University of Kentucky Supply Cabinet Quote Analysis Date: 12/21/2009.

Slides:



Advertisements
Similar presentations
National Fighter Procurement Secretariat Secrétariat national dapprovisionnement en chasseurs Seven-Point Plan National Fighter Procurement Secretariat.
Advertisements

© BMA Inc All rights reserved. Decision-making Making routine decisions without the help of standard costs.
Flex in the Salesforce Cloud Markus Spohn Director of Product Management.
1 Comments for Workshop on EEU Budget for August 6, 2008.
Make vs Buy Decision D0394 Perancangan Sistem Manufaktur Pertemuan IX - X.
NAV 2009 and The Role Tailored Client Get More from Your ERP Solution & Prepare for Better Times Ahead by Upgrading to Microsoft Dynamics NAV 2009.
UBA WellnessWorks Wellness Program
© Fujitsu Limited, 2010 Fixed Asset and Prepaid iProcurement Training.
AMERICAN STEEL CORPORATION Next class: Formosa Plastics.
Fixed price contract: A contract that provides a price for each procurement item obtained under the contract.
OptiShip ® Multi-carrier Shipping System. OptiShip ® customers save on average 13.6% of parcel shipping costs… OptiShip ® is a comprehensive system that.
GSA Federal Supply Service DOING BUSINESS WITH GSA.
Psych 253 Judgments and Decisions Negotiations
Breakfast & Lunch Price Adjustment Report Board Report 5/19/09 Lodi Unified School District Prepared by: Douglas Barge Warren Sun.
LAPTOPS – a caution. Every year a committee made up of parents and school staff reviews the laptops available on the market, and the kinds of support.
CH 7. Organizational buying refers to the decision-making process by which formal organizations establish the need for purchased products and services,
Welcome to MiCTA Learn about MiCTA’s National E- Rate Program.
Welcome to MiCTA Learn about MiCTA’s National E- Rate Program.
Overview of ICD-10 Transition
Principles of Marketing
Copyright 2004 © Pearson Education Canada Inc. 8-1 Chapter 8 Analyzing Business Markets and Business Buying Behaviour.
First Cut Training Oracle Sourcing. Agenda Day 1- 1 st Half Overview Features Creation of Supplier Lists Creation of Attribute Lists Creation of RFQ Supplier.
Systems Analysis and Design in a Changing World
Chapter 8: Evaluating Alternatives for Requirements, Environment, and Implementation.
EYYUP ORAK Material requirements planning (MRP) is a computer-based inventory management system designed to assist production managers in.
W ASTE + C OLLECTION Vendor Selection Team Training P RESENTED BY : COPE Administrative Team Skip Roos & Carole Cooper July 29, 2014 Carol Richter Mark.
LOCAL REGULATION AND CLIMATE CHANGE QUICK TELECONFERENCE American Bar Association Section of Environment, Energy, and Resources Climate Change, Sustainable.
4. Project Investment Decision-Making
Short-Term Financial Management
Chapter 19 The Foreign Exchange Market. © 2004 Pearson Addison-Wesley. All rights reserved 19-2 Exchange Rate An exchange rate can be quoted in two ways:
Managing the Information Technology Resource Jerry N. Luftman
COMMERCIAL “SOLE SOURCE” PROPOSAL ANALYSIS ROADMAP 1. Is information available within the Government? Step 1 – Information within the Government If Yes.
8 Systems Analysis and Design in a Changing World, Fifth Edition.
16-1 Copyright © 2004 by Nelson, a division of Thomson Canada Limited. Financial Performance Evaluation and Transfer Pricing in the Decentralized Firm.
SDLC Phase 2: Selection Dania Bilal IS 582 Spring 2009.
Economic Aspects of Information Systems Updated 2015 MIS 2000 Information Systems for Management Instructor: Bob Travica.
Chapter 3 – Opportunity Cost of Capital and Capital Budgeting
Chapter 8. Learning Objectives (part 1 of 3) Decide whether to buy or rent. Obtain information on houses for sale Understand the benefits and costs of.
Long-Term Investment Decisions
Using Microsoft ACCESS to develop small to medium applications on campus.
1 S ERVICE · A CCOUNTABILITY · V ALUE · E FFICIENCY.
Moving into Design SYSTEMS ANALYSIS AND DESIGN, 6 TH EDITION DENNIS, WIXOM, AND ROTH © 2015 JOHN WILEY & SONS. ALL RIGHTS RESERVED. 1 Roberta M. Roth.
Analyzing Business Markets
2013 SCPTA Legislative Advocacy Platform Presented by Joy Grayson VP Legislation SCPTA Special Thanks to: Public Education Partners of Greenville County.
12-1 Project Management from Simple to Complex This work is licensed under the Creative Commons Attribution-Noncommercial-Share Alike 3.0 Unported.
State of Maine NASACT Presentation “Using the Business Case to Guide a Transformation Procurement” 1 Using the Business Case to Guide a Transformation.
Food Service Management Companies ARTs Conference, August 13, 2014 Department of Education Division of Program Support Bureau of Nutrition Programs and.
1 Predevelopment Suzanne Keech Corporate Managing Director, Studley, Inc. June 2010.
© Oklahoma State Department of Education. All rights reserved.1 Housing Alternatives Standard Renting vs. Buying.
1 What’s Next for Financial Management Line of Business (FMLoB)? AGA/GWSCPA 6 th Annual Conference Dianne Copeland, Director, FSIO May 8, 2007.
CHAPTER 4: Procurement.
SDLC 1: Systems Planning and Selection Dania Bilal IS 582 Spring 2008.
Chapter 16Copyright © 2010 by Nelson Education Ltd. Buyout Opportunities 16 PowerPoint Presentation by Ian Anderson, Algonquin College.
1 Chapter 1 Introduction to Accounting Information Systems Chapter 17 System Selection and System Design.
Today (2/11) Class schedule update & Presentation Forums (10’) Corporate Technology Commercialization- Dr. Thomas Lindner (40’) Developing timelines and.
Storm Water Permitting. Oil And Gas Operator Concerns  Impacts of Storm Water Permitting on Operators who do business primarily – On Privately Owned.
3-1Copyright ©2013 Pearson Education, Inc. publishing as Prentice Hall. Course Code MGT 561 Supply Chain Management Book: Supply Chain Management Strategy,
An understanding..  It is a market where money or its equivalent can be traded.  Money is synonym of liquidity.  It consists of financial institutions.
1 Advanced Accounting Autumn 2015 Chapter 12 Part I Bill Myer – Autumn 2015.
Chapter 11 Managing Inventory throughout the Supply Chain
U-M Travel and Expense System (Concur) Project Unit Liaison Meeting 4/15/09 U-M Procurement Services, 2009.
Chapter 3: Purchasing Research and Planning Strategic Planning for Purchasing Strategic planning for purchasing involves the identification of critical.
Swapalease.com How to Negotiate a Car Lease. Know the Negotiable Terms for Your Lease Car leases are made up of many factors that determine the final.
SW 820 – Building Supplies Oklahoma and Lowe’s Building Centers Contact: Lisa Bradley
Systems Analysis and Design in a Changing World, Fifth Edition
Maine's Standard Offer Service
Sourcing Issues in outsourcing..
Presentation to Michael Lynton July 24th, 2012 DRAFT June 27th, 2012
Together, We Care More Meet MMCAP Infuse.
Presentation transcript:

University of Kentucky Supply Cabinet Quote Analysis Date: 12/21/2009

Proposed Discount Structure -2-

Quote Analysis -3-

Other Related Costs Buyout Effective 7/1/2010 –Pyxis- $1,418, –Omnicell- $ 870, Interface estimates –Pyxis- between $1,500-$25,000 depending upon if Pyxis can use existing files for materials –Omnicell- RX interface $160K Facility costs –Undefined at this time but assumed to be roughly equivalent for both vendors; impact would be primarily at Good Samaritan to accommodate combination cabinets -4-

Omnicell Pros Technology is ahead of the competition at this time Feedback from the onsite demo was favorable and ranked higher with those who submitted a survey response Omnicell has recognized our desire to move to one platform –Given our history with Optiflex, the vendor is willing to convert all systems to the Omnicell platform resulting in improved reporting and standardizing to the more reliable –The cost of the upgrade is as follows: Cons Historical difficulties with Optiflex (open) system have resulted in damage to the vendors reputation internally –This has improved since the new rep was assigned to the account; it is unclear how much of the improvement can be attributed to the current proposals on the table Significant interface development will be required for the RX system Pricing is not favorable as currently quoted Cardinal Assist is not available until 7/1/10; possible risk if delayed No volume discount proposed for annual service expense -5-

Pyxis Pros Avoidance of significant interface development for the RX component Perceived to be the better long-term partner based upon cooperation during the negotiation period Came out ahead in weighted scoring as rated by key members of the selection committee Favorable price by comparison No risk associated with Cardinal Assist program Cons Currently behind in technology –Nurse link product just released –Other desired features are in development but not yet released -6-

Opportunities Pyxis Pre-negotiated an additional discount for infusion pumps should we decide to convert –Analysis is underway; cannot currently purchase Baxter pumps which are the Chandler –Discount = Novation, + volume discounts, +5% Potential for luminary site designation Omnicell Potential to outsource soft good inventory (braces, etc.) and billing to third party Cardinal Assist non- compete expires 7/1/10; possible short term risk of losing this service if not ready to go at experation -7-

Next Steps Approval will commit us to retrofitting existing Chandler to a standard vendor for both RX and supplies Finalize configuration decision for Good Samaritan –Open vs. Duo Station option –Larger footprint requirement for duo station –Facility costs associated with this change yet to be identified but should be similar regardless of vendor choice –Closed Angio cabinetry –Tissue Center currently quoted as an option Resolve buy-out amount –Pyxis quoted a deeper discount as opposed to a true-buy-out figure Finalize the recommended configuration and timeline for the rest of the PCF and existing Chandler –Determination from HITS if multiple vendors/interfaces are possible for a period of time Determine lease vs. purchase -8-