday morning to set up system on new server. GPASS available all week (BUT need to recapture info in EMIS post migration), can use for scripts, referrals, looking at appts, etc Live data conversion commenced Server install and client configuration (inc 3 rd party apps) completed User configuration/commissioning completed Uninstall of GPASS applications and 3 rd Party apps Reconfiguration of Docman, SCI Gateway and Label Trace Appointment configuration Starting to use system Go Live

GPASS Replacement Practice Information/Support Practice Migration Information Pack Ayrshire & Arran reporting database support queries CHCP Awareness Session Mentoring Team support Lessons Learned information

GPASS Replacement Practice Preparation 2 key things for a successful migration, Practice preparation and enthusiasm Consider key leads for admin and clinical side Consider communication with patients well in advance Consider how data will be captured at downtime Consider the issue of scripts + letting Pharmacists know

GPASS Replacement Practice Preparation Consider Docman workflow that week Consider on the day appointments for engineering week and go live week Consider catch up after downtime CDM LESs/QOF Reviews – run in advance Consider gaps in Appointment book after go live

GPASS Replacement Training Package Project Management Session with Facilitator Trial Data Training Day with EMIS Pre-install role based training, 2 days, engineering week with EMIS Commissioning day with EMIS and Facilitator 2 days go live training with EMIS OM and Floorwalker plus Facilitator

GPASS Replacement Training Package Half day follow-up on Friday of go live week with Facilitator 5 post go live days, approximately 1 a week 2 day Superuser course Half day Appointments course Standard training plan, sequence Standard recall approach Consistency of templates

GPASS Replacement Issues Encountered, so far.. Drug matching Data Transfer Issues: - SCI Gateway; SCI DC; Date Recorded; Invalid Dosages and Quantities; Independent Nurse Prescribing Pharmacy text Completion of Clinical Commissioning tasks Training – consistency of OM, non standard approach, Glasgow specific (LESs; Formulary, etc)

GPASS Replacement Whats worked well:- Project Manager from EMIS based with GGC team Regular workshops with EMIS, 3 rd Party Suppliers and internal teams to improve process Development of a GGC EMIS OM team Mentoring Team developing close working relationship with EMIS OMs Superuser course and Appointments course prior to migration

Lyall Cameron eHealth Facilitation Manager NHS Ayrshire & Arran

Data Transfer Project Management Pre Go-Live Checklist

Data Transfer Gpass Extract / Guidance BMI Script Destination

Gpass Practice Config Gpass Patient Disposal Info EMIS Screen Message EMIS Patient Script Destination Info

Project Management Appointments Repeat Prescriptions Engineering Week 3 rd Party Applications Commissioning Info

Pre Go-Live Checklist Medication Review Diary Entries BMI Script Destination Drug Indications A&A Formulary Registrations ePharmacy (AMS) Electronic Lab Imports Commissioning Information

The Townhead Experience A Clinicians view Dr Jim Campbell

Preparation Data checking –Longtitudinal and Cross sectional RD Searches –Codes –Drugs –Changes in GPASS –Not signed off till near end –Need to remember when Data sent –Logging Issues

Preparation Training –By Discipline –By Subject Planning –Prescriptions Advance printing Pharmacy

Migration Surgery still open Used GPASS Bookable on the day Publicity Only without Docman for short period Access to PCs Configuration/Commissioning Used Saturday morning for familiarisation

Going Live Started later on first day 15 minute appointments with breaks Help available Appointments Only Bookable on the day Appointment system difficult to set up Special Requests not workable Setting up PCs

Post go Live Templates Lab results –Change of working practice Drug Matching Code matching Access to GPASS Entry of Information from GPASS

Getting System working –Pharmacy Text –Drug Indications –Authorising Scripts –Q Drugs –Documents –Searches –Recall –AAHB Drug Formulary Post Go Live

Conclusion Planning Essential but must adapt Decide in Advance Training Training Training!!! Still learning about system At the same level achievement for new contract as at same time last year Still have some blocked appointments Went more smoothly than expected Remember it is not GPASS!

Thank You Any Questions?